Public tenders for architect, architecture in Marktheidenfeld Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!
ArchitectureGermanymarktheidenfeld

Architectural and related services

Stadt Marktheidenfeld, vertreten durch die Erste Bürgermeisterin Helga Schmidt-Neder | Published December 27, 2014
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>1. Ritter Bauer Architekten GmbH</OFFICIALNAME></ORGANISATION><ADDRESS>Herstallstr. 35</ADDRESS><TOWN>Aschaffenburg</TOWN><POSTAL_CODE>63739</POSTAL_CODE><COUNTRY VALUE="DE"/><E_MAILS><E_MAIL>rb@ritter-bauer.de</E_MAIL></E_MAILS><PHONE>+49 602133960</PHONE><URL>www.ritter-bauer.de</URL><FAX>+49 602129722</FAX></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
71200000

The city Marktheidenfeld planning to build a library. As a basis, a site analysis with preliminary feasibility study in quality has already been created by two architectural firms. As a result, it was decided for the location "smith corner" in urban monument Ensamble. The new library will contain approximately 24,000 media at about 750 m² public space. Total gross floor area and building a volume of approximately 5 000 m³ is assumed about 1 500 m². The total cost frame building is currently with about 2.5 to 3 million EUR gross - accepted (KGR 200 700 DIN 276, without land costs). Particular emphasis is placed on: - Integration in an inner city Denkmalensamble - functionality / efficiency / low maintenance costs - optimum energy and energy-efficient design, - Accessibility - Bright and friendly design. Date foresight: - start planning immediately after VOF - Planning 2014-2015, - construction phase in 2015, - construction time about 1.5 years.

Architectural and related services

Stadt Marktheidenfeld, vertreten durch die Erste Bürgermeisterin Helga Schmidt-Neder | Published November 11, 2015
Winner
Bietergemeinschaft Kplan Ag + Georg Redelbach Architekten
cpvs
71200000

The town of Marktheidenfeld, is planning to build a fire station with 14 parking spaces in Marktheidenfeld. As a basis for decisions already there is a pre-planning. It is intended that construction work at the old and new location Karbacher road sections perform (construction / demolition) in order to obtain the operational readiness across the entire construction period upright with only a few interim measures. The planning provides for a total of about 3 125 m² with a building volume of about 16,415 cubic meters for the new building. The areas are divided into: - technical rooms 500 m² UG; - Storerooms UG 880 m²; - Social rooms EC 385 m²; - Fahrzeughalle EC 880 m²; - Social spaces OG 480 m². The overall budget is currently estimated at approximately 7,181,792 EUR gross (KGR 200-700 DIN 276, without land costs): The following criteria are particularly relevant for the new building: - functionality; - Profitability; - Low maintenance costs; - Energy-optimized, energy-efficient construction; - Modern, attractive architectural design. Futures Foresight: - Project start immediately after completion VOF / Preliminary design for 3rd quarter 2015; - Planning 2015-2016; - Construction from 2016; - Construction period about 2.0 years.

Architectural and related services

Stadt Marktheidenfeld, vertreten durch die Erste Bürgermeisterin Helga Schmidt-Neder | Published November 11, 2015
Winner
Georg Redelbach Architekten
cpvs
71200000

The town of Marktheidenfeld, is planning to build a 6 group nursery garden. It is a pre-planning with store comparison has already been created. As a result, a new building at the site Baumhofstraße in Marktheidenfeld with 3 groups KiGa and crib as a 2-storey should. New are created. The planning assumes that the existing building will continue to be used during construction and therefore no interim measures are necessary. The planning provides for an area of ​​approximately 1 330 m² gross floor area and a building volume of about 850 cubic meters for the construction 5. The preliminary planning has currently established the following space program: - Kindergarten 3 groups of 25 children; - Nursery 3 groups of 12 children; - Shared Facilities, other equipment and surfaces. The overall budget is currently estimated at approximately gross 4.1 million EUR (KGR 200-700 DIN 276, without land costs). Subsequent criteria are particularly relevant for the new building: - bright, friendly, child-friendly design with light and color; - Use of pollution-free, natural materials; - Accessibility; - Functionality; - Profitability; - Energy-optimized, energy-efficient construction; - Low maintenance costs; - Modern, attractive architectural design. Futures Foresight: - Project start immediately after completion VOF / Preliminary design for 3rd quarter 2015; - Planning 2015-2016; - Construction from 2016; - Construction period 1.5 years.

Architectural and related services

Stadt Marktheidenfeld, vertreten durch die Erste Bürgermeisterin Helga Schmidt-Neder | Published June 17, 2015  -  Deadline July 14, 2015
cpvs
71200000

The town of Marktheidenfeld, is planning to build a fire station with 14 parking spaces in Marktheidenfeld. As a basis for decisions already there is a pre-planning. It is intended that construction work at the old and new location Karbacher road sections perform (construction / demolition) in order to obtain the operational readiness across the entire construction period upright with only a few interim measures. The planning provides for a total of about 3 125 m² with a building volume of about 16,415 cubic meters for the new building. The areas are divided into: - technical rooms 500 m² UG; - Storerooms UG 880 m²; - Social rooms EC 385 m²; - Fahrzeughalle EC 880 m²; - Social spaces OG 480 m². The overall budget is currently estimated at approximately 7,181,792 EUR gross (KGR 200-700 DIN 276, without land costs): The following criteria are particularly relevant for the new building: - functionality; - Economy; - Low maintenance costs; - Energy-optimized, energy-efficient construction; - Modern, attractive architectural design. Appointment Foresight: - Project start immediately after completion VOF / Preliminary design for 3rd quarter 2015; - Planning 2015-2016; - Construction from 2016; - Construction time for about 2 years.

Architectural and related services

Stadt Marktheidenfeld, vertreten durch die Erste Bürgermeisterin Helga Schmidt-Neder | Published June 17, 2015  -  Deadline July 14, 2015
cpvs
71200000

The town of Marktheidenfeld, is planning to build a 6 group nursery garden. There is a preliminary design with comparison site has already been created. As a result, a new building at Baumhofstraße in Marktheidenfeld with 3 groups KiGa and crib as a 2-storey should. New are created. The planning assumes that the existing building will continue to be used during construction and therefore no interim measures are necessary. The planning provides for an area of ​​approximately 1 330 m² gross floor area and a building volume of about 5850 m³ for the new building. The preliminary planning has currently established the following space program: - Kindergarten 3 groups of 25 children - Nursery 3 groups of 12 children - Shared Facilities, other equipment and surfaces. The overall budget is currently estimated at approximately gross 4.1 million EUR (KGR 200-700 DIN 276, without land costs). Subsequent criteria are particularly relevant for the new building: - bright, friendly, child-friendly design with light and color - use of pollution-free, natural materials, - accessibility, - functionality, - profitability, - Energy-optimized, energy-efficient construction - Low maintenance costs - contemporary , attractive architectural design. Appointment Foresight: - Project start immediately after completion VOF / Preliminary design for 3rd quarter 2015 - Planning 2015-2016, - construction from 2016, - construction period 1.5 years.
  • 1