Public tenders for architect, architecture in Pforzheim Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural services for buildings

Stadt Pforzheim | Published September 7, 2016
Winner
VON M GmbH
cpvs

The inner city, with the help of the Allies, in 1949 established the House of Youth in Benckiserpark is to redevelop. In 2-stage VOF procedure object planning services are advertised from LPH. 3

Architectural services for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published November 27, 2015
cpvs
71221000

Dienstleistungen von Architekturbüros bei Gebäuden

Architectural, construction, engineering and inspection services

Stadt Pforzheim | Published July 30, 2015
Winner
Bodenmechanisches Labor Gumm
cpvs
71000000, 71300000, 71350000, 71351500, 71352000, 71351100, 71351220, 71900000

Carrying out soil investigations in the urban area Pforzheim (Framework Agreement) from 08/01/2015 - 31/07/2018.

Architectural, construction, engineering and inspection services

Stadt Pforzheim | Published December 28, 2016
Winner
Klinger und Partner
cpvs
71000000, 71300000, 71322500

Procurement of engineering services for the conversion of the Western Karl-Friedrich-Strasse between pedestrian Brötzingen and Belfort Street / youth in Pforzheim.

The city Pforzheim intends the reconstruction of Western Karl-Friedrich-Strasse between pedestrian Brötzingen and Belfort Street / youth in Pforzheim on cycling axis. The construction work is scheduled to begin in July 2017 and be completed by November of 2019. Eligible total construction costs for the measure are net about 2,965,000 EUR.

Architectural, construction, engineering and inspection services

Stadt Pforzheim | Published August 27, 2016  -  Deadline September 23, 2016
cpvs

The city Pforzheim intends the reconstruction of Western Karl-Friedrich-Strasse between pedestrian Brötzingen and Belfort Street / youth in Pforzheim on cycling axis.

Architectural, construction, engineering and inspection services

Stadt Pforzheim | Published September 27, 2016
Winner
Prior 1 GmbH
cpvs
71000000, 71320000

The contract includes the engineering services for the transfer of existing IT equipment rooms, Construction

new IT security rooms for the accommodation of central communication components, PBX,

Server systems, traffic control and passive network and cable distribution.

Architectural services for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published January 5, 2016
Winner
Birk Heilmeyer und Frenzel GmbH
cpvs
71221000

72160 Horb, Horn Austr. 8, new Transport Commissioner and the police station, architectural services under Part 3 section 1 HOAI. As part of the police reform in Baden-Württemberg is in Horb am Neckar the Transport Commissioner, an agency of the Police Headquarters Tuttlingen housed, and the entire police station Horb be resettled, which is still in the historic Fruchtkasten is currently located in downtown Horb. The rehousing is the site Horn Austr. 8 is provided. At present it houses a building with a garage, garages, offices, apartments and a gas station. These buildings will be demolished and replaced by a new, highly energy-efficient buildings, in which the traffic police station and the police station Horb be housed with all its functions. Both organizational units (traffic monitoring and police station) are autonomous. However, you should use the entrance etc., meeting rooms together. They do not require strict separation, but should have been identified as related functional units. The guard of the police station is the contact point for all visitors. The space requirement is composed of 1 145 m2 floor space. In addition, 5 garage spaces and 18 covered parking spaces are needed. For this purpose, total construction costs amounting to a maximum of 800 000 EUR are 5 (gross) cost group 200-700 in accordance with DIN 276-1: 2008-12, provided. The plot Horn Austraße 8 is located on the B 32 at the eastern entrance to the town of Horb in a prominent location. There are therefore provided with respect to design and urban integration of high demands. Of the selected candidates are proposed solutions for the planning task in accordance with § 20 Abs in the 2nd stage of the process. 3 VOF be worked out in the form of a project outline, which are decisive for the selection of the contractor. The planning and execution of the tasks must be performed by personnel reliability checked.

Architectural services for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published August 22, 2015  -  Deadline September 17, 2015
cpvs
71221000

72160 Horb, Horn Austr. 8, new Transport Commissioner and the police station, architectural services under Part 3 section 1 HOAI As part of the police reform in Baden-Württemberg is in Horb the traffic police station, a department of the police headquarters Tuttlingen housed am Neckar, and the whole police station Horb be resettled, which is currently still in the historic Fruchtkasten in downtown Horb is a resident. The rehousing is the site Horn Austr. 8 is provided. At present it houses a building with a garage, garages, offices, apartments and a gas station. These buildings will be demolished and replaced by a new, highly energy-efficient buildings, in which the traffic police station and the police station Horb be housed with all its functions. Both organizational units (traffic monitoring and police station) are autonomous. However, you should use the entrance etc., meeting rooms together. They do not require strict separation, but should have been identified as related functional units. The guard of the police station is the contact point for all visitors. The space requirement includes 1,145 m2 of floor space. In addition, 5 garage spaces and 18 covered parking spaces are needed. For this purpose, total construction costs amounting to a maximum of 5,800,000 euro (gross), cost group 200-700 in accordance with DIN 276-1: 2008-12, provided. The plot Horn Austraße 8 is located on the B 32 at the eastern entrance to the town of Horb in a prominent location. There are therefore provided with respect to design and urban integration of high demands. Of the selected candidates are proposed solutions for the planning task in accordance with § 20 Abs in the 2nd stage of the process. 3 VOF be worked out in the form of a project outline, which are decisive for the selection of the contractor. The planning and execution of the tasks must be performed by personnel reliability checked.

