Public tenders for architect, architecture in Dresden Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Industry specific software package

Landesamt für Straßenbau und Verkehr, Zentraler Sercvicebereich | Published March 3, 2017
Winner
Siemens Aktiengesellschaft RC-DE MO Nord
cpvs
48100000

The advertised performance included the indefinite provision of standard software for process control and display systems of plants on federal highways in Saxony, such as the operational equipment of tunnels and remote control systems for PWC-systems, systems to rainwater retention basins, radio container traffic counting systems and ice warning systems.

21 pcs. Upgrade Simatic WinCC Open Architecture Process monitoring and visualization software from version 3.11 to version 3.15.

Industry specific software package

Landesamt für Straßenbau und Verkehr, Zentrale | Published March 11, 2017
Winner
Siemens Aktiengesellschaft RC-DE MO Nord
cpvs
48100000

21 pcs. Upgrade Simatic WinCC Open Architecture Process monitoring and visualization software from version 3.11 to version 3.15.

The award notice from 03.03.2017 the value of the order was V point 2.4 accidentally given in section VAT amounting to 384 469.95 EUR. The value of the order is actually but 323 083.99 EUR exc.

Industry specific software package

Landesamt für Straßenbau und Verkehr, Zentraler Sercvicebereich | Published November 26, 2016  -  Deadline January 11, 2017
cpvs
48100000

The advertised performance includes the indefinite provision of standard software for process control and display systems of plants on federal highways in Saxony, such as the operational equipment of tunnels and remote control systems for PWC-systems, systems to rainwater retention basins, radio container traffic counting systems and ice warning systems.

21 St. Upgrade SIMATIC WinCC Open Architecture Process monitoring and visualization software from version 3.11 to version 3.15.

Architectural and related services

Staatbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden I | Published November 18, 2017
Winner
Dipl.-Ing. Jens Uwe Anwand
cpvs
71200000

On behalf of the Free State of Saxony, the south wing of the castle Nossen is being renovated. In addition to conservation measures for structural and structural consolidation, the construction project includes structural and technical measures for the expansion of the ground and first floors of the Museum of the History of the Saxon Nobility, including the production of a handicapped accessible toilet facility, the fitting out of a room for museum education in the castle and measures reasonable effort in the courtyard for barrier-free access. Basement and attic remain unused for the time being. Construction is scheduled to begin in 2019 and be completed in 2021. The total construction costs amount to approximately 4 134 000 EUR (KG 300 - 700) (net).

It is planned to award architect services in accordance with HOAI § 34 in stages. The assignment is initially for performance level 1 and includes the development of the EW construction according to section F 3 RLBau. Planning components of an existing design document construction from the year 2007 and a requirement declaration of the SBG gGmbH are to be used.

Architectural, engineering and planning services

Staatbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden II | Published November 3, 2017
Winner
Fischer+Werner Partnerschaft
cpvs
71240000

Extremely complex are the functional and local demands on the ministerial building - home to 3 fully equipped ministries (economy and labor, home affairs, environment and agriculture)

- Provision of hundreds of workplaces with technical rooms, library, canteen, social rooms, readiness to drive,

- publicly accessible despite special security requirements,

- Accommodation of shops.

Further information can be found in the tender documents, which are provided in the link I.3.

It is planned to award the architect services according to HOAI § 34 for the performance phase 3.

As a result of an energetic preliminary investigation, the following measures were defined to achieve this goal:

Replacement of luminaires equipped with fluorescent tubes considering the given architectural design against LED-operated luminaires with an average 50% higher luminaire efficiency.

Increase the energy efficiency of the ventilation and air conditioning units of heat recovery systems and install energy efficient fan motors.

Improvement and modernization of the thermal insulation of the outer wall construction (ETICS) and the foyer glazing.

Modernization of the digital infrastructure and including the associated server room cooling.

The structural measures must take into account the specific safety concerns and the particular urban traffic situation.

The planning work is carried out using energy balancing in accordance with DIN V 18599 for the optimization of energy efficiency, climate impact and economic efficiency as well as simulation methods for the qualitative and quantitative assessment of heat flows in building structures.

Stock situation:

20 000 m 2

31 518.47 m 2

- Facade surface ETICS:

2 350 m 2 (2 316.8 m 2 )

3 600 m 2 (3 539.2 m 2 )

upstairs

1 650 m 2

2 000 m 2

- Glass surfaces foyer: 1 150 m 2

100 decentralized technical installations for ventilation and air conditioning

300 KW cooling capacity

- Hot water heating with radiators, district heating connection.

