Public tenders for architect, architecture in Hamburg Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural and related services

Freie und Hansestadt Hamburg Bezirksamt Hamburg-Mitte, Dezernat Wirtschaft, Bauen und Umwelt | Published November 8, 2016  -  Deadline December 5, 2016
cpvs
71200000

The Bismarck Monument in the middle of the Old Town area in Elbpark / St. Pauli has been erected in honor of the first German Chancellor Prince Otto von Bismarck, designed by the architect Emil Schaudt and sculptor Prof. Hugo Lederer in 1906th With its 34.3 meters in height, it is firstly the largest monument of Hamburg, on the other hand it is thus also the largest Bismarck statue world. In this case was and is to be noted that the work of Otto von Bismarck, who lived near Hamburg in Friedrichsruh , is still controversial. The aim of rehabilitation is to secure sustainable of the monument including pedestal, Rotunda and terrace outside and inside in their original state and as a symbol of the city of Hamburg within budget. Externally, the penetration of water should be avoided. These include new grouting and the preparation of a water-bearing layer on the inside or the gently sloping or flat components. As part of the planning is to clarify to what extent the structure can be upgraded, that can be dispensed with additional support structures inside. Essentially, the current situation in the interior of the rotunda is to be maintained, however, protected against further decay. This also applies to the ceiling plaster and the paintings with Bismarck sayings that have arisen after the completion of the bunker 1941st The accessibility, which is currently represented by a "Samba staircase" through a shaft to be improved so that people can safely get to guides in the socket. All additional components are to be creatively restrained and subordinate themselves so that the stock of the monument and the bunker can be experienced even for visitors.

Architectural, construction, engineering and inspection services

fördern und wohnen AöR | Published June 16, 2015
Winner
GHP – Landschaftsarchitekten
cpvs
71000000

F & w promote and live AöR is a public institution of the Free and Hanseatic City of Hamburg and provides social services in the area for the homeless, integration assistance and care for the elderly. F & W operates on behalf of the Free and Hanseatic City of Hamburg accommodation facilities, living accommodation, rent, facilities with special offers for women and men with special needs. With this new building project is under the homeless on land west of the August Krogmann Street, behind the listed buildings with the house no. 89-101 or 19-29 housing be built east of the kiln road. When the plot is the parcels 147, 369, 5278 with an area of ​​approximately 9940 m2. There are the power phases are 2-9 covered by § 34 HOAI 2013 building. The project should be ready by the end of June 2017. The client reserves the right to be carried out with functional specifications for the execution of the construction trades on the architect a contractor tender.

Architectural, construction, engineering and inspection services

fördern und wohnen AöR | Published June 16, 2015
Winner
PBA Planungsgesellschaft Haustechnik mbH
cpvs
71000000

F & w promote and live AöR is a public institution of the Free and Hanseatic City of Hamburg and provides social services in the area for the homeless, integration assistance and care for the elderly. F & W operates Hamburg accommodation facilities, living accommodations, rental apartments on behalf of the Free and Hanseatic City. With the new building project is under the homeless on land west of the August Krogmann Street, behind the listed buildings with the house no. 89-101 or 19-29 housing be built east of the kiln road. When the plot is the parcels 147, 369, 5278 with an area of ​​approximately 9940 m². There are the power phases are 1-9 covered by § 34 HOAI 2013 building. The project should be ready by the end of June 2017. The client reserves the right to be carried out with functional specifications for the execution of the construction trades on the architect a contractor tender.

Architectural, construction, engineering and inspection services

fördern und wohnen AöR | Published February 21, 2015  -  Deadline March 3, 2015
cpvs
71000000

F & w promote and live ipc is a public institution of the Free and Hanseatic City of Hamburg and provides social services for the homeless, the integration assistance and care for the elderly. F & W operates on behalf of the Free and Hanseatic City of Hamburg accommodation facilities, living accommodation, rental housing, facilities with special offers for men and women with special needs, institutions of integration assistance and senior housing with care. With the new scheme would help for the homeless on land west of the August Kromann Street, behind the listed buildings with the house number. 89-101 or 19-29 housing be built east of the kiln road. In the plot are the parcels 147, 369, 5278, with an area of ​​approximately 9 940². It calls for the performance phases 1-9 covered under § 34 HOAI 2013 building. The project should be ready by the end of June 2017. The authority reserves the right to be carried out with functional specifications for the execution of the construction trades on the architect a contractor tender.

