Public tenders for architect, architecture in Kiel Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

IT services: consulting, software development, Internet and support

Bayerische Landesbodenkreditanstalt (BayernLabo), Bremer Aufbau-Bank GmbH (BAB), Hamburgische Investitions- und Förderbank (IFB), Investitionsbank Berlin (IBB), Investitionsbank des Landes Brandenburg (ILB), Investitionsbank Schleswig-Holstein (IB.SH), Investitions- und Strukturbank Rheinland-Pfalz (ISB), Investitions- und Förderbank Niedersachsen (NBank), Wirtschafts- und Infrastrukturbank Hessen (WIBank), vertreten durch die Gebäudemanagement Schleswig-Holstein AöR | Published July 11, 2015  -  Deadline August 28, 2015
cpvs
72000000

Criteria. The services subject of the contractor include the following services: software for managing, maintaining and modeling of process steps, business services, information processing rules and technical information. • The package includes all necessary for the current scope of licenses, in accordance with Chapter 3 of the tender specifications. • The scope of supply also includes the modules for the internal control system, enterprise architecture management, simulation, etc., provided that they are covered by the software and are then taken into account accordingly in the license price. By offering the necessary system requirements to be passed. Performing a total of three one-day training schedules for 20 people each. B. regarding interfaces). Fault reports, requests, other questions) with response times until the next working day. The customer assumes the following: Setting up clients, filters and user logic tests, etc., exports, attributes, template etc. If possible through the tool connection of the tools to SAP ESR and Solution Manager system of cooperation.

Architectural, engineering and planning services

Land Schleswig-Holstein, vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published February 7, 2015  -  Deadline March 9, 2015
cpvs
71240000

Design services in the field of technical equipment for the new central laboratory at the University Hospital Schleswig-Holstein (UKSH) Campus Kiel. Parts of the diagnostic departments of Campus Lübeck also moved to Kiel. Gravity of the entire planning, design functional operations in the newly created building architecture (based on an existing functional and operational program) under medical, organizational and economic aspects optimally. The new building contains several functional areas, laboratory areas (vast S2 standard in the laboratories, laboratory standard S3), technical equipment, administration. Bacteriology, blood bank, large machines) regions contain. Provision of adequate refrigeration and storage facilities). The laboratory equipment and laboratory machines are procured from UKSH, but are planning to work in the overall concept. The planning and implementation of a pneumatic tube system is provided. The conversion is performed by the new up to the next possible connection of other hospital buildings on campus. The creation of the freedom to build and repair the infrastructure on the planned park and the environment is planning to work with. 1-8 as a basis for planning ago. The technical center with centrally positioned on the floor, so that the necessary roof structure recedes optically thick. Here are the areas of use of the different institutions. Upstairs are to be arranged a doctor's office, common areas such as locker rooms and lounge, meeting rooms and other office use. 6400 m2. Mandatory Project Dates: Start planning phase planning of TA: June 2015. Start of construction: July 2016. End of construction: August 2018. The budget for the planning of technical equipment is:

Architectural, construction, engineering and inspection services

Fachhochschule Kiel vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published November 11, 2016  -  Deadline December 9, 2016
cpvs
71000000

The following performance profiles according HOAI:

Buildings and interiors according to HOAI § 33 et seq., LPH 1-9 and Special Services.

Gradual commissioning.

The state of Schleswig-Holstein intended for Fachhochschule in Kiel the construction of a learning center consisting of offices for staff and a boardroom (705 m 2 ), Offices for ASTA and Stupa (270 m 2 ), The library with learning courses (2 670 m 2 ) As well as a cafeteria (about 460 m 2 ) With a total of 4100 m NGF 2 ,

The now newly to be planned library learning center that at a later date by approximately 200 to 300 m 2 can be extended.

The building is to stand out architecturally innovative modern functional clear architecture in compliance with the economics of the surrounding buildings and serve for the campus as a multifunctional meeting. A revival of the campus and the traffic areas around the building is expected.

