Public tenders for architect, architecture in Berlin Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Rebuilding schools - Architect architect LP 6-9

Bezirksamt Treptow-Koepenick von Berlin | Published April 6, 2017  -  Deadline June 16, 2017
cpvs
71221000

Study contract on the study: "Architecture-based analyzes onboard helicopters"

Planungsamt der Bundeswehr RefStudMgmtBw | Published May 9, 2017  -  Deadline May 16, 2017
cpvs
73000000

Study: "Architecture-based analyzes onboard helicopters"

Study contract on the study: "Architecture-based analyzes onboard helicopters"

Planungsamt der Bundeswehr RefStudMgmtBw | Published August 1, 2017  -  Deadline June 14, 2017
cpvs
73000000

Study: "Architecture-based analyzes onboard helicopters"

WHG 1595, architect and engineering services

GESOBAU AG, Bereich Einkauf | Published March 2, 2015  -  Deadline April 9, 2015
cpvs
71248000, 71247000, 71246000, 71245000, 71244000, 71243000, 71242000, 71241000, 71240000, 71000000

WHG 1595, Architekten und Ingenieurleistungen

Rebuilding schools - Architect LP 2-5

Bezirksamt Treptow-Koepenick von Berlin | Published April 6, 2017  -  Deadline June 16, 2017
cpvs
71221000

Architectural, engineering and planning services

Land Berlin – SILB Sondervermögen Immobilien des Landes Berlin, vertreten durch die BIM Berliner Immobilienmanagement GmbH | Published December 31, 2015
Winner
Obermeyer Planen + Beraten GmbH
cpvs
71240000, 71200000, 71300000, 71340000

New administration building (architect) for the LaGeSo.

Assembly and dismantling of the exhibition architecture China and Egypt

Stiftung Preußischer Kulturbesitz | Published April 10, 2017  -  Deadline April 24, 2017
cpvs

Architectural services for buildings

Land Berlin, vertreten durch den Bezirk Lichtenberg von Berlin, Serviceeinheit Facility Management, Baumanagement | Published September 3, 2016  -  Deadline September 28, 2016
cpvs

Not Open competition f. Architects / interior. The co m. a landscape architect is recommended. Object d. Competition is d. Construction of a 5-sized integrated secondary school (ISS) m. 3 spacious Gymnasium upper level, a triple sports hall and required pause u. Sports open space at the site Wartiner Straße 1-3, 13057 Berlin-Lichtenberg. The plot has a size of approximately 15 000m 2 ,

Architectural services for buildings

Nachbarschaftsheim Neukölln e. V. | Published May 3, 2017
Winner
Anne Lampen Architekten GmbH
cpvs
71221000

Additional costs.

The fee for the architect / the architect is to be applied provisionally:

KG 200: EUR 5,000 net,

KG 300: 1 990 000 EUR net,

KG 400: EUR 567 000 net (according to HOAI § 33 (2) in the calculation of fees only proportionally),

KG 600: EUR 180,000 net.

Schedule:

Commissioning Architects' Office: March 2017,

Submission Preliminary Document (VPU): July 2017,

Original Building Design Documents (BPU): November 2017,

Start of construction: April 2018,

Building: Autumn 2020,

Final accounts: end of 2020.

Construction and dismantling of the exhibition architecture "Faces of China"

Stiftung Preußischer Kulturbesitz | Published May 24, 2017  -  Deadline June 23, 2017
cpvs

Services for Facility Planning according HOAI § 34 - For Heckeshorn 30 (sister houses, house D and E, deck halls) in 14109 Berlin.

Land Berlin – SILB Sondervermögen Immobilien des Landes Berlin, vertreten durch die BIM Berliner Immobilienmanagement GmbH | Published March 16, 2016
Winner
stars v. Alvensleben, Keller & Partner Architekten und Designer
cpvs
71240000, 71200000, 71300000, 71340000

Fitting refugee shelters (architect) for the LAGeSo.

Architectural, engineering and planning services

Bezirksamt Treptow-Köpenick von Berlin | Published October 28, 2017  -  Deadline November 14, 2017
cpvs
71240000

The location of Alte Schule is to be stabilized as a central and important part of the center of Adlershof - Dörpfeldstrasse by the preservation and optimization of all existing uses.