Architectural, engineering and planning services

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published October 25, 2017
Winner
M&S Beratende Ingenieure GmbH
cpvs
71240000

The land area is 9 100 000 m 2 and the main area is about 3 100 000 m 2 ,

In this activity, SBH was commissioned to renovate the Walddörfer-Gymnasium, Im Allhorn 45, 22359 Hamburg.

The land area is 9 100 000 m 2 and the main area is about 3 100 000 m 2 ,

In this activity, SBH was commissioned to renovate the Walddörfer-Gymnasium, Im Allhorn 45, 22359 Hamburg.

The location is limited to the north by the district school, to the east by the street Im Allhorn, to the south by the park lake "Allhorndiek" and to the west by the Allhorn Stadium.

The entire building complex is protected by a special reform educational architecture.

This part of the building is currently under preparation.

It is only after the completion of this rehabilitation section that the restoration of the remaining parts of the building can begin.

A special focus is on the renovation of the historical building fabric as well as the implementation of the educational requirements.

The mobile class containers must be taken into account during project processing.

DIN 276).

The services to be awarded consist of:

Lot 1:

- Performance phases 2 (partial), 3 (partial) and 4 object planning acc. § 34 HOAI;

- service phases 5 to 8 object planning according to § 34 HOAI as an optional commissioning by the AG, possibly in steps to be determined by the AG;

- Special services in all service phases Project planning according to § 34 HOAI as an optional commissioning by the AG, possibly in steps to be defined by the AG.

The land area is 9 100 000 m 2 and the main area is about 3 100 000 m 2 ,

In this activity, SBH was commissioned to renovate the Walddörfer-Gymnasium, Im Allhorn 45, 22359 Hamburg.

The location is limited to the north by the district school, to the east by the street Im Allhorn, to the south by the park lake "Allhorndiek" and to the west by the Allhorn Stadium.

The entire building complex is protected by a special reform educational architecture.

This part of the building is currently under preparation.

It is only after the completion of this rehabilitation section that the restoration of the remaining parts of the building can begin.

A special focus is on the renovation of the historical building fabric as well as the implementation of the educational requirements.

The mobile class containers must be taken into account during project processing.

DIN 276).

The services to be awarded consist of:

Lot 2:

- Performance phases 2 (partial) and 3 (partial) Technical equipment acc. § 55 HOAI; Groups 1 -5 and 8 acc. § 53 (2) HOAI;

- Performance phases 4 to 8 Technical equipment acc. § 55 HOAI, investment groups 1 - 5 and 8 acc. §53 (2) HOAI as an optional commissioning by the AG (if applicable, in steps to be determined by the client);

- Special services in all service phases Technical equipment acc. § 55 HOAI, Investment Groups 1 - 8 acc. § 52 (2) HOAI as an optional commissioning by the AG (if applicable, in stages to be determined by the AG).

ÜUnterstützung in the administration, maintenance and development, as well as create new reports forthe existing BI system. OV 2016.208

Stadtreinigung Hamburg | Published February 13, 2017  -  Deadline March 15, 2017
cpvs
72200000

Assistance to be awarded in five areas for the existing BI system:. 1 Maintenance and further development of the data warehouse architecture and the associated ETL processes.