Gross construction costs:

KG 300 about 5 million EUR gross;

KG 400 approximately 3.5 million EUR gross.

Project dates:

Delivery FU-construction (provision LPH 1-2) until June 2017;

Start up in early 2018;

Handing 2020th

The client will ask the tenderer in the course of the negotiation procedure for a writing sample that is to be paid EUR 4 000 gross.

Procedural Vergabeunterlagen are set to the e-procurement platform for method http://www.e-vergabe-sh.de/vergabeplattform/bekanntmachungen/.

Architectural, construction, engineering and inspection services

Fachhochschule Kiel vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published January 21, 2017  -  Deadline February 17, 2017
cpvs
71000000

The following performance profiles according HOAI:

Technical equipment in accordance with HOAI §53 et seq., LPH 1-9 and Special Services.

Gradual commissioning.

The state of Schleswig-Holstein intended for Fachhochschule in Kiel the construction of a learning center consisting of offices for staff and a boardroom (705 m 2 ), Offices for ASTA and Stupa (270 m 2 ), The library with learning courses (2 670 m 2 ) As well as a cafeteria (about 460 m 2 ) With a total of 4100 m NGF 2 ,

The now newly to be planned library learning center that at a later date by approximately 200 to 300 m 2 can be extended.

The building is to stand out architecturally innovative modern functional clear architecture in compliance with the economics of the surrounding buildings and serve for the campus as a multifunctional meeting. A revival of the campus and the traffic areas around the building is expected.

Gross construction costs according to budget:

KG 300 about 5 million EUR gross;

KG 400 approximately 3.5 million EUR gross with the investment groups 1-8;

Investment group 1: 350 000 EUR;

Investment group 2: 350 000 EUR;

Investment Group 3: 525 000 EUR;

Investment Group 4: 1,295,000 EUR;

Investment group 5: EUR 525 000;

Investment group 6: EUR 105 000;

Investment Group 7: EUR 105 000;

Investment Group 8 245 000 EUR.

Project dates:

Delivery FU-construction (provision LPH 1-2) until July 2017;

Start up in early 2018;

Handing 2020th

Procedural Vergabeunterlagen are set to the e-procurement platform for method http://www.e-vergabe-sh.de/vergabeplattform/bekanntmachungen/.

Architectural and related services

Amt Mittelholstein, vertreten durch die Gebäudemanagement Schleswig-Holstein AöR | Published November 3, 2016
Winner
GOS
cpvs
71200000, 71210000

The beginning of the services provided as soon as possible after the auction. The duration of benefits is on

Architectural services for buildings

GMSH Gebäudemanagement Schleswig-Holstein AöR | Published March 9, 2017  -  Deadline April 26, 2017
cpvs
71221000, 71222000

Architectural services for buildings

Architectural and related services

Bundesrepublik Deutschland vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published February 24, 2017  -  Deadline March 23, 2017
cpvs
71200000

On the grounds of the Marine NCO School in Plon the construction of a rescue exercise hall is to be created.

The new building is to be erected on the site of the former farm building. The required geotechnical report is created.

The dimensions of the hall will be approximately 34.5 mx 18.5 m, without the accompanying Attachments / Outbuildings. The size of the pool should be 12.5 mx 25 m. The basin is equipped with 2 diving boards (1 m and 3 m), and a jump platform. The pool depth varies from 4 m to 1.3 m. The height of the hall is in the range of about 8.5 m diving platforms. A detailed space program exists.

For Beck training, stainless steel or reinforced concrete, is a variant of examination be performed.

After commissioning of the new building of the old building will be demolished.

The current ENEV and the EEWärmeG should be adhered to. Selected BNB's characteristics are implemented.

Construction costs amount to about 7.74 million EUR gross, of which about 1/3 of the KGR 400 and 300 T EUR for outdoor facilities.

The following deadlines are to be met:

The delivery of the ES-Bau in EW construction quality is to take place by November 2017th

The execution is to take place beginning in March of 2019. The end of the construction period will be in May 2021st The demolition of the old building follows in the wake.

