Architectural, engineering and planning services

LB Bau-und Liegenschaftsmanagement Sachsen-Anhalt | Published October 6, 2016
Winner
Pbr Planungsbüro Rohling AG Architekten und Ingenieure
cpvs
71240000

If necessary, is to ensure the deadlines for an increase in the Team strength back up to / allow.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published September 13, 2016
Winner
iwb Ingenieurgesellschaft mbH
cpvs
71240000

It is intended to refurbish the listed town hall in Rotehornpark fundamentally. The town hall was built in 1927 and is one of the most important buildings in the city of Magdeburg, both as an outstanding monument (Bauhaus architecture) as well as in functional terms for the implementation of numerous events. The building is about 100 meters long, 50 meters wide and up to 22 meters high. The supporting steel structure is walled with a brick facade. The town hall was built after partial destruction during the war in the fifties and sixties again. There are also div. Attachments which were added with or after the reconstruction. Intended are the authentic restoration including the facade, the renovation of the hall area to a modern multi-purpose hall with a corresponding stage technology, the creation or modernization of operation -, Artist -, and administrative offices and the reorganization of structures of the functional areas. The building equipment and industrial installations have to be replaced completely. The grounds are remodel. For the construction project an application for funding is provided. The total investment of the construction work is gross about 33 000 000 EUR.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published September 14, 2016
Winner
IPK Ingenieurplanungs- und Komplexbaugesellschaft mbH
cpvs
71240000

It is intended to refurbish the listed town hall in Rotehornpark fundamentally. The town hall was built in 1927 and is one of the most important buildings in the city of Magdeburg, both as an outstanding monument (Bauhaus architecture) as well as in functional terms for the implementation of numerous events. The building is about 100 meters long, 50 meters wide and up to 22 meters high. The supporting steel structure is walled with a brick facade. The town hall was built after partial destruction during the war in the fifties and sixties again. There are also div. Attachments which were added with or after the reconstruction. Intended are the authentic restoration including the facade, the renovation of the hall area to a modern multi-purpose hall with a corresponding stage technology, the creation or modernization of operation -, Artist -, and administrative offices and the reorganization of structures of the functional areas. The building equipment and industrial installations have to be replaced completely. The grounds are remodel. For the construction project an application for funding is provided. The total investment of the construction work is gross about 33 000 000 EUR.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Der Oberbürgermeister, Eigenbetrieb Kommunales Gebäudemanagement | Published September 14, 2016
Winner
ATI Arbeitsgemeinschaft Theater-Ingenieure c/o Theater Engineering Ingenieurgesellschaft mbH
cpvs
71240000

It is intended to refurbish the listed town hall in Rotehornpark fundamentally. The town hall was built in 1927 and is one of the most important buildings in the city of Magdeburg, both as an outstanding monument (Bauhaus architecture) as well as in functional terms for the implementation of numerous events. The building is about 100 meters long, 50 meters wide and up to 22 meters high. The supporting steel structure is walled with a brick facade. The town hall was built after partial destruction during the war in the fifties and sixties again. There are also div. Attachments which were added with or after the reconstruction. Intended are the authentic restoration including the facade, the renovation of the hall area to a modern multi-purpose hall with a corresponding, television and transmission-compatible stage and media technology, the creation or modernization of operation -, Artist -, and administrative offices and the reorganization of structures of the functional areas. The building equipment and industrial installations have to be replaced completely. The grounds are remodel. For the construction project an application for funding is provided. The total investment of the construction work is gross about 33 000 000 EUR.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Der Oberbürgermeister, Eigenbetrieb Kommunales Gebäudemanagement | Published July 9, 2016
Winner
A.BB Architekten GbR
cpvs
71240000

It is intended to build on the currently existing special school (focus on disability) a disabled Ersatzneubau including therapy pool and outdoor facilities. The exact location is still open until now. In the two spacious special school should in future 150 pupils in 20 classes / study groups to an average of 8 per students in grades 1 - be informed - 10 of about 40 teachers - with all-day. Approximately 50% of students sitting in a wheelchair, and about 50 students come from neighboring counties. The space program must be accessible from anywhere the peculiarities of this special school (classrooms and therapy rooms). In addition to general and specialist classrooms accessible spaces for special education and small group work and appropriate sanitation and care facilities are also provided. When designing the rooms the special needs of severely disabled students are taken into account. The design of the outdoor facilities must school proper form and take place (access area for driving services and parents) considering the daily student transportation situation. The construction project is funded with state funds. The total investment of the construction project is approximately 7.5 million EUR (gross).

