Call +44 800 9755 164

Public tenders for architect, architecture in Erlangen Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural and related services

Stadt Erlangen | Published February 28, 2017  -  Deadline March 9, 2017
cpvs
71200000, 71221000, 71222000

Architectural and related services

Architectural and related services

Stadt Erlangen | Published March 22, 2017  -  Deadline April 18, 2017
cpvs
71200000, 71221000, 71222000

The city of Erlangen plant at the site Draus Nick Road, Schiller Street, Moltkestraße the redevelopment of the Campus Vocational Erlangen. A master plan has already been developed for the long-term development of this vocational school site in Erlangen. In a first step of the workshop wing rebuilt (BGF is approximately 9 000m 2 ) As well as the existing industrial tract (vocational automotive, electrical, metal, painters, hairdressers) refurbished (BGF approximately 17 200 meters 2 ) become. The investment volume is currently estimated at approximately 40 000 000 EUR.

The contract includes the services of Facility Planning gem. Part 3, Section 1, § 33 et seq. HOAI 2013 work phases 1-9. It is a gradual commissioning provided.

Architectural, engineering and planning services

Stadt Erlangen | Published August 8, 2015  -  Deadline September 7, 2015
cpvs
71240000

Subject of the order are architectural services for the renovation of Marie-Therese-Gymnasium in Erlangen.

Architectural, engineering and planning services

Staatliches Bauamt Erlangen-Nürnberg | Published April 9, 2016  -  Deadline May 6, 2016
cpvs
71240000

Architectural services according to HOAI, Part 3, Section 1 for energy renovation of buildings in the area of ​​IV riot police department Nuremberg, grain Burger ST 60..:

Part construction project A) thermal refurbishment of the classroom building with low-rise to high-rise building:

two-storey flat roof, built in 1976, BRI 12 104 m 3 , NF 3038 m 2

two-story classroom building, built in 1971, BRI 10 756 m 3 , NF 1 141 m 2 .

Part construction project B) thermal refurbishment of rod building with closet:

five-storey office building, built in 1972, BRI 6683 m 3 , NF 1 108 m 2

storey closet, built in 1972, built in 1972, BRI 3777 m 3 , NF 691 m 2 .

Each reinforced concrete structures, facades built of architectural precast concrete. Window / fixed glazing in wooden construction, entry / Exterior doors in metal construction, thermally isolated, flat roof predominantly in cold roof construction. With increased disposal costs for contaminated components must - be expected - due to the time of origin.

The energy renovation includes the complete energy retrofit of the building envelope and the building services (area heating / ventilation).

Architectural, construction, engineering and inspection services

Studentenwerk Erlangen-Nürnberg, Anstalt des öffentlichen Rechts | Published June 10, 2016
Winner
ARGE ALEX c/o scherzer. kalau. architekten
cpvs
71000000, 71200000, 71210000, 45000000, 45200000

During construction meetings are approximately provided three times a week on the spot where the specialist planners must be present when needed.

Architectural, engineering and planning services

Staatliches Bauamt Erlangen-Nürnberg | Published October 3, 2015  -  Deadline October 29, 2015
cpvs
71240000

Architectural services according to HOAI, Part 3, Section 1 for the rehabilitation remand (4 BA). Restoration of the old building built in 1898 the pre-trial detention in the area of ​​the JVA Nuremberg. The heritage protection building is classically built in masonry construction with saddle / hipped roof (beaver tail coverage). On 3 floors in both public spaces (Torwache, administration, attorney rooms, church area, classroom), as well as detention cells spread. The 4th BA is realized during operation in 3 Teilbauabschnitten. The refurbishment includes both measures resulting from wear or health requirements (renovation floors, walls, ceilings facade) as well as measures that the functional integrity (renewal of the techn. Equipment / energy retrofit) and security (rehabilitation prison cell doors, windows, window bars, implementation fire protection concept) serve. GFA: approximately 3 650 m2, NGF (KG-2 OG.): Approximately 2 500 m2, DG is not expanded.