The project will be completed in December 2021st

Architectural services for buildings

GMSH Gebäudemanagement Schleswig-Holstein AöR | Published March 10, 2017
cpvs
71221000, 71222000

Architectural services for buildings

Architectural, engineering and planning services

Land Schleswig-Holstein vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published April 19, 2016  -  Deadline May 17, 2016
cpvs
71240000

For the FH Lübeck the construction of a new auditorium and conference building is planned. In the angular building two two storey-high auditoriums are provided with an attached service floor in one wing. In the other three-storey wing the conference and associated offices are located. Connected the two areas by a foyer. The total NF 1-7 is approximately 1,500 m 2 , The lecture rooms with ascending stalls are designed for 150 and 120 seats. The structural and technical equipment corresponds to a conventional seminar building a university. The auditoriums receive a ventilation system. The building is designed as a hybrid building, ie the lecture halls are created in precast / conventional construction, the conference room wing could be created as a modular construction, also a conventional construction, however, is impractical.

The financial pad construction to power phase 3 and phase 4, the power is created by the builders. A conceptual fire protection was considered a complete fire protection concept, however, is still set up. A soil report is available, an acoustic report has been drawn up acoustic target values ​​from expert view, which should be considered in further and further.

For the outdoor facilities of the forecourt, the adjacent lawn area and 30 parking spaces are to be processed. The supply and disposal is to bind to the existing control systems. These connections are in the immediate area of ​​the building.

Project dates:

Start of construction: 04/03/2017

End of construction period: 05.25.2018

Handover: 18/06/2018.

Architectural, engineering and planning services

Land Schleswig-Holstein vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published April 15, 2016
Winner
Dr.-Ing. Bernd Kriegel Ingenieure GmbH
cpvs
71240000

The order includes two items:

- Demolition building 03/08 to 06/08, construction of a 3-storey house detention;

- Reconstruction and renovation of existing buildings 8.1 and 8.7 of renewal and expansion of NSHV conditioning.

Built Description:

In closed prisons youth prison Schleswig buildings are 8.3 to 8.6 and a broken accommodation buildings are newly built with 72 detention places. The new building has a floor space of 2 176 m 2 ,

The order of detention cells occurs in 4 groups living in the top 2 floors and a management department on the ground floor, in the basement of the building technical support, training and changing rooms are provided for staff, as well as offices and meeting rooms on external support.

The plot of JA Schleswig is owned by the State of Schleswig-Holstein. In zoning the municipality Schleswig the area is designated as a special area of ​​justice. The development is subject to the plan no. 72 of the town of Schleswig.

The planned construction of the prison house is located within the closed full train and the predetermined building boundaries.

The planned investment amounts to a total gross approximately 11.4 million EUR Construction costs, excl of BNK..

The construction is planned for the middle / end of 2016 until the middle of 2019.

The service phases 1 to 4 have been completed, will be awarded with the order, the work phases 5-8 on the investment groups 1-4, 6 and 8 (optional Anl.Gr. 5).

Architectural, engineering and planning services

Bundesrepublik Deutschland vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published April 2, 2016  -  Deadline May 4, 2016
cpvs
71240000

These equipment rooms with Elektroverteiler- and redundant UPS technology are build.

Architectural, engineering and planning services

Land Schleswig-Holstein, vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published November 17, 2015  -  Deadline December 14, 2015
cpvs
71240000

