Call +44 800 9755 164

Public tenders for architect, architecture in Pfaffenhofen-an-der-ilm Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!
ArchitectureGermanypfaffenhofen-an-der-ilm

Architectural services for outdoor areas

Stadt Pfaffenhofen an der Ilm | Published December 3, 2015
Winner
Wankner und Fischer Landschaftsarchitekten BDLA
cpvs
71222000

With the new school is scheduled to begin in spring 2016, so that the school can be taken in September 2017 operation. 12 640 m2 to execute. Being so close to Gerolsbach the two schoolyards are located on a flood-proof level is still set by structural measures. In addition, a green classroom should be set up in the westernmost corner of the property. In addition, planned at the public plaza area still 150 bicycle parking spaces. The entire school system is to be surrounded by a fence that separates the two playgrounds of elementary and middle school apart. The contract covers design services are for free plant design of elementary and middle school in Pfaffenhofen after the performance image of § 39 HOAI 2013 for performance phases 4-9. Contract award is expected to in October 2015. 1.5 million EUR gross.

Architectural services for outdoor areas

Stadt Pfaffenhofen an der Ilm | Published June 6, 2015  -  Deadline July 7, 2015
cpvs
71222000

With the new building of the school is scheduled to begin in spring 2016, so that the school can be taken in September 2017 operation. 12 640 m2 to perform. Being so close to Gerolsbach the two schoolyards are located on a flood-proof level is still set by structural measures. In addition, a green classroom should be set up in the westernmost corner of the property. In addition, planned on the public square face still 150 bicycle parking spaces. The entire school system is to be surrounded by a fence separating the two playgrounds of elementary and middle school apart. The contract covers design services are for free investment planning of primary and secondary schools in Pfaffenhofen after the performance image of § 39 HOAI 2013 for performance phases 4-9. Contract award is expected to in October 2015. 1.5 million EUR gross.

Architectural and related services

Ilmtalklinik GmbH | Published November 13, 2015
Winner
Eichenseher Ingenieure
cpvs
71200000

14,700 patients hospitalized. The appearance of the house corresponds to continue the state's then medicine, and's then state of the art. Due to lack of inventory documents, a structural and technical survey was carried out, were determined from which other needs of the construction time of the building and incorporated into the comprehensive measures. In coordination with the fire protection concept creators, the Prüfsachverständigen fire protection as well as representatives of the district office and the fire department the necessary urgent measures were divided into 4 areas: securing escape and rescue routes, installation of a fire alarm system (coverage) 3. Change the alarm concept, restoration of fire dampers. The Alamierungskonzept is comprehensively implement in the course of implementation of Measure 2 in the house. The aim is to improve safety for patients and staff immediately to disrupt the ongoing hospital operations as little as possible and to minimize stranded costs. 300 + 400, DIN 276), 400, DIN 276). Schedule: Construction is scheduled for autumn 2015th

Architectural and related services

Stadtverwaltung Pfaffenhofen an der Ilm | Published December 12, 2015  -  Deadline January 14, 2016
cpvs
71200000, 71300000

Ausgeschriebene freelance services: Structural design in accordance with § 49-52 HOAI, Phases 1-6 gem. § 51 HOAI. Construction of the new hall pool Pfaffenhofen. The town Pfaffenhofen is planning to build a pool hall on the property Lower Scheyerer Str. 19, hall no. Angedacht 790 is currently the construction of a hall swimming pool, designed for use in schools as a double exercise facility (swimming pool size 25 x 12.5 m) and for use in public bathing with an activation / multipurpose area for children, non-swimmers with approximately 30 m2 of water and a small sauna area, in one-storey construction with a basement for Beck dealing with technology. The demolition of the existing school building on the property to be held in autumn / winter 2017th By building a new hall pool is scheduled to begin in spring 2018, so that the indoor pool can be taken in the fall of 2019 into operation. The plot is partially located on the Gerolsbach in floodplain. On the property two groundwater poles are found, the groundwater level on the first floor at a depth of about 1.9 m to 3.3 m, the second, artesian confined groundwater Stock at a depth of approximately 14 m. The building, shaped by Gerolsbach is very heterogeneous. For the indoor pool is currently currently no concrete plans, however, being considered is a self-supporting hall construction made of wood or concrete. Exterior walls should be constructed as insulated concrete walls with ventilated tiled facade, the interior walls, depending on structural requirements as reinforced concrete or masonry walls. Floor and ceiling slabs should be designed as reinforced concrete slabs with appropriate screed. Dates: start of the performance Phase 1 immediately after commissioning, expected in early March 2016th

Architectural services for buildings

Ilmtalklinik GmbH | Published August 6, 2015
Winner
Bietergemeinschaft Geisel + Götz und Kurz Architekten GmbH/köhler architekten + beratende Ingenieure GmbH
cpvs
71221000

Renovation and expansion Ilmtalklinik Pfaffenhofen - Services of the Building design and interiors in accordance with §§ 33 ff HOAI, Phases 2-9..

