Public tenders for architect, architecture in Offenbach Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural and related services

GBO Gemeinnützige Baugesellschaft mbH Offenbach | Published October 18, 2017
cpvs
71200000, 71220000

The subject matter of the architects' services to be awarded is the performance profile according to § 34 HOAI 2013. The competition is the subject of the Hochbau. Design for the new construction of the Fröbelschule with the main focus on intellectual development, a department for physical motor development (full-day school). The special requirements of the school must be taken into account, in particular from an economic point of view.

The new building is to be erected for 140 - 150 pupils, the movement hall with 210 m 2 usable hall play area. and a teaching swimming pool with 105 m 2 Water surface. The cost ceiling was approx. EUR 11 500 000 net for KG 300 u. 400.

The process is carried out as a single-phase, non-open, high-rise realization competition according to RPW 2013 with max. 10 participants with a previous application. and subsequent negotiating procedure. according to VgV. The competition has been registered with the Chamber of Architects of Hessen under the number 08/2017 RPW 2013 on 7.4.2017.

Architectural and related services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published October 5, 2017  -  Deadline November 2, 2017
cpvs
71200000, 71221000, 71240000

Planning services according to HOAI part 3, object planning of buildings and interior spaces, within the performance phases 1 to 9, with a preferential and 2 alternative solution variants for the structural improvement of a day care center with 5 groups.

Architectural services for buildings

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published October 5, 2017  -  Deadline November 2, 2017
cpvs
71221000, 71240000

Planning services according to HOAI part 3, object planning of buildings and interior spaces, within the performance phases 1 to 9, with a preferential and 2 alternative solution variants for the structural improvement of the Kita Rödernstraße (3) in Offenbach am Main.

The day-care center is to be adapted to current requirements and current requirements.

Kita Rödernstraße (3) Holding:

The children's day care center consists of several building parts of different construction years.

Only the north façade is designed as a plaster façade.

In order to integrate two other nursery groups, a further one-storey extension building was built in 2006, which creates a structural connection to the main building using an external canopy.

All parts of the building are not basement, only the main building has a creep path for the installation of installation lines.

At around 1,076 m 2 6 children up to 150 children aged between 3 and 6 years are cared for every day.

The main building has come into its own in terms of construction and technology, no longer meeting the required energy standards, nor does it meet the structural standards of a facility for early childhood education and care.

KlnvFG in general:

This also includes all future changes to the funding specifications as of the date of their announcement.

The provision of the service is to be started immediately after the order has been placed.

Architectural and related services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published September 30, 2017  -  Deadline November 2, 2017
cpvs
71200000, 71221000, 71240000

Planning services according to HOAI part 3, object planning of buildings and interior spaces, within the performance phases 1 to 9, with a preferential and 2 alternative solution variants for the structural improvement of a day care center with 5 groups.

The day-care center is to be adapted to current requirements and current requirements.

Location of facility:

It is bounded to the north and east by fields, south and west of multi-storey residential development.

Building structure:

577 m 2 ,

Construction:

The flat roof consists of trapezoidal sheets with thermal insulation.

promotion:

This also includes all future changes to the funding specifications as of the date of their announcement.

The provision of the service is to be started immediately after the order has been placed.

Architectural, construction, engineering and inspection services

OPG Offenbacher Projektentwicklungsgesellschaft mbH | Published May 19, 2017
Winner
Planungsbüro Röhrig GmbH
cpvs
71000000, 71240000, 71247000, 71300000, 71315300

In the course of the redevelopment of the Käthe-Kollwitz-Schule, services according to § 55 (HOAI 2013), Lph 8 and 9, the technical equipment for the groups 1, 2, 3 and 8 are necessary for the execution of the construction project.

Services from the performance picture Technical equipment Performance phase 8 Object monitoring (construction supervision) and documentation.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published February 10, 2017  -  Deadline March 14, 2017
cpvs
71000000, 71322000

Conveyors.