Architectural and related services

Waldkrankenhaus St. Marien gGmbH | Published October 30, 2015
Winner
Eckl + Partner Architekten und Ingenieure
cpvs
71200000

It will be awarded architectural services for the preparation of an extension of the structural expansion of the Forest Hospital St. Marien in Erlangen. The contract includes design services according to the Fee Structure for Architects and Engineers (HOAI) Part 3 Project planning for buildings and interiors. It is intended to award the work phases 5 to 9 as well as special and additional services. The appointment is in stages, initially for partial performance of the Power Phase 3, if necessary power stage 4 and output stages 5, then the power phases 6 and 7, and finally the power stages 8 and 9. The appointment of the stages can be carried out only in the presence of the budgetary conditions. A legal entitlement to commission these services does not exist.

Architectural services for buildings

Stadt Erlangen | Published September 1, 2015
cpvs
71221000

Städtebaulicher Ideen- und Realisierungswettbewerb Zentrum für angewandte Sportwissenschaft und Technologie sowie Neubau einer Vierfachsporthalle in Erlangen.

Architectural and related services

Waldkrankenhaus St. Marien gGmbH | Published July 18, 2015  -  Deadline August 17, 2015
cpvs
71200000

It is intended to award the work phases 5 to 9 and special and additional services. Run advantage. ... Among other things. Found points of contact in the fire protection concept, technical equipment, user polls, site logistics and in the maintenance (security) of the hospital setting. Completion is scheduled for BA 1 January of 2019. ... For the planning of the following time frame must be adhered to: commissioning of planners: from October 2015 for BA 1 and 2 processing LP 5, up to and including October 2016 (BA 1, 2) tender and contract awards:. From October 2016 to May 2017 Construction : May 2017 (BA 1) Completion, transfer, final invoice: January 2019 Total completion BA 1 and 2: mid 2020 ... The construction work is to be performed during operation. Close coordination with the planning and construction parties as well as with the supervision department of the city of Erlangen is imperative for the construction work.

Architectural, engineering and planning services

Staatliches Bauamt Erlangen-Nürnberg | Published February 4, 2015
Winner
Burnickl Ingenieur GmbH
cpvs
71240000

Architectural services according to HOAI Part 3, Section 1, as well as technical equipment "M" (investment groups 1, 3, 7, 8) and "E" (investment groups 4.5, 6) HOAI, Part 4, Section 2 below.

Architectural and related services

Stadt Erlangen | Published February 22, 2017  -  Deadline March 9, 2017
cpvs
71200000, 71221000, 71222000

The Heinrich-Lades-Halle is an event hall of Erlangen, with a large hall with a floor area of ​​approximately 1100 m² and a small hall with a floor area of ​​approximately 300 m², and other conference rooms. Since 2009, the rehabilitation of the Heinrich-Lades-Halle occurs during operation in individual stages.

In phases 1 to 3 of the small hall, and lobby already been extensively renovated. In 2016 the SA 4.1 was executed by mostly had the fire protection renovation of technical equipment, and the construction of a ventilation center for content. In the now imminent phases 4.2 and 4.3 a comprehensive fire protection renovation of the Great Hall, the foyer and the basement floors, and a complete upgrading of technical equipment and stage technology is to take place. The renovation work will take place in the period from January 2018 to October 2018, in which the hall is closed to event operation. Subject of procurement are the benefits of the project planning of the work phases 1-3 and 5-9 for the BA's 4.2 and 4.3.

Architectural and related services

Unversitätsklinikum Erlangen – Neubau Forschungsgebäude Translational Research Center IV (TRC IV) | Published December 22, 2016
Winner
Fritsch + Tschaidse Architekten GmbH
cpvs
71200000

The University Hospital Erlangen is planning to build another construction stage of the Center for Translational Clinical Research, TRC.

The building for the patient-centered research is taking into account the existing urban idea which was developed as part of the planning for existing 1st phase of construction of the Centre (TRC I), designed to.

The construction site is located south of Schwabachanlage, west of the TRC I. It is planned to construct a building with 5 full floors. After completion of the building and respect an adjacent old building is to demolish and dispose of.