Architectural, engineering and planning services

GMH | Gebäudemanagement Hamburg GmbH | Published July 10, 2015
Winner
Architekten PFP Planungs GmbH
cpvs
71240000

The GMH | Building Management Hamburg GmbH is planning as a company of the Free and Hanseatic City of Hamburg, maintains and manages taking into account the interests of the academic school property in the South region. It is looking for a solution that creates a multi-functional educational architecture in compliance with the space program, which promotes the "third teacher" the willingness of all users and users. The following areas are to be accommodated in the function block natural sciences in the function block cafeteria and auditorium and the function block Sport 1 400m² BGF New Area, 730 m² BGF New Area, 660 m² BGF New Area, 2790 m² GFA New Area. It also aims to make statements to the zoning of the newly structured open spaces. It is expected with an optimal ratio of durable constructions, economic investment costs, high energy efficiency and low cost of ownership Design Concepts. The measure must be completed by the end of 2018 and handed over to the user. What is needed is an intense examination of phases and if necessary temporary relocation of function blocks. The amount stated is considered upper cost limit and must be maintained as part of the preliminary design of the competition. The competition language is German. The Competition Committee of the Hamburg Chamber of Architects has awarded for the competition registration number NO_14_14_HRW dated 17.09.2014.

Rehabilitation of school Walddörfer - Project management.

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published March 22, 2016
Winner
Seemann Projektmanagement GmbH
cpvs
71240000

The Free and Hanseatic City of Hamburg for 1.1.2013 in accordance with § 26 (1) Landeshaushaltsordnung the Landesbetrieb SBH | School construction Hamburg (hereinafter referred to as SBH) founded. This country operation has to build the task of planning the school property, taking into account the school matters on a commercial basis, to maintain and manage, and more than 400 schools to thieves Authority for Education and Vocational Training (BSB) for rent. School property includes all used for school purposes land and buildings of state and professional schools. The land area is about 9 100 000 Series m 2 and the main floor space about 3 of 100 000 m 2 ,

The lying in Volksdorf district Walddörfer Gymnasium was from 1928 to 1931 by the architect and then chief building director Fritz Schumacher. The whole complex is under Denkmalschutz.Das project includes the renovation of the buildings and the technical equipment of the building, to the extent necessary for technical condition due to the special educational reform architecture of red brick. A particular focus is the restoration of the historic, vertical sliding windows of the classrooms ( "English" window).

Educational software package

Verwaltungs-Berufsgenossenschaft (VBG) – Hauptverwaltung Hamburg | Published November 28, 2017  -  Deadline January 8, 2018
cpvs
48190000, 48000000

Implementation and adaptation of a learning platform (LMS) based on ILIAS.

The introduction of a learning management system (LMS) and its incorporation into the existing and developing system architecture (including interfaces to VBG management systems and a (learning) content management system).

Architectural, construction, engineering and inspection services

Techniker Krankenkasse | Published April 7, 2016
Winner
Hoffmann.Seifert.Partner
cpvs
71000000, 71200000, 71300000, 71320000, 71221000, 71220000, 71240000, 71250000

During a negotiated procedure after the VOF framework contracts for general planning services for more than 20 real estate owned and 300 leased departments of TK were advertised.

By definition, a general planning performance is the Summary of at least two planning services. The general planner warrants to the building owner the accuracy of the individual plans, including all interfaces within the overall project (assumption of liability). The performance will include all phases of HOAI and the possibility of small orders trigger day sets.

are required planning services both for the decentralized departments (property and rentals) of TK as well as the head office and the two training centers.

The forthcoming planning services the contractor are as follows:

- Part 1: Building design services repair;

- Part 2: Project planning modernization;

- Part 3: Technical equipment;

- Part 4: Project planning outdoor installations;

- Part 5: Fire opinions.