Architectural and related services

Staatbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden II | Published March 14, 2017  -  Deadline March 27, 2017
cpvs
71200000

Contract is the Facility Planning Building gem. Part 3, Section 1 HOAI for the construction of a universally usable teaching and laboratory building of the Academy of Sciences Dresden with its features building materials technical / teaching and workshop area of ​​design faculty / teaching and research of the faculty of computer science u. Mathematics / office work spaces / archiving , The project is in the highest quality level "Gold" according to the rating system for Sustainable Building Federal Building (BNB), module teaching building (UN_V2013) are certified. The space program of the new building covers a floor space (NF 1-7) of 8,220 square meters on an approximately 7000 m² of land on the campus of the HTW Dresden. For the new building cost (KG 300 u. 400) in the amount of 42.3 million EUR / gross estimated. First is a contracting of services to the LPH. 4 acc. § 34 HOAI provided with the gradual commissioning of additional services of LPH 5 to 8 option.

Architectural and related services

Staatbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden II | Published March 1, 2017  -  Deadline March 27, 2017
cpvs
71200000

Contract is the Facility Planning Building gem. Part 3, Section 1 HOAI for the construction of a universally usable teaching and laboratory building of the Academy of Sciences Dresden with its features building materials technical / teaching and workshop area of ​​design faculty / teaching and research of the faculty of computer science u. Mathematics / office work spaces / archiving , The project is in the highest quality level "Gold" according to the rating system for Sustainable Building Federal Building (BNB), module teaching building (UN_V2013) are certified. The space program of the new building covers a floor space (NF 1-7) of 8,220 square meters on an approximately 7000 m² of land on the campus of the HTW Dresden. For the new building cost (KG 300 u. 400) in the amount of 42.3 million EUR / gross estimated. First is a contracting of services to the LPH. 4 acc. § 34 HOAI provided with the gradual commissioning of additional services of LPH 5 to 8 option.

Architectural and related services

Drewag – Stadtwerke Dresden GmbH | Published February 9, 2017  -  Deadline February 24, 2017
cpvs
71200000

DREWAG - Stadtwerke Dresden GmbH intend the conversion of a building into an office building in Dresden. For this is an existing building to renovate. including for the entire building project. Planning and other additional costs are about 2.7 million EUR are available.

The building currently has about 1 210 m² GFA. By inserting intermediate levels, the GFA is to increase 200-300 m². There is a cellar under the building with currently two floors, each floor approx 400 m² GFA. Taking into account the structure of the building, the building must be provided with additional intermediate levels, so that a proportionately 3rd floor could be realized. In the building offices, a multimedia lab, directing and recording rooms, studios incl. The necessary infrastructure with adjacent areas are to be created, and workshop rooms in the basement.

Architectural and related services

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden I | Published February 11, 2017  -  Deadline March 9, 2017
cpvs
71200000

On behalf of the Free State of Saxony of the south wing of the castle Nossen is redeveloped. The construction project includes not only conservation measures for static and structural consolidation structural and technical measures for the expansion of the ground and first floors of the museum of the history of the Saxon nobility, including the preparation of a disabled toilet facilities, the fitting-out of a room for the museum education in the castle and measures reasonable effort in the courtyard accessible development. Basement and attic remain for now unused. The construction can begin in 2019 and be completed in 2021. The total construction costs amount to approximately 4,134,000 EUR (KG 300-700) (net).

It is planned to award architectural services according to HOAI § 34 stepwise. The appointment is initially for power stage 1 and the preparation of EW-building in accordance with Section F includes 3 RLBau.

Planning components of an existing design document construction from 2007 and a required application of the SBG are gGmbH to use.

Architectural and related services

Universitätsklinikum Carl Gustav Carus Dresden an der Technischen Universität Dresden | Published January 12, 2017  -  Deadline February 17, 2017
cpvs
71200000

Planning molecular Pathology Laboratory (MPL) as an extension to the building House 43 (pathology) services as overall planner / consortium for the work phases 2-8 after HOAI in a phased commissioning. is the basis for planning the implementation of a space program based on a preliminary investigation or urban laboratory development concept. Significant planning focuses on modern molecular pathology research workstations, functional planning, taking into account the workflow, flexible use u. Economic construction. Particular emphasis is placed beyond the subsequent operation in the planning of economy for investment and.. Compliance with the total construction cost is the highest priority. The space program is currently still in development. The builders planning permission for development of Phases 2-3 based on a task (basic evaluation) is first issued.