The contract includes two items: - demolition building 03/08 to 06/08, construction of a new 3-storey detention house; - Reconstruction and renovation of existing buildings 8.1 and 8.7 of renewal and expansion of NSHV conditioning. Built Description: In closed prisons youth institution of Schleswig, the buildings will be canceled 8.3 to 8.6 and an accommodation building will be rebuilt with 72 detention places. The new building has a floor space of 2 176 m2. The order of detention cells is carried out in 4 residential groups in the upper 2 floors and Enforcement Division on the ground floor, in the basement of the building technical support, training and changing rooms are provided for employees, as well as offices and meeting rooms of external support. The plot of the JA Schleswig is owned by the State of Schleswig-Holstein. In zoning plan of the municipality of Schleswig the area has been designated a Special Area of ​​Justice. The development is subject to the development plan no. 72 of the town of Schleswig. The planned new building of the prison house is located within the enclosed full train and the prescribed building boundaries. The planned investment amounts to a total of approximately 11.4 million EUR gross construction costs, excl of BNK.. The construction period is scheduled from mid / end 2016 until mid of 2019. The service phases 1 to 4 have been completed, will be awarded with the order, the work phases 5-8 on the asset groups 1-4, 6 and 8 (optional Anl.Gr. 5).

Architectural and related services

Gemeinde Kronshagen endvertreten durch die Gebäudemanagement Schleswig-Holstein AöR | Published December 8, 2015
Winner
GOS mbH
cpvs
71200000

Fiduciary redevelopment agency for the municipality Kronshagen.

Architectural, engineering and planning services

Land Schleswig-Holstein vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published August 22, 2015
Winner
INROS LACKNER SE
cpvs
71240000

The preliminary design "new use training hall" is already available. A technical room book is part of the financing document submitted for approval - construction, which has been filed with construction costs totaling approximately 6,664,000 EUR. The realization of the construction work carried out after the release of the budget document by the Ministry of Finance. The new deployment training hall consists of a two-part contiguous section of the building and is used for education and training of police and police candidates in use cases. The two-story function latch includes the administrative area, changing rooms, small gyms (z. B. Budohalle), technical areas, Outbuildings, with overall dimensions of approximately 23/47 meters and is conventionally created in massive construction with curtain wall. The use of training hall, dimensions about 24 / 51.50 m, will be built as a separate hall, consisting of reinforced concrete columns, steel trusses and curtain wall and is two storeys in parts. In the hall different scenario areas / topics are presented rooms (banking, housing, restaurant, maze, Garage Hall etc.) that are created in parts of lightweight partitions and expanded fully functional. The development and escape staircases are three storeys constructed in parts and connected via the roof surface with a connecting corridor.

Architectural, engineering and planning services

Land Schleswig-Holstein, vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published July 16, 2015
Winner
DHBT Architekten GmbH
cpvs
71240000

The cost limit is set, a technical room book is available and continue. The released area is used for the construction of the sports hall. In the administration building minor alterations are required. The close technical (design and execution) and scheduling linkage (construction schedule) therefore requires a continuously tight project and cross-trade agreement. To meet the extraordinary security requirements in an elaborate construction site safety and additional security personnel are used. The service to be provided conditionally experience in dealing with the public building and the special safety-related constraints of a correctional facility in operation. The realization of the construction work carried out after approval by the Finance Ministry.

Architectural, engineering and planning services

Bundesrepublik Deutschland, vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published June 5, 2015
Winner
Birkholz Stubenrauch, Architektur- und Ingenieurgesellschaft mbH
cpvs
71240000

These building regulations to a mixed-use building (primarily property, as well as training, office space and warehouse space). The building is to be classified according to LBO § 2 (4) and § 51 (2) LBO SH as special construction. The constructed area is 2085 m2, it is a full basement masonry in composite construction with a roof in wood construction with a floor space of 4 186 m2 with a gross floor area of ​​approximately 7983 m2 with a building volume of 27,834 m3. The building is staggered in height in different parts of the building structured with different functional areas. In the southern 4-storey buildings in the wings Abmesseungen of about 49 x 14 m and a eaves height of about 13.60 m and a 25 ° inclined gabled roof, (alignment approximately east-west direction), the entire guest area is housed. Parallel joins north a 3-storey wing of the same dimensions on, but an eaves height of 9.50 m only cd ... Here premises are housed. Both of the aforementioned parts of the building are connected by a 2-storey, 9.50 - and 15 m wide flat interconnected (h = approx 6.75 m), which protrudes to the north still about 30 m. He takes on additional service space areas.