The total cost of operation (without initial), incl. Demolition, amounted 24 million EUR gross for KGR 200-700.

Events:

Planning: IV quarter of 2016 - 2018;.

Realization: 2019 - 2021;

Indicator:

NF properties: ca. 2000 m²;

NF demolition: ca. 2000 m²;

Note:

It is intended as a first partial power to create a feasibility study (baufachliches appraisals and cost estimates) to 12/2016. The other services are commissioned gradually. There is no right to a further appointment.

Architectural services for buildings

Regnitz Werkstätten gGmbH | Published April 7, 2016
Winner
Arte Architekten GmbH
cpvs
71221000

The authority intends erected 1984/1985 and 1989/90 Advanced modernizing buildings energetically and to optimize accessibility. In addition to the renovation of the roof, the windows and the entire house technology, for example, an additional elevator in this connection installed and overhauled the existing elevators, built nursing bathrooms and installed automatic doors. At the same time the structural fire protection is improved by the installation of a sprinkler and escape balconies.

The project is a follow-up of the initiated modernization of adjacent areas in the same building tract, so that it comes to interfaces.

The construction project refers to a gross floor area of ​​approximately 2 484.2 sqm on the ground floor and about 2 793.5 m² upstairs. To realize this project, the benefits for the project planning building in accordance with Phases 5 to 9 in accordance with § 34 HOAI 2013 are required. The benefits of the work phases 1 to 4 have already been rendered. The object is the fee band assigned to III. Existing structures is mitzuverarbeiten. The conditions for the appointment of a surcharge gem. § 36 para. 2 HOAI 2013 are given.

Architectural and related services

Unversitätsklinikum Erlangen – Neubau Forschungsgebäude Translational Research Center IV (TRC IV) | Published July 30, 2016  -  Deadline September 2, 2016
cpvs
71200000

The University Hospital Erlangen is planning to build another construction stage of the Center for Translational Clinical Research, TRC.

The building for the patient-centered research is taking into account the existing urban idea which was developed as part of the planning for existing 1st phase of construction of the Centre (TRC I), designed to.

The construction site is located south of Schwabachanlage, west of the TRC I. It is planned to construct a building with 5 full floors. After completion of the building and respect an adjacent old building is to demolish and dispose of.

The total cost of operation (without initial), incl. Demolition, amounted 24 million EUR gross for KGR 200-700.

Events:

. Planning: IV quarter of 2016 - 2018

Realization: 2019 - 2021

Indicator:

NF properties: 2.000 m 2

NF Demolition: 2,000 m 2

Note:

It is intended as a first partial power to create a feasibility study (baufachliches appraisals and cost estimates) to 12/2016. The other services are commissioned gradually. There is no right to a further appointment.

Architectural, engineering and planning services

Stadt Erlangen, Amt für Gebäudemanagement | Published January 5, 2016
Winner
Burnickl Ingenieur GmbH
cpvs
71240000

The work phases are each gradually commissioned. Prior to this, an architectural competition was held, which was finding the best possible solution, the Frankenhof in its function as a leisure center in creative, functional, economic and energy terms timely and sustainable architectural refocus. Erlangen Children Frankenhof group) as well as a tourist accommodation, a catering operation and spaces for various actors of civic engagement with all additional necessary infrastructure areas (engineering, transport, construction, etc.) to accommodate. The building complex "Frankenhof" is entered in the list of monuments of the Bavarian State Office of Historic Monuments as a historic landmark. It is assumed that a complete disassembly and renovation of all technical facilities.