Architectural, construction, engineering and inspection services

SALEG Sachsen-Anhaltinische Landesentwicklungsgesellschaft mbH – als Treuhänder des Landkreises Börde | Published January 15, 2016
Winner
Ingenieurbüro Hanusch
cpvs
71000000, 71322000, 71300000, 71320000

Services of project planning for the project New administration building in Haldensleben: The SALEG intends in the grounds of the Born street in Haldensleben to build a new administration building as the headquarters of the district Börde. The results of the work phases 2 to 4 are available and are the basis for further achievements. The building permit is expected soon. The advertised here benefits include the performance phases 5 to 9 for the planning of the technical equipment. The interior of the building is to be implemented in two phases. The construction phases relate only to the measures of interior finishes. From the present draft plan, the following project characteristics arise: - approximately 12 200 m2 gross floor area; - 3 storeys without basement; - 2 patios; - About 380 office workplaces; - Boardroom; - Canteen. Dates: - weatherproof building shell built up in October 2016; - Completion ready for operation 1st phase of construction of at least 200 employees: 01/06/2017; - Completion working order total building (a total of approximately 380 employees): 7.9.2017. As part of further planning, the preliminary design is created to implement, taking into account the pending building permit.

Architectural, construction, engineering and inspection services

SALEG Sachsen-Anhaltinische Landesentwicklungsgesellschaft mbH, -als Treuhänder des Landkreises Börde- | Published January 15, 2016
Winner
Kichner + Przyborowski
cpvs
71000000, 71200000

Services of project planning for the project New administration building in Haldensleben: The SALEG intends in the grounds of the Born street in Haldensleben to build a new administration building as the headquarters of the district Börde. The results of the work phases 2 to 4 are available and are the basis for further achievements. The building permit is expected soon. The advertised here benefits include the performance phases 5 to 9 for the building design. The interior of the building is to be implemented in two phases. The construction phases relate only to the measures of interior finishes. From the present draft plan, the following project characteristics arise: - approximately 12 200 m2 gross floor area; - 3 storeys without basement; - 2 patios; - About 380 office workplaces; - Boardroom; - Canteen; Dates: - weatherproof building shell built up in October 2016; - Completion ready for operation 1st phase of construction of at least 200 employees: 06.01.2017 - Completion working order total building (a total of approximately 380 employees): 7.9.2017. As part of further planning, the preliminary design is created to implement, taking into account the pending building permit.

Architectural, construction, engineering and inspection services

SALEG Sachsen-Anhaltinische Landesentwicklungsgesellschaft mbH – als Treuhänder des Landkreises Börde | Published January 15, 2016
Winner
A.R.T. GmbH
cpvs
71000000, 71327000, 71300000, 71320000

Services of project planning for the project New administration building in Haldensleben: The SALEG intends in the grounds of the Born street in Haldensleben to build a new administration building as the headquarters of the district Börde. The results of the work phases 2 to 4 are available and are the basis for further achievements. The building permit is expected soon. The advertised here services include Phases 5 to 6 for the structural design. The interior of the building is to be implemented in two phases. The construction phases relate only to the measures of interior finishes. From the present draft plan, the following project characteristics arise: - approximately 12 200 m2 gross floor area; - 3 storeys without basement; - 2 patios; - About 380 office workplaces; - Boardroom; - Canteen. Dates: - weatherproof building shell built up in October 2016; - Completion ready for operation 1st phase of construction of at least 200 employees: 01/06/2017; - Completion working order total building (a total of approximately 380 employees): 7.9.2017. As part of further planning, the preliminary design is created to implement, taking into account the pending building permit.

Architectural, engineering and planning services

Evangelische Johannes-Schulstiftung | Published October 27, 2015
Winner
Deltaplan GmbH, Architektur- und Ingenieurbüro Prof. Kühn, Büro Plauen
cpvs
71240000, 71000000

Planning services for architects and engineers according to § 33.2-9 for Renovation, rehabilitation and possibly small-scale expansion of an historic school building in Burg (near Magdeburg) - Fitting for a basic private school The building Jacobistraße 9 to be included in the planning. 1887 constructed building has been used in the past as a school building, but vacant since of 2002. The plot is located in downtown Castle. 20 students) to use. Stock situation: 283 m²; 164 m²; 1 646 m² 416 m². 2200 m2 GFA required. The usages residence, school gardens and play areas are coordinated. We therefore attach great importance to the preservation of the listed structure. The planning task includes the funding-applying. The construction costs (KGR 200 to 700) according to the first estimate amounted to 4 000 000 EUR. Estimated time for processing the planning task: 30 months Project start: immediately - after commissioning. The planning services are gradually, initially awarded for services in accordance with HOAI § 33.2 and 3. FIG.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published December 3, 2015
Winner
Steinblock Architekten GmbH
cpvs
71240000