Architectural, engineering and planning services

Eigenbetrieb Stadtentwässerung Pforzheim | Published February 14, 2015  -  Deadline March 5, 2015
cpvs
71240000, 71320000

Dienstleistungen von Architektur- und Ingenieurbüros sowie planungsbezogene Leistungen

Architectural services for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published April 24, 2015
Winner
K + H Architekten und Generalplaner GmbH
cpvs
71221000

75323 Bad Wildbad, Kuranlagenallee 8, repair of the spa. Architectural services under Part 3, Section 1 HOAI. The spa was built in 1908 to 1910 in the bathroom Wildbader spas and designed by Otto Kuhn. The stately building with Art Nouveau elements is a listed building and has a net floor area (NGFa) with 3 280 m2. He has event space, a large hall with a stage and a catering establishment. The building has undergone major changes since 1956 already and got the last comprehensive rehabilitation 1983-85. This was accompanied by considerable spatial interventions. After 30 years of use, the building requires not only inside but also on the entire outer shell of a reorganization. Leaks in the roofing and moisture damage to the facade in the wood shingle cladding and also in the base area must be eliminated. The windows of different construction periods are to be investigated and if necessary, revised. Here, in all parts of the action, taking into account economic, environmental and heritage aspects, energy improvements as much as possible to be achieved. Larger spatial interventions and functional changes are not planned. Nevertheless, the construction by the requirements for preventive fire protection at a venue as well as the need to adapt the technical building equipment to current standards will not be insignificant. All actions and decisions have to be taken into account historic preservation concerns and be coordinated with the appropriate conservation authority. When editing original buildings restorers are to participate. The total estimated construction cost around 8 000 000 EUR.

Architectural services for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published January 25, 2017
Winner
Wörmann Architekten GmbH
cpvs
71221000

Pforzheim, Rohrstr. 17, set up a detention center for Ba.-Wü., architectural services under Part 3 section 1 HOAI, Phases 3 to 8 and Special Services of the power stage 9 (documentation).

Because of a court judgment of the ECJ rejected asylum seekers may not be housed in prisons. The state of Baden-Württemberg has given the current use of the building in Pforzheim, tube 17, as a prison. The building is to be transformed with the judgment accordingly. During the final stage, 80 people can be accommodated. It is aimed at the greatest possible freedom of movement, taking into account the necessary security measures. With substantial retention of the building structure of the previous cell block is to be largely divided into individual housing groups with 6-9 residents. As central institutions rooms for administration, prison service, the medical field, the utilities, the Visitor and lounges of the new use should be adjusted. Consideration must be given to complex functional requirements. The structural measures are largely limited to indoor use. Already in April 2016 about 20 people can be accommodated in provisionally converted residential groups. The construction work must therefore be in full operation in sensible portions. Since this is a very sensitive area and extensive benefits of building services are to be integrated, a high coordination effort in the construction management phase is required. Estimated total construction costs max. EUR 6.3 million.

The architects are expected to set up on the basis of the existing feasibility study, in close coordination with the HLSE-planners and compliance with the existing buildings and an upper cost limit, to calculate the cost of conversion and a design and manufacturing schedules. After LV preparation and tendering procedures consistent site management is expected.

Architectural services for buildings

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published November 18, 2015  -  Deadline December 14, 2015
cpvs
71221000

77694 Kehl, port road, construction of the new German-French Water Police Station, architectural services under Part 3 section 1 HOAI, work phases 2 to 8 and Special Services of the power stage 9 (documentation). The Water Police Station (WSPSt) is currently in Port Kehl in the building Hafenstr. 21 is accommodated. The office of the French Water Police is housed in the immediate vicinity since 2012 in containers. For both services, a common construction, including garages and ancillary facilities to be built in the immediate vicinity. Here, the particular importance of cross-border project in an urban situation is very difficult, both functionally and creatively into account. The number of jobs is 27, the useful surface amounts to approx. 1310 m2. The total estimated construction costs will be around. 4.2 million EUR. The planning and execution of the tasks must be performed by personnel reliability checked.