It is planned to commission a total planner / consortium after the current HOAI to the performance phase. 3

Services of the performance profiles of the work phases 2-8 of the HOAI

§33 Facility Planning,

§49 Structural engineering,

§53 Technical Equipment (without laboratory planning).

The commissioning of the power phases is gradual by the builders according to release funds.

Architectural and related services

Universitätsklinikum Carl Gustav Carus Dresden an der Technischen Universität Dresden | Published March 18, 2017  -  Deadline April 19, 2017
cpvs
71200000

The UKD operates since 1992 a surgical center with 10 operating rooms, ITS, central sterilization and emergency department. The building consists of basement, ground floor, 1st floor, 2nd floor and attic. Installed in the building technical equipment is worn out and should be repaired with the same use for a 1 BA. Project planning for the renovation of the TGA, work phases 3-7 after HOAI in a phased commissioning. is the basis for planning the implementation of the requirements of the planning of TGA 1. BA. Planning focuses on the construction technology (building logistics) efficiency in implementation and operation. Realization is a 1 BA UG to 1st floor. The building is shut down at the beginning of the 1st phase of construction. Planned start of construction is the end of 2018 and commissioning of the first phase of construction (5 OPs) end 2019. Compliance with the total construction costs and dates is the top priority. The builders planning permission for development of Phases 3 is first - 4 issued.

Services of the performance profiles of the work phases 3-7 of the HOAI, §34 performance image and interiors.

The commissioning of the power phases is gradual by the builders according to release funds.

Distribution of the total value in KG:

- KG 300: about 1.8 million EUR

- TGA Conditioning Group 1 - 3 Approx 7.3 million EUR.

Architectural and related services

Drewag – Stadtwerke Dresden GmbH | Published January 28, 2017  -  Deadline February 15, 2017
cpvs
71200000

DREWAG - Stadtwerke Dresden GmbH intend the conversion of a building into an office building in Dresden. For this is an existing building to renovate. including for the entire building project. Planning and other incidental expenses are EUR 2.7 million.

The building currently has about 1 210 m 2 BGF. By inserting intermediate levels the BGF is 200-300 m 2 to increase. There is a cellar under the building with currently two floors, each floor approx 400 m 2 BGF. Taking into account the structure of the building, the building must be provided with additional intermediate levels, so that a proportionately 3rd floor could be realized. In the building offices, a multimedia lab, directing and recording rooms, studios incl. The necessary infrastructure with adjacent areas are to be created, and workshop rooms in the basement.

The performance will be in sections / commissioned gradually.

Stage I: represents the preliminary design (power phase 3) and the permit applications (power phase 4) HOAI performance Building Planning.

Optionally, the commission:

Stage II: Power Phase 5 (execution planning) HOAI

Stage III: Work phase 6 (Preparation of tender) and 7 (participation in contract award)

Stage IV: performance phase 8 (object monitoring / supervision and documentation)

Level V: power phase 9 (Property Services) of the aforementioned power images.

A claim for the provision of all the stages is not.

Architectural and related services

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden I | Published October 25, 2016  -  Deadline November 21, 2016
cpvs
71200000

It is planned to architectural services in accordance with fees for architects and engineers (HOAI) § 33 section 1 of the power phases 5 - to forgive. 8

Architectural and related services

Staatsbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden I | Published November 15, 2016  -  Deadline November 21, 2016
cpvs
71200000

On behalf of the Free State of Saxony, the Old Masters Picture Gallery will be renovated in the Semper the Dresden Zwinger. The 1st phase of construction in the western part was already implemented under continuation of the museum operation in the eastern part and opened in the spring of 2016 for visitors again. Construction work on the 2nd phase of construction in the western part of Semperbaues to begin in 2017th There is provided a construction period of about 1.5 years. It is already available a draft document (EW-Bau) by RLBau Saxony, which includes both construction phases. The total construction costs for the 2nd phase of construction amounts to 12,151 TEUR (KGR 300 -.. 400, incl. VAT).