Architectural services for buildings

Ilmtalklinik GmbH | Published January 31, 2015  -  Deadline March 2, 2015
cpvs
71221000

Renovation and expansion Ilmtalklinik Oberpfaffenhofen - Services of the Building design and interiors in accordance with §§ 33 ff HOAI, Phases 2-9..

Architectural and related services

Ilmtalklinik GmbH | Published January 31, 2015  -  Deadline March 2, 2015
cpvs
71200000

14,700 patients hospitalized. The appearance of the house still reflects the damaligem state of medicine, as well as damaligem prior art. Due to lack of inventory data, a structural and technical survey was conducted, were found from which other defects from the time of construction of the building and incorporated into the comprehensive measures. In consultation with the fire protection concept creator, the registered inspector fire protection as well as representatives of the district office and the fire department the necessary urgent measures were divided into 4 areas: ensuring the escape and rescue routes, installing a fire alarm system (coverage) 3. Change the alarm concept, the rehabilitation of fire dampers. The Alamierungskonzept is comprehensively implemented as part of the implementation of the Action 2 in the house. The aim is to improve safety for patients and staff immediately, interrupting the clinic operation as little as possible and to minimize stranded costs. Cost: 300 + 400, DIN 276), 400, DIN 276). Dates: the construction is planned for autumn 2015.

Architectural and related services

Stadtverwaltung Pfaffenhofen an der Ilm | Published December 12, 2015  -  Deadline January 14, 2016
cpvs
71200000, 71300000

Ausgeschriebene freelance Performance Engineering services for technical equipment HLS (asset group 1, 2, 3, 7 and 8) acc. § 53-56 HOAI, performance phase 1-9 gem. § 55 HOAI. The town Pfaffenhofen is planning to build a pool hall on the property Lower Scheyerer Str. 19, hall no. Angedacht 790 is currently the construction of a hall swimming pool, designed for use in schools as a double exercise facility (swimming pool size 25 x 12.5 m) and for use in public bathing with an activation / multipurpose area for children, non-swimmers with approximately 30 m2 of water and a small sauna area, in one-storey construction with a basement for Beck dealing with technology. The demolition of the existing school building on the property to be held in autumn / winter 2017th By building a new hall pool is scheduled to begin in spring 2018, so that the indoor pool can be taken in the fall of 2019 into operation. The plot is partially located on the Gerolsbach in floodplain. On the property two groundwater poles are found, the groundwater level on the first floor at a depth of about 1.9 m to 3.3 m, the second, artesian confined groundwater Stock at a depth of approximately 14 m. The building, shaped by Gerolsbach is very heterogeneous. For the indoor pool is currently currently no concrete plans, however, being considered is a self-supporting hall construction made of wood or concrete. Exterior walls should be constructed as insulated concrete walls with ventilated tiled facade, the interior walls, depending on structural requirements as reinforced concrete or masonry walls. Floor and ceiling slabs should be designed as reinforced concrete slabs with appropriate screed. Dates: start of the performance Phase 1 immediately after commissioning, expected in early March 2016th

Architectural services for buildings

Magistrat der Universitätsstadt Marburg | Published May 19, 2017
Winner
Schmees & Wagner Parnerschaftsgesellschaft mbH
cpvs
71221000

Services category No 12: Architecture, technical consultancy and planning, integrated technical services, urban and landscape planning, related scientific and technical consultancy, technical testing and analysis

Main place of execution: Paul-Natorp-Str. 9-11, 35043 Marburg.

(§§ 33 ff. HOAI 2013 in conjunction with appendix 10), performance phases 2-9 for the canteen building

Variance consideration (feasibility study) for the structural conception of the overall realm

Variations 1 to 3.