Construction work

Stadt Pforzheim | Published August 8, 2015  -  Deadline September 15, 2015
cpvs
45000000, 71000000

The area is divided into 2 building plots: Mixed Quartier am Rathaus (Baufeld 1) und Wohnen am Schlossberg (Baufeld 2). For the construction site 2 but an economically and technically feasible concept is expected. In addition, the city expects to demonstrate an adequate size of the living quarters to strengthen the inner-city living. Special emphasis is therefore placed in order to obtain a diverse in all respects downtown district on diversity in urban development, land use strategy and architecture. The trading range is designed to complement the existing already in the downtown area offers complementary trade. There is also the part of the city interested in renting additional office space of up to 4 200 m2 respectively, depending on the conditions also beyond. The investor has to undertake to build the necessary for the internal development of land plants at its own expense and to implement measures.

Architectural services for building extensions

Land Baden-Württemberg, vertreten durch den Nationalpark Schwarzwald, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published September 5, 2015
Winner
Kunstraum GfK mbH
cpvs
71223000, 92521100

Baiersbronn / Hearthstone, visitor and information center National Park Black Forest, exhibition design. On 1.1.2014 the Black Forest National Park was established in the northern Black Forest. As a central and attractive focal point to a visitor and information center with a focus on environmental education, visitor information and visitor management at Hearthstone, a pass to the Black Forest High Road, about 900 meters above sea level, can be realized. In addition, information center there is a part of the National Park Administration either in the monumental "Villa Klumpp" or related to the visitor u. Be accommodated. The visitor center contains a about 1 000 m2 permanent exhibition more functional units such as the foyer with the checkout area, temporary exhibition space, store, small movie theater, restaurant and rooms for events, seminars and for pedagogical work. Heart of the visitor center is the exhibition area where the motto "Let nature be nature" of the National Park is the focus. For the duration of the exhibition a scenographically designed presentation is desired, representing a high value experience and information for different audiences with differentiated levels of understanding, interactive elements and a mixture of dioramas, display cases and multimedia productions. Conceivable is an introductory section on a third of the area and six to eight themed areas to deepen. Adjacent opportunities should be offered to play and rest in a private children's section of the permanent exhibition. Great emphasis is placed on the visual relationships between inside and outside. The cost ceiling for the exhibition design is 3 million EUR gross. It is envisaged that the exhibition designer is already mandated to start planning the building. It is therefore sought to integrate from the beginning the planning exhibition design in the overall planning of the object.

Architectural, engineering and planning services

Eigenbetrieb Stadtentwässerung Pforzheim | Published August 25, 2015
Winner
Weber-Ingenieure GmbH
cpvs
71240000, 71320000

For the realization of the 4th purification stage intended the natural Stadtentwässerung Pforzheim, tender planning services in a Europe-wide contract award procedure in accordance with the provisions of the VOF and gradually to instruct. All planning services (especially for civil engineering structures, technical equipment, structural engineering and other planning services) to a total of - subject to the discretion of the self Stadtentwässerung Pforzheim to call for a portion of the advertised performance levels - awarded to a general planner werden.Die holistic integrating a master planner was selected in order to avoid technical interfaces in the planning and bundle responsibilities for the feasibility of the plan in one hand. The self Stadtentwässerung Pforzheim makes the implementation of the project depends on the results of the cost calculation and the granting of public funding. Therefore, a construction decision for realization of the project is not yet available. It is so far also still unclear whether a building permit and / or a water permit required for the project. Subject of the advertised - and charged with awarding a contract - Performance level 1 are planning benefits the power phase 2 and phase 3 performance for all project components (especially engineering structures, technical equipment, structural engineering). Subject of the power stage 2 are as required planning services the power stage 4, which would be required for approval of the project. Subject of performance level 3 design services of power phases 5 to 8 of the power images of Structures, Technical Equipment and performance phase 5 to 6 during performance image structural engineering. Subject of the power stage 4 is the power stage 9 of the images of Structures and Technical Equipment.

Architectural, construction, engineering and inspection services

Stadt Pforzheim | Published August 29, 2015  -  Deadline September 28, 2015
cpvs
71000000, 71300000, 71322000

In a first phase of construction is now the northern half of the area is being implemented. The construction can begin in summer 2016 and be completed by the autumn 2018th For this purpose, separate agreements with the three principals and green areas Tiefbauamt (GTA), Eigenbetrieb Stadtentwässerung Pforzheim (ESP) and Stadtwerke Pforzheim close (SWP). 450 000 EUR. The existing planning services are the bidders, who will be invited to negotiate provided (3-5 bidder) in the form of a data DVD. It is important to ensure that the construction works must be advertised throughout Europe. In the streets, upgraded is collecting and service roads that are built mainly on the lines of already existing paths. Construction phase of the area "Lange Won" and the subsequent connection of the neighboring territory "Short Won" considered. Bauabschnitt an increase in the efficiency of the rainwater drainage realized (separate project). 145 m, DN 300). Not part of the services are tube works and electrical works.

