Call +44 800 9755 164

Public tenders for architect, architecture in Hamburg...

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural and related services

Freie und Hansestadt Hamburg Bezirksamt Hamburg-Mitte, Dezernat Wirtschaft, Bauen und Umwelt | Published November 8, 2016  -  Deadline December 5, 2016
The Bismarck Monument in the middle of the Old Town area in Elbpark / St. Pauli has been erected in honor of the first German Chancellor Prince Otto von Bismarck, designed by the architect Emil Schaudt and sculptor Prof. Hugo Lederer in 1906th With its 34.3 meters in height, it is firstly the largest monument of Hamburg, on the other hand it is thus also the largest Bismarck statue world. In this case was and is to be noted that the work of Otto von Bismarck, who lived near Hamburg in Friedrichsruh , is still controversial. The aim of rehabilitation is to secure sustainable of the monument including pedestal, Rotunda and terrace outside and inside in their original state and as a symbol of the city of Hamburg within budget. Externally, the penetration of water should be avoided. These include new grouting and the preparation of a water-bearing layer on the inside or the gently sloping or flat components. As part of the planning is to clarify to what extent the structure can be upgraded, that can be dispensed with additional support structures inside. Essentially, the current situation in the interior of the rotunda is to be maintained, however, protected against further decay. This also applies to the ceiling plaster and the paintings with Bismarck sayings that have arisen after the completion of the bunker 1941st The accessibility, which is currently represented by a "Samba staircase" through a shaft to be improved so that people can safely get to guides in the socket. All additional components are to be creatively restrained and subordinate themselves so that the stock of the monument and the bunker can be experienced even for visitors.

Architectural, engineering and planning services

Freie und Hansestadt Hamburg, FB SBH | Schulbau Hamburg | Published November 11, 2016  -  Deadline December 12, 2016
The land area of ​​all general and professional public schools is about 9,100,000 m  2  and the main floor space about 3.1 million million m  2  , 

In this activity, school construction Hamburg was the realization of a primary school with an auditorium, all-day land and two field sports hall in Baakenhafen Allee (Baufeld 94a + b, HafenCity), commissioned in Hamburg.

Next see II.2.4.

The building is to be realized by the HafenCity Ecolabel in platinum.

To add a use that can provide outside school hours for audience intensive frequencies, also a shop / café is provided at the space on the property.

The use of roof areas is provided.

The planning of the kindergarten is not part of this procurement procedure, but structural transitions between the school and the kindergarten are to be made on all floors.

On the part of the builder the development of low-tech solutions, like the examination of an embodiment of modular construction is desirable.

2017 provided.

Engineering design services

Hamburger Hochbahn AG | Published November 10, 2016

Perception of architectural and engineering services at accessible reconstruction of several metro stops (z. B. Hall, Moenckebergstrasse, Jungfernstieg) for passenger according BOStrab. To create planning services as part of the barrier-free conversion of several stops in the network of Hamburger Hochbahn AG HOCHBAHN seeking the support of In-engineering offices for architects and engineers for the following planning trades:

- Level project management / coordination;

- Architecture;

- Technical advice and planning;

- Integrated technical services;

- Town and country planning;

- Related scientific and technical consulting;

- Technical testing and analysis.

The following information is not exhaustive and should serve the participants in this Che-fighting system only as a guide in deciding to participate.

Within the metro network to a total of subway stops are accessible rebuilt. The performance sol.

  • 1