Architectural, engineering and planning services

Magistrat der Kreisstadt Heppenheim | Published October 24, 2015  -  Deadline November 20, 2015
cpvs
71240000

Built in 1906-07 building was built according to the plans of the famous architect Heinrich Metz village and urban development is of great importance for the county town Heppenheim. Conditioning (3) includes current photos and a floor plan of the building. As part of the rehabilitation and reconstruction of the building to be in a public facility needs to used and in the process in the form of: - School of Music; - Citizen-based services; - Offices / workplaces of the administration; are supplied. The cost of rehabilitation are currently budgeted at 3,000,000 EUR gross. Because considerable gutting and complete to be constructed Haustechnik the services referred to in II.2.1) are required. The implementation period is planned for 2016-2017. The lead architect has to take over from the beginning of the measure of additional coordination services to ensure a defect-free planning of all stakeholders. Close coordination with the municipal project participants is provided. The necessary votes are to be provided as part of the overall commissioning and care taken. The applicants arc is available for download at the following Internet address www.nhps-stadtentwicklung.de/vof-heppenheim

Support performance in the areas of business and trade architecture in 2 lots

Land NRW | Published March 3, 2015  -  Deadline April 13, 2015
cpvs

Unterstützungsleistung in den Bereichen Betriebs- sowie Facharchitektur in 2 Losen

Architectural services for buildings

Schulverband Höchstädt – Grund- und Mittelschule | Published August 12, 2016
Winner
ARGE müllerschurr mit DBW
cpvs
71221000

The Schulverband Höchstädt intends the building of the middle school in Höchstädt inter alia an environmentally friendly, energy-optimized accessibility to rehabilitate and to 200 m 2 NF to expand. The building was constructed from 1973 to 1975 as a steel skeleton structure with unitized supports starboard beams and starboard fins blankets by the planning of the architect Werner Baumann from Dillingen and after renovation and expansion includes 3 800 m 2 HNF. It consists of the basement, the ground floor and two upper floors and has a flat roof.

The building structure is in good condition and worth preserving, even though the building envelope has technical flaws and energetically to rehabilitate is (possibly passive house standard). The technical building equipment (heat distribution, waste water, drinking water, ventilation and electrical systems) must be replaced. The scope of the renovation work and the extension has already been studied in alternatives and decided by the Association of Universities. (- VAT 700 DIN 276, including KGr 200th..) From currently available information, the School Association expects total cost of approximately 11,350,000 EUR.

The construction work to be performed during operation in several phases which means a lot of effort in the project supervision. With the execution of construction is scheduled to begin 2017th

Object of the contract are the benefits of the project planning building according HOAI Part 3, Section 1, service phases 2-9 for renovation and expansion. The appointment is in accordance with § 33 HOAI stages. About one each additional assignment of power levels of authority in the further process course decides. From the gradual commissioning no claims can be derived on commissioning additional power levels. A legal entitlement to the appointment of additional services does not exist.

Architectural services for buildings

Schulverband Höchstädt – Grund- und Mittelschule | Published April 2, 2016  -  Deadline May 3, 2016
cpvs
71221000

The Schulverband Höchstädt intends the building of the middle school in Höchstädt inter alia an environmentally friendly, energy-optimized accessibility to rehabilitate and to 200 m 2 NF to expand. The building was constructed from 1973 to 1975 as a reinforced concrete frame with unitised supports starboard beams and starboard fins blankets by the planning of the architect Werner Baumann from Dillingen and after renovation and expansion includes 3 800 m 2 HNF. It consists of the basement, the ground floor and 2 upper floors and has a flat roof.

The building structure is in good condition and worth preserving, even though the building envelope has technical flaws and energetically to rehabilitate is (possibly passive house standard). The technical building equipment (heat distribution, waste water, drinking water, ventilation and electrical systems) must be replaced. The scope of the renovation work and the extension has already been studied in alternatives and decided by the Association of Universities. (- VAT 700 DIN 276, including KGr 200th..) From currently available information, the School Association expects total cost of approximately 11,350,000 EUR.

The construction work to be performed during operation in several phases which means a lot of effort in the project supervision. With the execution of construction is scheduled to begin 2017th

Object of the contract are the benefits of the project planning building according HOAI Part 3, Section 1, service phases 2-9 for renovation and expansion. The appointment is in accordance with § 33 HOAI stages. About one each additional assignment of power levels of authority in the further process course decides. From the gradual commissioning no claims can be derived on commissioning additional power levels. A legal entitlement to the appointment of additional services does not exist.

Architectural and related services

Vinzentius-Krankenhaus Landau | Published November 4, 2015
Winner
Arcass Architekten
cpvs
71200000

Architectural services in accordance with § 33 HOAI for the reconstruction, expansion and modernization of OP-Abteliung and the intensive care unit of Hospital Vinzentius Landau including adjacent areas, in particular, sterile supply, recovery room and adjacent room zones. Whether the construction work is complete perform the inventory or makes an extension to the existing hospital building needed to be clarified in the course of the architect planning. The construction work must be designed and constructed that the surgical operation can be continued at each stage of the building project. Whether the building project under consideration of these requirements is to be implemented meaningful and cost-effective in one or more stages of construction, the architect has to be clarified as part of its planning task.