It is intended that the school complex in the Bodestr. 1 and 9 to renovate to accommodate a vocational school. For this, the existing, built in 1983 school building is to be renovated of type SBR 80 and a two-field sports hall and demand rebuilt. There are a total of approximately 4930 m2 GFA at school and 2068 m2 GFA in the gymnasium available. The future will be taught by about 36 teachers 500 pupils at the site. The vocational school is to be barrier-free and accessible for disabled people. The space program also takes into account the "inclusion". In addition to the specialized classrooms and an assembly hall can be accommodated with potential multi-purpose use z. B. as a dining room in the building. The building envelope is energetically to renovate that building systems are replaced. Which belongs to the school sports hall to be renovated at the same time. The outer parts of the EnEV are also to revise accordingly and to renew the building services plant. The grounds of approximately 7 340 m2 large school land are already renewed and must be protected during the construction phase and to restore and make school due form. For the construction project an application for funding from the STARK III program is provided. The construction project has a total value amounting to 5.7 million EUR. The sum represents a dogmatic cost ceiling.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published December 3, 2015
Winner
Planungsring Architekten Ingenieure GmbH
cpvs
71240000

It is intended to renovate the school building of the 3-speedy Community School / Middle School E. Wille in Magdeburg Ottersleben. Built in 1978 school building type Erfurt I (in literature sometimes also referred to as Type Magdeburg) should be energetically upgraded to needs rebuilt. At the site are max. 420 students of grade 5-10 of about 25 teachers taught. The school building will be barrier-free and accessible for disabled guests, the spatial program also takes into account the "inclusion". In addition to the specialized classrooms, a multipurpose room is included in the task. The building envelope is energetically to rehabilitate that hautechnischen facilities including toilets are replaced. Which belongs to the school gymnasium type KT 60L / 72 with a sports area of ​​approximately 495 m2 to be renovated at the same time. The outer parts of the EnEV are also to revise accordingly and to renew the building services plant. The grounds of the school land are of school justice to reshape, while the drainage pipes are to be revised. For the construction project an application for funding from the STARK III program is provided. The total investment of the construction project is approximately 4 000 000 EUR.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published December 3, 2015
Winner
Bietergemeinschaft ipk-iwb c/o IPK Ingenieurplanungs- und Komplexbauges. mbH
cpvs
71240000

It is intended to expand the school location Lorenzweg 81 to a 4-sized gymnasium. For this, the existing 1978 erected school buildings should be rehabilitated type Erfurt II and rebuilt as required. There are a total of three buildings available, each with approximately 5,000 m2 gross floor area. Future to be taught in 24 classes of grade 5 to 10 and eight classes of grade 11 to 12 of about 75 teachers 896 students at the site. The gymnasium is to be barrier-free and accessible for disabled guests, the spatial program also takes into account the "inclusion". In addition to the specialized classrooms and an assembly hall with potential multi-purpose use is to accommodate (eg as a dining room) in the building. The building envelope is energetically to rehabilitate. Which belongs to the school sports hall with an area of ​​approximately 970 m2 sport is to be renovated at the same time. The outer parts of the EnEV are also to revise accordingly. The grounds of approximately 47 600 m2 of land are big school to make school due form, thereby also outdoor sports facilities will be cleaned up. For the construction project an application for funding from the STARK III program is provided. The total investment of the construction project is approximately 15 000 000 EUR. The technical installations in the inventory are completely dismantled and rebuilt. Likewise, the supply / disposal lines on the plot (electricity, telecommunications) are newly introduce them to the building.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published December 1, 2015
Winner
Günther Ingenieure Gesellschaft Beratender Ingenieure mbH – Büro Dresden
cpvs
71240000