A suitable architecture office is being developed, which develops on the basis of the task design, which enables a qualification of the "Old School" cultural identity location. In addition to the improvement of the basic conditions for the existing uses, consideration is also being made of solutions to expand the range, especially for new beneficiary groups.

The following institutions are established in the Old School:

Office for Further Education and Culture, Department of Culture and Museum: district cultural administration, municipal gallery Old school, art loan / art library,

Office for Continuing Education and Culture, Department of Libraries: Stefan-Heym-Bibliothek,

Sozialamt: Kiezklub Old school with lunch table, Heimatstube Adlershof.

Architectural services for outdoor areas

Senatsverwaltung für Umwelt, Verkehr und Klimaschutz (SenUVK) | Published October 20, 2017  -  Deadline November 21, 2017
cpvs
71222000

Services of the object planning Compensation measures BAB A 114 Renewal including ramps of the connecting points in the district of Pankow in Berlin (short BAB A 114 - object planning compensation measures).

The federal highway A 114 crosses the district of Pankow from Berlin in a north-south direction over a total length of approx. 8.5 km and connects the city center of Berlin with the federal motorway A 10. To maintain the traffic capacity is provided, the BAB 114 inclusive Ramps of the connecting points in the district Berlin-Pankow from the ground up to be renewed and equipped with stand strips. In the area of ​​the motorway A 114 you will find the connection points Schönerlinderstraße, Bucherstraße and Pasewalker Straße. The planning section begins north of the Schönlinderstraße junction and ends south of the Heinersdorfer bridge.

The construction measures according to Fig. § 13 ff. BNatSchG an intervention in nature and landscape. On the basis of this, a nature-specific measures concept was formulated that compensated for the identified conflicts and interventions. The planning performance required for the implementation of the compensation measures according to FIG. § 40 HOAI is to be assigned a landscape architecture office.

Wohnhausgruppe 2328 - architects, engineers

GESOBAU AG, Bereich Einkauf | Published April 15, 2016
cpvs
71248000, 71247000, 71246000, 71245000, 71244000, 71243000, 71242000, 71241000, 71240000, 71000000

Wohnhausgruppe 2328 - architects, engineers

WHG 1,593 architects and engineers

GESOBAU AG, Bereich Einkauf | Published March 9, 2015  -  Deadline April 22, 2015
cpvs
71248000, 71247000, 71246000, 71245000, 71244000, 71243000, 71242000, 71241000, 71240000, 71000000

WHG 1593 Architekten- und Ingenieurleistungen

WHG 1,594 architects and engineers

GESOBAU AG, Bereich Einkauf | Published March 5, 2015  -  Deadline April 15, 2015
cpvs
71248000, 71247000, 71246000, 71245000, 71244000, 71243000, 71242000, 71241000, 71240000, 71000000

WHG 1594 Architekten- und Ingenieurleistungen

Architectural and related services

Land Berlin, vertreten durch Tegel Projekt GmbH | Published October 25, 2017
Winner
Obermeyer Planen + Beraten GmbH
cpvs
71200000

As part of the reuse of Tegel Airport and its development into the research and industry park "Berlin TXL - The Urban Tech Republic", Tegel Projekt GmbH is looking for a competent architecture office for the planning and monitoring of the terminal in the field of building construction and facility management D into an innovation and laboratory center ILZ.

On behalf of the State of Berlin, Tegel Projekt GmbH is developing the areas of the former Tegel Airport to become an industrial and research park for urban technologies, Berlin TXL - The Urban Tech Republic, and a smart residential quarter, the Schumacher Quarter.

6,332 sqm of conversion area) into an innovation and laboratory center for small and medium-sized enterprises, which carry out research and development-intensive activities in the field of urban technologies.

The provision of services is to be geared towards project processing with individual component assignments.