Components of the action are the realization of surface expansion needs, the structural and building services Full restoration and planning if necessary. Necessary interim accommodation due to a separately awarded nationwide rehabilitation of sprayed asbestos residues.

Conveyors.

The design contract refers to the rehabilitation and extension of Edith Stein School in Offenbach (comprehensive school with full-day program in the 780 pupils are taught).

12 900 m 2 BGF and consists of the three-storey main building of 1978, the 3-field sports hall and the storey caretaker house (both from 1980).

The brick caretaker house is on one floor and analogous to the ensemble also a flat roof and a brick facade.

This procurement method comprising the necessary specialist planning services building equipment for the planning areas (investment groups 1, 2, 3 + 8):

For this to be developed by the project planners, a concept which is to accompany professionally in terms of technical building equipment.

b. structural and building services Full restoration (age-related damage and energy optimization) including remediation of pollutants that can be removed without the need for a black and white separation.

Provided the Black remediation not start during the summer holidays and terminate leaves)

The client expects a close cooperation between the object planner, specialist planners of this process and the future switched Fachbüro asbestos removal because the individual measures of pollutants and inventory remediation and possibly. Also rebuilding and extension measures are likely linked.

Architectural and related services

Magistrat der Stadt Offenbach am Main | Published October 22, 2016  -  Deadline November 22, 2016
cpvs
71200000, 71221000, 71240000

Services of the HOAI Part 3 Objektplanung Section 1 building and interiors with work phases 1 to 9, here: planning services with an integrated assessment for the renovation and expansion of a comprehensive school in 63069 Offenbach.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published July 22, 2016
Winner
Schüßler-Plan Ingenieurgesellschaft mbH
cpvs

Architectural, construction, engineering and inspection services

Architectural, engineering and planning services

Verbandsgemeindeverwaltung Offenbach an der Queich | Published May 19, 2016
Winner
Kohl + Frech, Ingenieurgemeinschaft
cpvs
71240000, 71221000, 71222000, 71321200, 71321300, 71320000, 71356400

The building at Konrad-Lerch-Ring 6 in Offenbach an der Queich is currently used as a technical administrative building of the municipality Offenbach as a city hall. The condition of the building currently has a number of distinctive technical and visual defects. This lead to significant limitations of job grades and very high maintenance and operating costs. On the basis of detailed preliminary studies it was decided to abandon the current City Hall, and to build on the same plot a new building.

The site for the planned new town hall is located immediately east of the existing administration building. The building will include the seat of the municipal administration space for about 55-60 management workstations and the usual special rooms a local government (z. B. Meeting Rooms, council chamber, wedding room). It is currently owned by a an effective area of ​​approximately 1 500 m 2 went out.

Particular emphasis is placed on efficiency, maintenance costs, energy efficiency, future-oriented equipment and technology, design quality.

The following planning services should be commissioned:

Lot 01: Building Planning services in accordance with § 34 HOAI connection with Annex 10, design services for the power of image-free plant design within the meaning of § 39 HOAI i V. m.. Appendix 11;

Lot 02: Planning services for HVAC systems within the meaning of § 55 HOAI i V. m.. Annex 15, investment groups 1, 2, 3;

Lot 03: Planning services for HVAC systems within the meaning of § 55 HOAI i V. m.. Annex 15, investment groups 4, 5, 6,. 8

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published April 20, 2016  -  Deadline May 18, 2016
cpvs
71000000, 71240000, 71322000

to provide Essentially HOAI 2013 Part 4 Fachplanung, section 2 Technical equipment for the expansion and rehabilitation of a comprehensive school in 63067 Offenbach: Services of the planning of technical equipment for the phases 1-9 according to § 51 HOAI 2013 and integrated assessment; for investment groups Group 1 sewage, water and gas facilities, group 2 heat supply systems, group 3 air-conditioning systems and air-conditioning systems Group 8