Architectural, construction, engineering and inspection services

Techniker Krankenkasse | Published September 23, 2015  -  Deadline October 5, 2015
cpvs
71000000, 71200000, 71300000, 71320000

Object of the contract are planning services for both the devolved departments of TK as well as the head office in Hamburg and the two training centers in Salzhausen and Hayn. The range of projects includes simple repair tasks conversions towards modernization of administrative buildings. A deeper insight into the typically necessary tasks give the two annexes to the job application / tender documentation example projects for maintenance and modernization. It should be closed with one contractor by lot divided framework agreements on the general planning services. For planning services within a seamless an exclusivity is made in favor of the contractor. This exclusivity includes construction with estimated eligible construction costs 20 000 EUR 1 500 000 in EUR (cost groups 200 through 600 DIN 276) as far as the TK not provides these services themselves. Excluded from the exclusivity are preparatory planning services and variant studies of spatial management of TK. The forthcoming planning services the contractor are classified as follows: - Part 1: Project planning services repair; - Part 2: Planning of modernization; - Part 3: Technical equipment; - Part 4: Planning of outdoor installations; - Part 5: Fire opinions.

Architectural, construction, engineering and inspection services

Techniker Krankenkasse | Published June 6, 2015  -  Deadline July 2, 2015
cpvs
71000000, 71200000, 71300000, 71320000

Object of the contract are planning services both for the decentralized departments of TK as well as the head office in Hamburg and the two training centers in Salzhausen and Hayn. The range of projects includes simple repair tasks conversions towards modernization of administrative buildings. A deeper insight into the typically necessary tasks give the two annexes to the job application / tender documentation example projects for maintenance and modernization. It should be concluded with one contractor for lots Split framework agreements on the general planning services. For planning services within a seamless an exclusivity is made in favor of the contractor. This exclusivity includes construction with estimated eligible construction costs 20 000 EUR 1 500 000 in EUR (cost groups 200 through 600 DIN 276) as far as the TK does not provide these services themselves. Excluded from the exclusivity are preparatory planning services and variant studies of spatial management of TK. The forthcoming planning services of the contractor are as follows: - Part 1: Project planning services repair; - Part 2: Planning of modernization; - Part 3: Technical equipment; - Part 4: Planning of outdoor installations; - Part 5: Fire opinions.

Landscape architectural services

Freie und Hansestadt Hamburg vertreten durch das Bezirksamt Altona | Published February 26, 2015
Winner
Rotzler Krebs Partner Landschaftsarchitekten BSLA
cpvs
71420000

The contract is for the creative formulation of the first phase of the new district park middle Altona ready for implementation LPh 1-3 and 5-8 in stages. In addition to the Master Plan middle Altona developed in advance ideas, wishes and expectations of the general public is an important processing base and must be considered in the design of the park. The processing area covers about 2.7 hectares. Planning task is the design of public green spaces, functional use distribution within the park, and the transition from the park in the urban environment. There are a variety of different usage requirements and functional areas, which makes a high-quality design of outdoor facilities required and which forms the superposition and linking the various interests in the park for the park.

Architectural, engineering and planning services

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published July 17, 2015
Winner
agn Leusmann architekten | ingenieure | generalplaner
cpvs
71240000

The land area is about 9 100 000 Series m2 and the main use area approximately 3.1 million m2. The schools are to be accommodated in the future together in the existing building of the G20. The building is located in the G20 Berufsschulzentrum Bergedorf addition to the state vocational school chemistry, pharmacy, agriculture (G13) and the Staatliche Gewerbeschule Bautechnik (G19). 7300 m2 NGF (1-6) will be cleaned up. Furthermore, sanitation, technology, storage areas and traffic areas (staircases, corridors, etc.) are to be processed. The construction project is to create (Hamburg Institute of Vocational Studies) in close cooperation with the school management and the BOD (Ministry for Schools and Education) / HIBB. The architecture firm Michael Dahm (Hamburg) has been commissioned to develop a space program for both vocational schools. It is intended to appoint an external project manager with project control and project management services. The amalgamation of the schools to be completed mid-2018. DIN 276 cost groups 200-700 for the renovation. The services to be awarded consist of: Lot 1: - Work phases 1 to 2 Objektplanung gem. § 34 HOAI; - Work phases 3 to 9 Objektplanung gem. § 34 HOAI, as an optional assignment by determining the AG (possibly in yet to be determined by the principal stages). Lot 2: - Work phases 1 to 2 according to technical equipment. § 55 HOAI, investment groups 1-8 gem. § 53 (2) HOAI; - Work phases 3 to 9 technical equipment acc. § 55 HOAI, investment groups 1-8 gem. § 53 (2) HOAI, as an optional assignment by determining the AG (possibly in yet to be determined by the principal stages).