Architectural, engineering and planning services

Land Schleswig-Holstein, vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published February 25, 2015
Winner
DHBT Architekten GmbH
cpvs
71240000

In closed prisons youth prison Schleswig buildings are canceled 8.3 to 8.6 and a hotel building to be rebuilt with 72 detention centers. The order of detention cells is done in 6 group homes over 3 floors, the basement of the building technology, leisure and meeting rooms are provided, as well as a learning laboratory work and therapy rooms. The planned investment amounts to gross plus about 10 million euro construction costs. the BNK. The construction is planned for mid-2016 to mid-2018.

Architectural, engineering and planning services

Bundesrepublik Deutschland, vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published January 7, 2015  -  Deadline February 10, 2015
cpvs
71240000

The new building is located in an open area in the northern part of the property in a spatial context with other 2 z. Z. accommodation under construction buildings arise. This is building regulations a mixed-use building (primarily property, but also training, office space and warehouse space). The building is classified according to LBO § 2 (4) and § 51 (2) LBO SH as special applications. The building area is 2,085 square meters. There is a full basement Concrete Mixed structure with a roof in wood construction with a floor space of about 4 186 sqm with a gross floor area of ​​about 7983 m² with an enclosed space of 27,834 m³. The building is staggered in height in different parts of the building divided with different functional areas. In the southern wing 4-storey buildings with dimensions of approximately 49 x 14 meters and an eaves height of approximately 13.60 m and a 25 ° inclined gable roof (orientation approximately east-west direction), the entire accomodation is housed. Parallel closes after a 3-storey north wing of the same size to, but an eaves height of only 9.50 m. Here premises are located. Both of the aforementioned parts of the building are separated by a 2-storey, 9.50 - and 15 m wide flat interconnected (h = 6.75 m), which projects to the north was still about 30 m. He takes on additional service space areas.

Architectural, construction, engineering and inspection services

Land Schleswig-Holstein vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published February 15, 2017  -  Deadline March 17, 2017
cpvs
71000000

Generalplanerleistungen following output images in accordance with HOAI and Special Services:

1-8 and Special Services per JVA

2-4 and 6-8 and Special Services per JVA

Gradual commissioning.

It is the JVAen in Flensburg, Schleswig, Lübeck, Kiel and Neumünster.

The need for measurements (radio field measurements TMO and DMO) in the 5 institutions were provided already through the country and are in the planning basis before.

Depending on the scope of the institution size (number of buildings) are introduced one or more ring compounds with the appropriate number of technical rooms for radio cabinets and roof antennas and feed lines and fiber optic connections.

in those institutions are new or renovation work planned, the planning services are complementary and work in cooperation with the planning of the conversion or new construction.

As the refurbishment of technical rooms with the radio cabinets, laying slit ribbon cables and leads in concealed quality or in panels, the installation of roof antennas, production of ring and fiber optic connections between buildings in partially of underground works, etc ..

Where no NEA is present, such a plan and implement the digital radio network.

When editing the individual JVAen the institutions in Lübeck, Kiel and Neumünster are to be considered the first priority.

The commissioning of planning services is gradual and property-based, the services are accessed respectively.

The works are expected to institution based tendered and contracted in individual trades.

Only the general planning services are ordered jointly commissioned for all 5 JVAen.

B. planning to regulatory requirements, the preparation of the approvable financial documents and the processing of invoices and supplements of exporting companies in the administrative regulations of the country.

Procedural Vergabeunterlagen are set to the e-procurement platform for method http://www.e-vergabe-sh.de/vergabeplattform/bekanntmachungen/.

Architectural services for buildings

Land Schleswig-Holstein vertreten durch Gebäudemanagement Schleswig-Holstein AöR | Published March 14, 2017  -  Deadline April 26, 2017
cpvs
71221000, 71222000

Open 2 phaser design competition New Finanzamt Nordfriesland in Husum.