Public tenders for architect, architecture in Offenbach Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published December 9, 2015  -  Deadline January 13, 2016
cpvs
71000000, 71240000, 71327000

Services according to HOAI Part 4, sectoral planning, Section 1 Structural Design with power phase 1 to 6 and in addition Special services of LP. 7-9 for the expansion and rehabilitation of a comprehensive school in 63067 Offenbach. The design contract refers to the rehabilitation and extension of the Geschwister-Scholl-Schule in Offenbach (integrated comprehensive school with all-day activities; about 550 Schüle spillways / students in 22 classes). The property consists of several one- to three-story, partially basement and interconnected buildings. Part of the building has been built as a reinforced concrete frame construction with infill steel and glass panels and solid (clinker) brick masonry in 1966th To-where there is a Fachklassenbau from 1985 in reinforced concrete frame construction with curtain-faced concrete panels and partially inner walls of brick masonry. The Ca-feteria and other rooms for the full-day school operations are housed in a building in 2005. The ensemble comprises approximately 10,500 m² gross floor area including Caretaker house, cafeteria and new two-field sports hall of 2012. There is a total renovation of the buildings from the 1960s and 1980s: building services, building envelope, interiors. This is the highest possible energy standard to reach. Due to increased pupil numbers and to ensure the full-day school capacity by approximately 300 m2 of gross floor area by new and / or additions and / or alterations by the inventory needs to be expanded. For this, a concept should be developed.

Architectural and related services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published November 21, 2015  -  Deadline December 17, 2015
cpvs
71200000, 71221000, 71240000

Services of the HOAI Part 3 Objektplanung Section 1 Building and Interiors with work phases 1 to 9, here: planning services with an integrated assessment for the renovation and expansion of a comprehensive school in 63073 Offenbach. The design contract refers to the rehabilitation and extension of the Geschwister-Scholl-Schule in Offenbach (integrated comprehensive school with all-day activities; about 550 pupils / students in 22 classes). The property consists of several one- to three-story, partially basement and interconnected buildings. Part of the building has been built as a reinforced concrete frame construction with infill steel and glass panels and solid (clinker) brick masonry in 1966th There is also a Fachklassenbau from 1985 in reinforced concrete frame construction with curtain-faced concrete panels and partially inner walls of brick masonry. The cafeteria and other rooms for the full-day school operations are housed in a building in 2005. The ensemble comprises approximately 10 500 m2 gross floor area including Caretaker house, cafeteria and new two-field sports hall of 2012. There is a total renovation of the buildings from the 1960s and 1980s: building services, building envelope, interiors. This is the highest possible energy standard to reach. Due to increased pupil numbers and to ensure the full-day school capacity by approximately 300 m2 of gross floor area by new and / or additions and / or alterations by the inventory needs to be expanded. For this, a concept should be developed.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published November 7, 2015  -  Deadline December 15, 2015
cpvs
71000000, 71240000, 71327000

Services of the HOAI Part 4, sectoral planning, Section 1 Structural Engineering with work phases 1 to 6 and in addition Special services of LP 7-9 for the expansion and renovation of primary and secondary school in 63065 Offenbach The planning contract refers to the renovation and expansion of the main building Mathilde school in Offenbach from the year 1978. It is a three-storey steel-framed basement with a gross floor area of ​​approximately 770 m2 7. The building has various setting related harm. The technical installations and the pads have to be renewed and to put the facade repaired. It should be the highest possible energy standards. The future expansion areas include class, homework and group rooms as well as a meeting and leisure area and are currently estimated to be approximately 2 000 m2 new-to-build gross floor area.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published April 19, 2016  -  Deadline May 19, 2016
cpvs
71000000, 71240000, 71327000

to provide Essentially HOAI 2013 Part 4 Fachplanung, section 2 Technical equipment for the expansion and rehabilitation of a comprehensive school in 63067 Offenbach:

Services of the planning of technical equipment for the phases 1-9 according to § 51 HOAI 2013 and integrated assessment; for investment groups Group 4 -Starkstromanlagen, Group 5 - Telecommunications and IT systems and group 6 - Conveyors

The design contract refers to the rehabilitation and extension of Geschwister-Scholl-Schule in Offenbach (comprehensive school with full-day program; currently about 550 pupils / students in 22 classes). The property consists of several one- to three-story, partially basement and interconnected buildings.