It is intended to expand the school location Lorenzweg 81 to a 4-sized gymnasium. For this, the existing 1978 erected school buildings should be rehabilitated type Erfurt II and rebuilt as required. There are a total of three buildings available, each with about 5 000 m2 GFA. Future to be taught in 24 classes of grade 5 to 10 and eight classes of grade 11 to 12 of about 75 teachers 896 students at the site. The gymnasium is to be barrier-free and accessible for disabled guests, the spatial program also takes into account the "inclusion". In addition to the specialized classrooms and an assembly hall with potential multi-purpose use is to accommodate (z. B. as a dining room) in the building. The building envelope is energetically to rehabilitate. Which belongs to the school sports hall with an area of ​​approximately 970 m² Sport is to be renovated at the same time. The outer parts of the EnEV are also to revise accordingly. The grounds of approximately 47 600 m2 of land are big school to make school due form, thereby also outdoor sports facilities will be cleaned up. For the construction project an application for funding from the STARK III program is provided. The total investment of the construction project is approximately 15 000 000 EUR. The technical installations in the inventory are completely dismantled and rebuilt. Likewise, the supply / disposal lines on the plot (water, wastewater / stormwater and heat) are newly introduce them to the building. The heat generator is carried out by a third operator and is not part of the planning services.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published December 1, 2015
Winner
Assmann Beraten + Planen GmbH
cpvs
71240000

It is intended to expand the school location Lorenzweg 81 to a 4-sized gymnasium. For this, the existing 1978 erected school buildings should be rehabilitated type Erfurt II and rebuilt as required. There are a total of 3 buildings available, each with about 5 000 m2 GFA. Future to be taught in 24 classes of grade 5-10 and 8 classes of grade 11-12 of about 75 teachers 896 students at the site. The gymnasium is to be barrier-free and accessible for disabled guests, the spatial program also takes into account the "inclusion". In addition to the specialized classrooms and an assembly hall can be accommodated with potential multi-purpose use z. B. as a dining room in the building. The building envelope is energetically to rehabilitate that hautechnischen facilities including toilets are replaced. Which belongs to the school sports hall with an area of ​​approximately 970 m2 sport is to be renovated at the same time. The outer parts of the EnEV are also to revise accordingly and to renew the building services plant. The heat supply of the buildings on the property with connection to the district heating distribution station is new produce. The grounds of approximately 47 600 m2 of land are large school of school justice to reshape, while also outdoor sports facilities will be cleaned up. For the construction project an application for funding from the STARK III program is provided. The total investment of the construction project is approximately 15 000 000 EUR.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published December 1, 2015
Winner
RKW Rohde Kellermann Wawrowski GmbH + Co. KG
cpvs
71240000

It is intended to expand the school location Lorenzweg 81 to a 4-sized gymnasium. For this, the existing 1978 erected school buildings should be rehabilitated type Erfurt II and rebuilt as required. There are a total of 3 buildings available, each with about 5 000 m2 GFA. Future to be taught in 24 classes of grade 5-10 and 8 classes of grade 11-12 of about 75 teachers 896 students at the site. The gymnasium is to be barrier-free and accessible for disabled guests, the spatial program also takes into account the "inclusion". In addition to the specialized classrooms and an assembly hall can be accommodated with potential multi-purpose use z. B. as a dining room in the building. The building envelope is energetically to rehabilitate that hautechnischen facilities including toilets are replaced. Which belongs to the school sports hall with an area of ​​approximately 970 m2 sport is to be renovated at the same time. The outer parts of the EnEV are also to revise accordingly and to renew the building services plant. The heat supply of the buildings on the property with connection to the district heating distribution station is new produce. The grounds of approximately 47 600 m2 of land are large school of school justice to reshape, while also outdoor sports facilities will be cleaned up. For the construction project an application for funding from the STARK III program is provided. The total investment of the construction project is approximately 15 000 000 EUR.

Architectural, engineering and planning services

Landeshauptstadt Magdeburg, Eigenbetrieb Kommunales Gebäudemanagement | Published December 1, 2015
Winner
Kirchner + Przyborowski Architekten BDA
cpvs
71240000

It is intended to develop at the site of the GS Diesdorf a 4-sized primary school with nursery. Built in 1978 the school building is a half type Erfurt I (in literature sometimes also referred to as Type Magdeburg) and should be upgraded and energetically demand rebuilt. For the fulfillment of the space program an extension is required. At the site about 400 students of grade 1-4 are taught by 20 teachers. The school building will be barrier-free and accessible for disabled guests, the spatial program also takes into account the "inclusion" and the extra rooms for the nursery to take care of 75% of primary pupils. The school building is energetically to rehabilitate the building services including sanitation and the district heating line from the boiler house to the dining building must be replaced. The belonging to the school, separate building with the dining room should Vedas rehabilitated at the same time. The outer parts of the EnEV are also to revise accordingly to renew the building services and establish accessibility. The grounds of the school are the property of school justice to remodel to revise or renew the drainage lines. For the construction project an application for funding from the STARK III program is provided. The total investment of the construction project is approximately 7.5 million EUR.