Architectural and related services

Universitätsklinikum Carl Gustav Carus Dresden an der Technischen Universität Dresden | Published February 18, 2017  -  Deadline March 27, 2017
cpvs
71200000

The UKD operates since 1992 a surgical center with 10 operating rooms, ITS, central sterilization and emergency department. Installed in the building technical equipment is worn out and should be repaired at approximately the same use. Fachplanung repair of technical equipment for ventilation and air conditioning and plumbing. Work phases 3-7 after HOAI in a phased commissioning. is the basis for planning the implementation of the requirements of the existing plant technology (media volume). Planning focuses on the efficiency in implementation and operation. Realization is in phases. The building is shut down at the beginning of the 1st phase of construction. Planned start of construction is the end of 2018 and commissioning of the first phase of construction (5 OPs) end 2019. Compliance with the total construction costs and dates is the top priority. The builders planning permission for development of Phases 3-4 is first issued.

Services of the performance profiles of the work phases 3-7 of the HOAI §53 Technical Equipment (AG 1/3).

The commissioning of the power phases is gradual by the builders according to release funds.

Architectural and related services

Staatbetrieb Sächsisches Immobilien- und Baumanagement, Niederlassung Dresden II | Published August 7, 2015  -  Deadline August 31, 2015
cpvs
71200000, 71221000

Dienstleistungen von Architekturbüros

Architectural and related services

Universitätsklinikum Carl Gustav Carus Dresden an der Technischen Universität Dresden | Published September 23, 2017  -  Deadline October 27, 2017
cpvs
71200000

This results in special requirements for the planning of interdisciplinary research workplaces.

The building project has to be planned and realized within 4 years and has to be settled within 5 years.

Scheduled start of planning immediately after completion of the procedure.

Scheduled start of planning immediately after completion of the procedure.

Start planning: 2017

Start of realization: 3/2019

Completion: 12/2022

The content of the planning is the implementation of a predetermined spatial program based on urban planning precedents.

It is planned to commission an overall planner / bidding company according to HOAI up to performance phase 4.

Performance of performance pictures of HOAI's performance phases 2-8

- §33 Object planning,

- §49 Structural Engineering,

Laboratory / Medical Planning).

The commissioning of further service phases is carried out step by step by the builder according to the release of financial resources.

Architectural services for outdoor areas

Landeshauptstadt Dresden, GB Stadtentwicklung, Bau, Verkehr und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published February 28, 2017  -  Deadline March 29, 2017
cpvs
71222000

The City of Dresden intends to build a new school building and a two-field sports hall.

Services of the power phases (Phases.) 2-9 in accordance with § 39 HOAI 2013 - Appendix 11.

Gross floor area (GFA) school building Ersatzneubau approximately 7927 m 2 and two field Gymnasium approximately 1 928 m 2 .

Cost of outdoor facilities on the KG 500 for free-renewal approximately 1.4 million EUR gross.

Architectural services for outdoor areas

Landeshauptstadt Dresden, Geschäftsbereich Stadtentwicklung, Bau und Verkehr, Stadtplanungsamt, Abteilung Stadtplanung Innenstadt | Published February 24, 2017
cpvs
71222000

Aim: The aim of this competition is to develop the analysis of the present conditions, the recent planning history and the historical references an attitude for the future significance and adequate use of the processed clearances. The findings are in an open space planning, which surrounds the idea of ​​the old town and many lively promenade ring converts superior to convict.

Subject of the competition:

Implementation part: Northern and Southern Postplatz and Marie Street and west to the Marienstraße adjacent verges

Idea part: Southern End Promenade Marie Street, Western area of ​​Bastion Mercury and environment of "cultural block" on the Postplatz

Total scope of services to be awarded: It is intended to award the following services: Gradual commissioning of LPH 2-9 of services of Facility Planning of outdoor installations in accordance with HOAI §§ 3 (2) and 39. With the conclusion of the contract is first of Planu.

Architectural services for buildings

Landeshauptstadt Dresden, GB Finanzen und Liegenschaften, Amt für Hochbau und Immobilienverwaltung | Published March 17, 2017
Winner
Bewerbergemeinschaft Schubert Horst Architekten Partner
cpvs
71221000

The City of Dresden intends the demolition of the existing building of the high school Klotzsche and the construction of a 5-spacious school building.

Services of the power phases (Phases.) 2-9 in accordance with § 34 HOAI 2013 - plant 10 gross floor area (GFA) school building replacement building about 10 310 m², construction costs (BK) on the KG 300 and KG 400 for the replacement construction of the school building about 16 050 000 EUR gross.