Part of the building has been built as a reinforced concrete frame construction with infill steel and glass panels and solid (clinker) brick masonry in 1966th There is also a Fachklassenbau of 1985 in reinforced concrete frame construction with curtain-faced concrete panels and partially inner walls of brick masonry. The cafeteria and other rooms for the full-day school operations are housed in a building in 2005. The ensemble comprises approximately 10,500 sqm GFA including Caretaker house, cafeteria and new two-field sports hall of 2012 Design.

There is a total renovation of the buildings from the 1960s and 1980s: Entire building services, building envelope, interior spaces. This is the highest possible energy standard to achieve.

Due to increased pupil numbers and to ensure the full day capacity the school to about 300 m has 2 BGF be expanded by new and / or additions and / or alterations in the portfolio. For this purpose a concept is to develop.

Architectural, engineering and planning services

Sana Klinikum Offenbach GmbH | Published August 20, 2015
Winner
HDR TMK Planungsgesellschaft mbH
cpvs
71240000, 71320000, 71300000, 71321000, 71322000

The Contracting Authority intends a 2-storey building with a total of 90 beds for the psychiatric clinic of the Sana Klinikum Offenbach.

Architectural, construction, engineering and inspection services

Magistrat der Stadt Offenbach am Main, Stadtplanung, Verkehrs- und Baumanagement | Published April 20, 2016  -  Deadline May 18, 2016
cpvs
71000000, 71240000, 71322000

to provide Essentially HOAI 2013 Part 4 Fachplanung, section 2 Technical equipment for the expansion and rehabilitation of a comprehensive school in 63067 Offenbach: Services of the planning of technical equipment for the phases 1-9 according to § 51 HOAI 2013 and integrated assessment; for investment groups Group 1 sewage, water and gas facilities, group 2 heat supply systems, group 3 air-conditioning systems and air-conditioning systems Group 8

The design contract refers to the rehabilitation and extension of Geschwister-Scholl-Schule in Offenbach (comprehensive school with full-day program; currently about 550 pupils / students in 22 classes). The property consists of several one- to three-story, partially basement and interconnected buildings. Part of the building has been built as a reinforced concrete frame construction with infill steel and glass panels and solid (clinker) brick masonry in 1966th There is also a Fachklassenbau of 1985 in reinforced concrete frame construction with curtain-faced concrete panels and partially inner walls of brick masonry. The cafeteria and other rooms for the full-day school operations are housed in a building in 2005. The ensemble comprises approximately 10,500 sqm GFA including Caretaker house, cafeteria and new two-field sports hall of 2012 Design.

There is a total renovation of the buildings from the 1960s and 1980s: Entire building services, building envelope, interior spaces. This is the highest possible energy standard to achieve.

Due to increased pupil numbers and to ensure the full day capacity the school to about 300 m has 2 BGF be expanded by new and / or additions and / or alterations in the portfolio. For this purpose a concept is to develop.

Architectural, engineering and planning services

Sana Klinikum Offenbach GmbH | Published March 11, 2015  -  Deadline April 7, 2015
cpvs
71240000, 71320000, 71300000, 71321000, 71322000

The Contracting Authority intends to build a two-storey building with a total of 90 beds for the psychiatric hospital in the South West area of ​​the hospital site of Sana Klinikum Offenbach. The following breakdown is planned: 2 wards with a total of 45 beds on the 1st floor, 2 bed wards with 45 beds, a day hospital with 20 seats and an outpatient department on the ground floor, partly a cellar basement with a technical area. Currently, the Department of Psychiatry and Psychotherapy is located in older buildings on the same property, but they are insufficient. It is an investment budget of max. EUR 16.6 million gross available. In this budget planning must be aligned obligatory (cost control). Be awarded in a contract awarded to a tenderer (sole tenderer or consortium) architectural services in accordance with § 34 HOAI as well as the technical equipment in accordance with § 55 HOAI, each power phase 1-9 (in stages). It is an integral 3D design expected. In the planning process and the highest energy efficiency is taken into account. It must be ensured (even if a single tenderer intends to provide all required services) that the project planning (predominantly DIN 276: KGR 300) and the TGA building equipment and TGA Electrical Engineering (total of predominantly DIN 276: KGR 400) one Project Manager (for a total of three project managers) and a general project manager are available. The relevant DIN 276: KGR be defined in the invitation to tender. The contract is subject to a positive funding decision.