Architectural services for buildings

Sprinkenhof GmbH | Published July 13, 2016  -  Deadline July 10, 2016
cpvs
71221000, 71315000, 71317100, 71327000

Architectural services for buildings

Architectural services for buildings

Sprinkenhof GmbH | Published May 7, 2016  -  Deadline May 18, 2016
cpvs
71221000, 71315000, 71317100, 71327000

Architectural services for buildings

Architectural, engineering and surveying services

Flughafen Hamburg GmbH, CS-E Zentraleinkauf | Published January 19, 2016
cpvs
71250000

Master Plan Development Hamburg Airport

Architectural and related services

HafenCity Hamburg GmbH | Published December 8, 2015  -  Deadline January 18, 2016
cpvs
71200000, 71210000, 71240000, 71248000, 71250000, 71300000, 71310000, 71311000, 71311200, 71312000, 71313000, 71530000, 71540000, 71541000

The development, implementation and operation of this urban, heavily mixed-used southern area is headed by the international real estate company Unibail-Rodamco. Currently a total investment volume of some 860 000 000 EUR is estimated. In deeper soil horizons, however, remaining contamination can not be excluded. Here, the interests of the client must be respected. 7 years required. The power of the image Investorenbetreuungs- / project management services comprising essentially of this notice) (see also point II.2.1.): -. Monitoring and documentation of the planning and execution process including the communication process; - Appointment management, interface management; - Reviewing plans; - Technical contract control in the implementation; - Site equipment management; - Control function for contaminated sites;

Architectural, engineering and surveying services

Flughafen Hamburg GmbH, CS-E Zentraleinkauf | Published September 2, 2015  -  Deadline September 21, 2015
cpvs
71250000

Machining and advisory support for project development services at Hamburg Airport: Concept and feasibility studies of development options of different infrastructure classes the airport: • passenger facilities (terminals, gate concepts, passenger piers, passenger boarding bridges, etc.) • aircraft movement areas (aprons, taxiways, runways) • parking facilities • Operating Necessary building visualization of development options both on the basis of plans and sketches as well as based on 3D renderings, creating rough cost estimates, plausibility check and an alternative viewing of infrastructure and operational plans ("Second Opinion"), consolidation of land and functionality requirements of future needs preparation and documentation the results, it is expressly pointed out that, besides the objective assignment of technical consultancy / support services to the project development of medium- to long-term infrastructure development, separately planning and construction services will reach for the award. Bidder or their affiliated companies, the wish to participate in this procurement procedure or intending to provide these services at least in part, be able to provide or offer services not both with the objective advertised activity due to the incompatibility of these activities. It is the two-man rule. The sought in subject methods contractor shall exclusively user side advise the client / care. The or its related companies are not allowed in future procurement procedures for planning services and advice / assistance with the result that they are excreted in this process.

Architectural services for outdoor areas

IBA Hamburg GmbH | Published April 15, 2017  -  Deadline May 12, 2017
cpvs
71222000, 71000000, 71240000, 71242000, 71243000, 71244000, 71245000, 71246000, 71247000, 71420000

At the heart of the Elbe island Wilhelmsburg between Ernst-August-channel Aßmann channel Jaffe Davids Canal and the Red Straße the approximately 47-hectare project area is Elbinselquartier (north-south axis). The aim of this area is an integrated, cooperative neighborhood development with a social and functional mixed-use district is created in which the friendly neighborhood of residential, commercial, allotments, open spaces and educational and care facilities combined with high energy standards for a special trademark high urban quality of life.

Under the tender, the attached functional planning is awarded the project planning outdoor areas (§ 38 et seq. HOAI) based.

The to be awarded planning services include the services of service phases 3-8 gem. § 39 HOAI and special and additional services according to the service image.