The design contract refers to the rehabilitation and extension of Geschwister-Scholl-Schule in Offenbach (comprehensive school with full-day program; currently about 550 pupils / students in 22 classes). The property consists of several one- to three-story, partially basement and interconnected buildings. Part of the building has been built as a reinforced concrete frame construction with infill steel and glass panels and solid (clinker) brick masonry in 1966th There is also a Fachklassenbau of 1985 in reinforced concrete frame construction with curtain-faced concrete panels and partially inner walls of brick masonry. The cafeteria and other rooms for the full-day school operations are housed in a building in 2005. The ensemble comprises approximately 10,500 sqm GFA including Caretaker house, cafeteria and new two-field sports hall of 2012 Design.

There is a total renovation of the buildings from the 1960s and 1980s: Entire building services, building envelope, interior spaces. This is the highest possible energy standard to achieve.

Due to increased pupil numbers and to ensure the full day capacity the school to about 300 m has 2 BGF be expanded by new and / or additions and / or alterations in the portfolio. For this purpose a concept is to develop.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published April 20, 2016  -  Deadline May 19, 2016
cpvs
71000000, 71240000, 71322000

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published April 19, 2016  -  Deadline May 19, 2016
cpvs
71000000, 71240000, 71327000

to provide Essentially HOAI 2013 Part 4 Fachplanung, section 2 Technical equipment for the expansion and rehabilitation of a comprehensive school in 63067 Offenbach:

Services of the planning of technical equipment for the phases 1-9 according to § 51 HOAI 2013 and integrated assessment; for investment groups Group 4 -Starkstromanlagen, Group 5 - Telecommunications and IT systems and group 6 - Conveyors

The design contract refers to the rehabilitation and extension of Geschwister-Scholl-Schule in Offenbach (comprehensive school with full-day program; currently about 550 pupils / students in 22 classes). The property consists of several one- to three-story, partially basement and interconnected buildings.

Part of the building has been built as a reinforced concrete frame construction with infill steel and glass panels and solid (clinker) brick masonry in 1966th There is also a Fachklassenbau of 1985 in reinforced concrete frame construction with curtain-faced concrete panels and partially inner walls of brick masonry. The cafeteria and other rooms for the full-day school operations are housed in a building in 2005. The ensemble comprises approximately 10,500 sqm GFA including Caretaker house, cafeteria and new two-field sports hall of 2012 Design.

There is a total renovation of the buildings from the 1960s and 1980s: Entire building services, building envelope, interior spaces. This is the highest possible energy standard to achieve.

Due to increased pupil numbers and to ensure the full day capacity the school to about 300 m has 2 BGF be expanded by new and / or additions and / or alterations in the portfolio. For this purpose a concept is to develop.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published March 23, 2016  -  Deadline April 12, 2016
cpvs
71000000, 71222000, 71300000, 71320000, 71322000, 71322500

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published December 11, 2015  -  Deadline January 13, 2016
cpvs
71000000, 71240000, 71327000

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published December 9, 2015  -  Deadline January 13, 2016
cpvs
71000000, 71240000, 71327000

Services according to HOAI Part 4, sectoral planning, Section 1 Structural Design with power phase 1 to 6 and in addition Special services of LP. 7-9 for the expansion and rehabilitation of a comprehensive school in 63067 Offenbach. The design contract refers to the rehabilitation and extension of the Geschwister-Scholl-Schule in Offenbach (integrated comprehensive school with all-day activities; about 550 Schüle spillways / students in 22 classes). The property consists of several one- to three-story, partially basement and interconnected buildings. Part of the building has been built as a reinforced concrete frame construction with infill steel and glass panels and solid (clinker) brick masonry in 1966th To-where there is a Fachklassenbau from 1985 in reinforced concrete frame construction with curtain-faced concrete panels and partially inner walls of brick masonry. The Ca-feteria and other rooms for the full-day school operations are housed in a building in 2005. The ensemble comprises approximately 10,500 m² gross floor area including Caretaker house, cafeteria and new two-field sports hall of 2012. There is a total renovation of the buildings from the 1960s and 1980s: building services, building envelope, interiors. This is the highest possible energy standard to reach. Due to increased pupil numbers and to ensure the full-day school capacity by approximately 300 m2 of gross floor area by new and / or additions and / or alterations by the inventory needs to be expanded. For this, a concept should be developed.