Architectural, engineering and planning services

Stadt Erlangen, Amt für Gebäudemanagement | Published December 22, 2015
Winner
Muck Ingenieure
cpvs
71240000

The work phases are each gradually commissioned. Prior to this, an architectural competition was held, which was finding the best possible solution, the Frankenhof in its function as a leisure center in creative, functional, economic and energy terms timely and sustainable architectural refocus. Erlangen Children Frankenhof group) as well as a tourist accommodation, a catering operation and spaces for various actors of civic engagement with all additional necessary infrastructure areas (engineering, transport, construction, etc.) to accommodate. The building complex "Frankenhof" is entered in the list of monuments of the Bavarian State Office of Historic Monuments as a historic landmark. All floor slabs were executed in reinforced concrete, the flat roofs with vapor barrier, insulation and a roof covered with gravel layer. All space-forming wall and ceiling wheels are matched to the building grid.

Architectural, engineering and planning services

Stadt Erlangen, Amt für Gebäudemanagement | Published December 24, 2015
Winner
iwb Ingenieurgesellschaft mbH
cpvs
71240000

The work phases are each gradually commissioned. Prior to this, an architectural competition was held, which was finding the best possible solution, the Frankenhof in its function as a leisure center in creative, functional, economic and energy terms timely and sustainable architectural refocus. Erlangen Children Frankenhof group) as well as a tourist accommodation, a catering operation and spaces for various actors of civic engagement with all additional necessary infrastructure areas (engineering, transport, construction, etc.) to accommodate. The building complex "Frankenhof" is entered in the list of monuments of the Bavarian State Office of Historic Monuments as a historic landmark. It is assumed that a complete disassembly and renovation of all technical facilities.

Architectural services for buildings

Regnitz Werkstätten gGmbH | Published November 17, 2015  -  Deadline December 14, 2015
cpvs
71221000

The authority intends to conclude the built 1984/1985 and 1989/90 of advanced building energetically to modernize and optimize accessibility. In addition to the renovation of the roof, the windows and the entire house technology, for example, an additional elevator in this context built and overhauled the existing elevators, built care baths and installed automatic doors. At the same time the structural fire protection is improved by the installation of a sprinkler system and of escape balconies. The project is a follow-up an already started modernization of adjacent areas in the same building tract, so that it comes to interfaces. The construction project refers to a gross floor area of ​​approximately 2 484.2 m2 on the ground floor and about 2 793.5 m2 upstairs. To realize this project, the benefits of the Building design according to Phases 5 to 9 in accordance with § 34 HOAI 2013 are required. The benefits of the work phases 1 to 4 have already been rendered. The object is the Honorary Zone III should be assigned. Existing structures is mitzuverarbeiten. The conditions for the appointment of a surcharge acc. § 36. 2 HOAI 2013 are given.

Architectural, engineering and planning services

Stadt Erlangen, Amt für Gebäudemanagement | Published August 22, 2015  -  Deadline September 22, 2015
cpvs
71240000

The work phases are each gradually commissioned. Prior to this, an architectural competition was held, which was finding the best possible solution, the Frankenhof in its function as a leisure center in creative, functional, economic and energy terms timely and sustainable architectural refocus. Erlangen Children Frankenhof group) as well as a tourist accommodation, a catering operation and spaces for various actors of civic engagement with all additional necessary infrastructure areas (engineering, transport, construction, etc.) to accommodate. The building complex "Frankenhof" is entered in the list of monuments of the Bavarian State Office of Historic Monuments as a historic landmark. All floor slabs were executed in reinforced concrete, the flat roofs with vapor barrier, insulation and a roof covered with gravel layer. All space-forming wall and ceiling wheels are matched to the building grid.

Architectural, engineering and planning services

Stadt Erlangen, Amt für Gebäudemanagement | Published August 22, 2015  -  Deadline September 22, 2015
cpvs
71240000

The work phases are each gradually commissioned. Prior to this, an architectural competition was held, which was finding the best possible solution, the Frankenhof in its function as a leisure center in creative, functional, economic and energy terms timely and sustainable architectural refocus. Erlangen Children Frankenhof group) as well as a tourist accommodation, a catering operation and spaces for various actors of civic engagement with all additional necessary infrastructure areas (engineering, transport, construction, etc.) to accommodate. The building complex "Frankenhof" is entered in the list of monuments of the Bavarian State Office of Historic Monuments as a historic landmark. It is assumed that a complete disassembly and renovation of all technical facilities.