Architectural and related services

Eigenbetrieb Schule + Gebäudewirtschaft Kreis Bergstraße | Published March 9, 2017  -  Deadline April 6, 2017
cpvs
71200000

The Lindenhof School is an elementary school with about 100 pupils on the outskirts of Groß-Rohrheim. The school children have the opportunity in the "family friendly county" in 2 groups care to dwell to 17 o'clock after school hours at school. The school consists of 2 buildings connected by a neighboring building with a gross floor area of ​​approx 2050 m 2 , School building with playground and natural stone wall forming a listed ensemble. The schoolyard is oriented to the street with 2 rows of Linden in the form of an avenue created.

As part of the overall renovation of the current space program should be presented in the buildings. Given partly a reorganization of the premises is required. In addition, the installation of a canteen with kitchen Edition pre-equipped for the supply system "Cook and Chill" is provided. The fire protection requirements are to be considered and implemented. The buildings are modern according to current energy and room acoustic requirements.

Architectural and related services

Philipps-Universität Marburg | Published March 11, 2017  -  Deadline April 7, 2017
cpvs
71200000

OG and its related ventilation, electrical, fire protection and technical media distribution equipment.

The equipment of the lecture halls is also coordinated in terms of monument protection law concerns with the relevant authorities.

To this end, the planning services of the project planning in accordance with § 34 HOAI are to forgive, 2013.

Since this is in the building is one of the last representatives of his time in Marburg, the building was a single cultural monument conservation.

890 m 2 , Over the entire base area of ​​the core.

Here, especially the accessibility to the building and accessibility were improved.

Bauabschnitt proposed reorganization of the sanitary tract is carried out in 2018th

OG and its related ventilation, electrical, fire protection and technical media distribution equipment.

The equipment of the lecture halls is also coordinated in terms of monument protection law concerns with the relevant authorities.

In addition to the above points following further remedial measures in buildings should be carried out:

- Replacement of single-glazed windows and exterior doors in the basement;

- Installation of door mats at the entrances of the building on the ground floor;

- Working up the wooden handrails and supplement of tactile information;

- Added visually contrasting stages markings on the stairs in the building;

- Replacement of the drainage cement pipes insofar as they are uncovered during the renovation;

- Adaptation of the heat transfer station to lower system temperatures.

The operation of the building, either partially or to closure of the operation, in each case to ensure absolutely the date of commencement lecture.

Possibly. intervention required in these areas should be limited to the semester break.

The execution of the subsequent levels will be established in the context of further ordering and is intended to permit the ES building.

Architectural and related services

Stadt Lauf an der Pegnitz | Published December 15, 2016  -  Deadline January 24, 2017
cpvs
71200000, 71221000, 71240000, 71000000

The service package includes the classical education also open as bound full day and a lunch care services.

The whole school is basically divided into five buildings:

Cultivation (built in 1987),

1939),

- Gymnasium with fold Lehrschwimmbecken and 2½ Gymnasium (built in 1970),

- Covered recreation hall (built in 1970),

- Caretakers House.

In Phase I (here: Scope) are the following building renovated in several phases:

- School auditorium, 1971 ( "New"),

- Attachment 1987

- Old 1939

- Recreation hall 1971 (only parts are rebuilt in BA 1).

Project planning (Building Design) in accordance with HOAI 2013 Part 3, Section 1, § 34 Phases 1-9 (LPH 1 and 2 reduced)

The principal must therefore always have the option to terminate the project, without this there is an entitlement to the additional assignment, nor can it other obligations for the customer arise.

9).

Architectural and related services

Schule + Gebäudewirtschaft | Eigenbetrieb des Kreises Bergstraße | Published September 23, 2016
Winner
Eßmann | Gärtner | Nieper | Architekten GbR
cpvs
71200000

This tender includes planning services object planning HOAI, Part 3, Section 1, Section 34, Phases 1 - 9 and initially sees a gradual demand up to Phases. 2 ago.

Architectural and related services

Landkreis Dillingen an der Donau | Published August 12, 2016  -  Deadline September 7, 2016
cpvs

Architectural and related services

Architectural and related services

Landkreis Dillingen an der Donau | Published August 10, 2016  -  Deadline September 7, 2016
cpvs

Architectural and related services