Architectural and related services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published November 21, 2015  -  Deadline December 17, 2015
cpvs
71200000, 71221000, 71240000

Services of the HOAI Part 3 Objektplanung Section 1 Building and Interiors with work phases 1 to 9, here: planning services with an integrated assessment for the renovation and expansion of a comprehensive school in 63073 Offenbach. The design contract refers to the rehabilitation and extension of the Geschwister-Scholl-Schule in Offenbach (integrated comprehensive school with all-day activities; about 550 pupils / students in 22 classes). The property consists of several one- to three-story, partially basement and interconnected buildings. Part of the building has been built as a reinforced concrete frame construction with infill steel and glass panels and solid (clinker) brick masonry in 1966th There is also a Fachklassenbau from 1985 in reinforced concrete frame construction with curtain-faced concrete panels and partially inner walls of brick masonry. The cafeteria and other rooms for the full-day school operations are housed in a building in 2005. The ensemble comprises approximately 10 500 m2 gross floor area including Caretaker house, cafeteria and new two-field sports hall of 2012. There is a total renovation of the buildings from the 1960s and 1980s: building services, building envelope, interiors. This is the highest possible energy standard to reach. Due to increased pupil numbers and to ensure the full-day school capacity by approximately 300 m2 of gross floor area by new and / or additions and / or alterations by the inventory needs to be expanded. For this, a concept should be developed.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published November 20, 2015  -  Deadline December 15, 2015
cpvs
71000000, 71240000, 71327000

Dienstleistungen von Architektur-, Konstruktions- und Ingenieurbüros und Prüfstellen

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published November 19, 2015  -  Deadline December 3, 2015
cpvs
71000000, 71200000, 71221000, 71240000

Dienstleistungen von Architektur-, Konstruktions- und Ingenieurbüros und Prüfstellen

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published November 7, 2015  -  Deadline December 15, 2015
cpvs
71000000, 71240000, 71327000

Services of the HOAI Part 4, sectoral planning, Section 1 Structural Engineering with work phases 1 to 6 and in addition Special services of LP 7-9 for the expansion and renovation of primary and secondary school in 63065 Offenbach The planning contract refers to the renovation and expansion of the main building Mathilde school in Offenbach from the year 1978. It is a three-storey steel-framed basement with a gross floor area of ​​approximately 770 m2 7. The building has various setting related harm. The technical installations and the pads have to be renewed and to put the facade repaired. It should be the highest possible energy standards. The future expansion areas include class, homework and group rooms as well as a meeting and leisure area and are currently estimated to be approximately 2 000 m2 new-to-build gross floor area.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published October 30, 2015  -  Deadline December 3, 2015
cpvs
71000000, 71200000, 71221000, 71240000

Services of the HOAI Part 3 Objektplanung Section 1 Building and Interiors with work phases 1 to 9, here: planning services with an integrated assessment for the extension and renovation of primary and secondary school in Offenbach. The design contract refers to the renovation and expansion of the main building of Mathilde school in Offenbach from the year 1978. It is a three-storey steel-framed basement with a gross floor area of ​​approximately 770 m2 7. The building has various setting related harm. The technical installations and the pads have to be renewed and to put the facade repaired. It should be the highest possible energy standards. The future expansion areas include class, homework and seminar rooms as well as a meeting and leisure area and are currently estimated to be approximately 2 000 m2 new-to-build gross floor area.