It is necessary to provide services in the following performance phases:

LPh 1: basic determination,

LPh 2: pre-planning,

LPh 3: design planning,

LPh 4: Approval planning,

LPh 5: Development planning,

LPh 6: Preparation of the award,

LPh 7: Participation in the award,

LPh 8: Object monitoring.

The other optional service phases 3 to 8 and performance parts are assigned individually or as a whole according to the regulations of the contract. (see also II.2.11 of the notice)

During the power phases 2 to 8, the AN receives the BIM coordination for terminal D.

Exchange of the designated staff and will be further specified in the context of the invitation to tender.

NOTE:

The invitation to tender is subject to the availability and approval of the corresponding funds in the budget of the state of Berlin.

Tegel Projekt GmbH has been commissioned by the State of Berlin to develop the planning and implementation of concrete utilization plans for Tegel Airport.

The public debate on the decision to hold the Tegel airport is based on Berlin - and thus also by Tegel Projekt GmbH.

In this context, Tegel Projekt GmbH points out that, in principle, all procurement contracts ensure that no long-term commitments are made.

Architectural, construction, engineering and inspection services

Land Berlin c/o Tempelhof Projekt GmbH (Vergabestelle) | Published September 5, 2015  -  Deadline October 5, 2015
cpvs
71000000

The overhaul is needed to bring for the future use / lease the premises to the cutting edge of technology and standard. Among others features, among other content, the preparation and monitoring of negotiations and coordination with the client, the architect, the project and facility management, public authorities, the fire brigade, the test engineers and other institutions concerned. The whole ensemble of the former Tempelhof Airport is a listed building. Equipment level: 15,000.00 m2 of net floor area. The general planning as a superordinate planning all phases intended to cover the following planning disciplines: - Objektplanung performance image building and interiors in accordance with § 34 and Appendix 10 HOAI LP 1-9 - Fachplanung performance image structural engineering in accordance with § 51 and Annex 14 HOAI - Fachplanung performance image Technical equipment according to § 55 and conditioning 15 HOAI conditioning Groups I to VIII no VII LP 1-9: Renovation of supply lines for drinking water and wastewater, rainwater, heating systems / heat supply, ventilation systems, low-voltage systems up to transfer points for future tenant fit - Thermal building physics according to § 3 and Appendix 1 HOAI - Planning Accompanying Surveying § 3 and Appendix 1 HOAI - fire protection engineering by AHO-stitching 17: including planning of an overall fire protection plan of all necessary system components for the component C to the integration and taking into account existing systems - SiGeKo by AHO-Issue 15 - Schadstoffsanierung the window. by AHO-Issue 8

Architectural, engineering and planning services

degewo AG | Published November 3, 2017  -  Deadline December 4, 2017
cpvs
71240000, 71247000, 71248000, 71244000

Architectural and engineering services for:

Building according to § 34 HOAI iV with Annex 10 - Phase of performance 6-9,

Open installations in accordance with § 39 HOAI iV with Annex 11 - Phase of performance 6-9,

Technical equipment according to § 55 HOAI iV with appendix 15 - performance phase 6-9.

Architectural and engineering services for buildings, outdoor installations and technical equipment according to § 34, 39, 55 HOAI i. V. with appendix 10, 11 and 15 in the valid version,

Basic and special services ((eg monitoring of defects during the warranty period, checking the execution planning of the general contractor, evaluation of supplements - processing in the form of decision templates - (evaluation of influence costs / deadlines / advantages and disadvantages) -, checking and value of ancillary offers , Supervision of development and maintenance care at outdoor facilities))

As part of the construction plan valid in the current calendar year, individual new construction projects are carried out in the companies listed under 1.1).

The response time from the call of the services to the start of execution of the architect and engineer services has to be done within 20 days.

Per year of construction year, the following is assumed:

GU - Version 6-8 New construction project.

Commercial version of 3-5 new construction projects.

WHG 14259, 14170, 4210 Architects and Indenieurleistungen

GESOBAU AG, Bereich Einkauf | Published February 23, 2015  -  Deadline April 1, 2015
cpvs
71248000, 71247000, 71246000, 71245000, 71244000, 71242000, 71000000

WHG 14259, 14170, 4210 Architekten- und Indenieurleistungen