Architectural and related services

Land Sachsen-Anhalt, vertreten durch das Ministerium der Finanzen, vertreten durch das Bau-und Liegenschaftsmanagement Sachsen-Anhalt, NL Nord-West | Published August 13, 2015
cpvs
71200000, 71300000

Dienstleistungen von Architekturbüros

Architectural and related services

Land Sachsen-Anhalt, vertreten durch das Ministerium der Finanzen vertreten durch das Bau- und Liegenschaftsmanagement Sachsen-Anhalt, NL Nord-West | Published August 29, 2015
Winner
ARGE Kirchner+Przyborowski Diplomingenieure Architekten BDA und planungs-ring.de GmbH vertreten durch Kirchner+Przyborowski
cpvs
71200000

It is intended in future to focus on location Olvenstedter street / Editha ring in Magdeburg the administration of the Ministry of Finance of Saxony-Anhalt as well as other service areas of financial and construction administration of Saxony-Anhalt and accommodate together. To this end, the expansion of the property is provided. The property covers a total area of ​​approximately 28 000 m2. Of these, currently about 10 000 m2 built. The existing buildings have a total of an area of ​​48 000 m2 GFA. According room MRP approximately 21 000 m2 of usable space must accommodate. Realizing are jeopardizing the recovery, inter alia, landmarked, ca. 1894-1914 erbauter existing building and constructed facilities with approximately 24 000 m2 gross floor area and the creation of new space to house office, administration and consulting areas, land for food supply as well as car parking areas / Park building. Object of the contract, the planning services of the power phase 2 according to §34 HOAI for the entire project and the planning services of service phases 3-8 for the realization of the 1st phase of construction of the remediation of existing listed building and other existing buildings with a total volume of 20.5 million EUR. It is envisaged that in the first stage for the time being the pre-planning (LPH. 2) the entire project as well as the design and approval planning (LPH. 3-4) to instruct to create the budgetary backing construction of the 1st phase of construction. Here, in addition to compliance with public service regulations and valid technical standards, in particular urban planning aspects, aspects of efficiency and sustainability, accessibility and heritage legal concerns must be observed. The completion of the preliminary design of the entire project is to the end of September 2015 to ensure the completion of the Financial Pad construction until mid-March 2016th

Architectural, engineering and planning services

Land Sachsen-Anhalt, vertreten durch das Ministerium der Finanzen, vertreten durch das Bau- und Liegenschaftsmanagement Sachsen-Anhalt, NL Nord-West | Published July 31, 2015
Winner
GSP Gerlach Schneider Partner Architekten
cpvs
71240000

On the grounds of the University Hospital Magdeburg A. ö. R. a heart center is to be built. In addition, the extension of the existing Central Emergency (ZNA) on building a 60 is planned. The grounds of the University Hospital located in the central urban area on Leipziger Strasse. The area in question of the Otto-von-Guericke University is according to § 2 para. 2 DenkmSchG LSA an architectural monument. The monument ensemble historic hospital buildings (time of origin from 1890 to 1954) is of particular artistic, urban and historical significance. These are individual buildings in the pavilion system arranged in a partly lush green parklands with wide operating roads in an axial system. For existing buildings, it must be of high-quality partially intact single monument qualities. The urban and architectural insertion of the new building or the extension of the house 15 requires special skills in dealing with the protected inventory. The realization of the entire project must not affect the ongoing operation in the surrounding hospital buildings.

Architectural services for buildings

Land Sachsen-Anhalt, vertreten durch das Ministerium der Finanzen, vertreten durch das Bau- und Liegenschaftsmanagement Sachsen-Anhalt, NL Nord/West; Kennwort: VOF Landgericht Magdeburg, Sanierung Altbau – Gebäudeplanung | Published February 27, 2015
Winner
nps tschoban voss GmbH & Co. KG
cpvs
71221000

Building Design in accordance with § 33 HOAI, Phases 2 to 4 (HU-construction), according RLBau 2014 Saxony-Anhalt for the redevelopment of the old building part of the District Court of Magdeburg. The aim of the building design is the complete restoration of a listed courthouse with about 18 600 m2 of gross floor area incl. Office space ,, court rooms, administrative areas, corridors and social areas, including facade renovation, to accommodate the District Court of Magdeburg and various judicial near Dienststelllen. The palatial, built in Neorenaissanceformen the Wilhelmine period, in 1900, the hotel comprises 4 storeys and a partially converted attic. The adjacent to an existing old building new complex part consists of a main building with a U-shaped side wings and courtyard. When planning are the requirements of a modern courthouse, including security requirements, taking into account the interests of preservation to implement.