Architectural, engineering and planning services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published June 26, 2015
Winner
Sturm + Wartzeck GmbH
cpvs
71240000

- Project planning services for buildings under Part 3, Section 1; - Project planning services for outdoor areas under Part 3, Section 2; - Project planning services for traffic installations under Part 3, Section 4; - Technical design services for structures under Part 4, Section 1; - Technical design services for technical equipment under Part 4, Section 2 of the HOAI 2013 following implementation of a planning competition for RPW-2013.

Architectural, engineering and planning services

Eigenbetrieb Stadtentwässerung Pforzheim | Published February 5, 2015  -  Deadline March 5, 2015
cpvs
71240000, 71320000

To realize the fourth purification stage intends the natural Stadtentwässerung Pforzheim, tender planning services in a Europe-wide procurement procedures under the provisions of the VOF and gradually to instruct. All planning services (especially for civil engineering structures, technical equipment, structural design and other design services) to a total of - to be awarded to a general planner - subject to the discretion of the self Stadtentwässerung Pforzheim to call for a portion of the advertised power levels. The holistic integrating a master planner was chosen to avoid technical interfaces in the planning and combining their responsibilities for the feasibility of the plan in one hand. The self Stadtentwässerung Pforzheim makes the realization of the project depending on the results of the cost calculation and the granting of public funding. Therefore, a decision to build for the realization of the project is not yet available. It is insofar also still unclear whether a building permit and / or a water permit is required for the project. The subject of the advertised - and tasked with awarding a contract - Performance level 1 design services of the power phase 2 and phase 3 power for all components of the project (especially engineering structures, technical equipment, structural engineering). Subject to the performance stage 2 are any necessary planning services to the power stage 4, which would be required for approval of the project. Subject to the performance level 3 design services performance Phases 5 to 8 of the images of Structures, Technical Equipment and structural engineering. Subject of the power stage 4, the performance phase 9 of the images of Structures and technical equipment.

Furniture

Stadt Pforzheim | Published January 26, 2017
Winner
Böhm GmbH
cpvs
39100000, 79800000

The contract should cover the scope of the determined work of the museum expansion in 2016/2017.

The museum expansion takes place in the historic inventory and includes mainly carpentry, locksmith, upholstery and glazier work, supply and installation, as well as printing services. The design of the exhibition elements requires commercial spanning work and skills special solutions for showcases, among other things to work with integrated media and lighting technology and implement.

The exhibition architecture include cabinets of different sizes, design and shape incl. Lighting, seating, wall consoles and graphics boards. The display cases are made up of, among other materials such as glass, painted and treated and untreated wood materials, painted steel and mineral material.

The exhibition lighting is substantially within the display cases.

The exhibition consists of graphic screen printing and digital printing, film lamination, as well as reproductions and facsimiles of historical images and printing, graphic designs on display cases, walls and panels.

Pforzheim, establishment of a detention center for Baden-Württemberg, architectural services under Part 3 section 1 HOAI.

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Amt Pforzheim | Published March 2, 2016  -  Deadline March 29, 2016
cpvs
71221000

Pforzheim, Rohrstr. 17, set up a detention center for Ba.-Wü., architectural services under Part 3 section 1 HOAI, Phases 3 to 8 and Special Services of the power stage 9 (documentation).

Because of a court judgment of the ECJ rejected asylum seekers may not be housed in prisons. The state of Baden-Württemberg has given the current use of the building in Pforzheim, tube 17, as a prison. The building is to be transformed with the judgment accordingly. During the final stage, 80 people can be accommodated. It is aimed at the greatest possible freedom of movement, taking into account the necessary security measures. With substantial retention of the building structure of the previous cell block is to be largely divided into individual housing groups with 6-9 residents. As central institutions rooms for administration, prison service, the medical field, the utilities, the Visitor and lounges of the new use should be adjusted. Consideration must be given to complex functional requirements. The structural measures are largely limited to indoor use. Already in April 2016 about 20 people can be accommodated in provisionally converted residential groups. The construction work must therefore be in full operation in sensible portions. Since this is a very sensitive area and extensive benefits of building services are to be integrated, a high coordination effort in the construction management phase is required. Estimated total construction costs max. 6.3 million Euro.

The architects are expected to set up on the basis of the existing feasibility study, in close coordination with the HLSE-planners and compliance with the existing buildings and an upper cost limit, to calculate the cost of conversion and a design and manufacturing schedules. After LV preparation and tendering procedures consistent site management is expected.

  • 1