Call +44 800 9755 164

Public tenders for architect, architecture in Baunatal Germany

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, engineering and planning services

Baunataler Diakonie Kassel e. V. | Published November 8, 2016
Winner
Foundation 5+ Landschaftsarchitekten und Planer BDLA
cpvs
71240000, 71200000, 71245000, 71247000, 71314310, 71317200, 71327000, 71315000, 71321200, 71323100, 71334000, 71317100, 71222000

Project planning for free plants gem. § 39 HOAI, Phases. 3-9.

Architectural, engineering and planning services

Baunataler Diakonie Kassel e. V. | Published June 29, 2016  -  Deadline August 1, 2016
cpvs

Architectural, engineering and planning services

Architectural, engineering and planning services

Baunataler Diakonie Kassel e. V. | Published July 6, 2016  -  Deadline August 1, 2016
cpvs

Architectural, engineering and planning services

Architectural, construction, engineering and inspection services

Baunataler Diakonie Kassel e. V. | Published July 19, 2016
Winner
Architekten BSH
cpvs

Architectural, construction, engineering and inspection services

Architectural, engineering and planning services

Baunataler Diakonie Kassel e. V. | Published December 4, 2015  -  Deadline January 25, 2016
cpvs
71240000, 71242000, 71245000, 71246000, 71247000, 71313200, 71315000, 71521000

The workshop in Ostring 10, Fuldabrück-Berghausen, is attended by about 130 people with mental health and mental illnesses. The property was built in the 80s and expanded over the years to a warehouse and changes in the usages. To have an examination and decision-making basis on the basis of today's requirements for conversions or periodic inspections, a fire protection concept was created and formally requested a change in use. In line with this concept, the building was inspected for weaknesses in structural fire protection. Due to new accessibility requirements within the workshop, now existing heavy fire doors have to be replaced with modern, barrier-free door systems. Main objects of rescheduling are: 1. manufacture of barrier-free fire doors at the main entrance and to the work areas; 2. Expansion and release of the fire alarm system in the district of Kassel gem. Fire protection design; 3. upgrading of the structural fire protection, z. B. Bulkheads, Brand accounts etc.

Architectural services for buildings

Baunataler Diakonie Kassel e. V. | Published August 8, 2015  -  Deadline September 25, 2015
cpvs
71221000, 71242000, 71243000, 71246000, 71247000, 71315000

An existing workshop hall in Baunatal, for about 30-35 people with disabilities, with a size of approximately 400 m2 to be converted into a vocational training area (BBB). Compares this is a small professional school. Classrooms for IT and other accompanying lessons are included as well as workshop areas for woodworking and metalworking. In addition, training courses for assembly work and sewing are provided. The existing workshop was redeveloped in 2011 for people with disabilities. The conversion of the now last hall is to take place in the same quality and multifunctional design. As part of the permission is obtained later fire alarm system, security lighting, heating supply and a new power distribution have been installed. Before the reconstruction in 2011, this hall was already an assembly hall was, in the meantime used as a storage and is considered to be vocational training in status at a "assembly hall". Thus, any change of use takes place. On the part of the planning approval was merely adapt the fire protection concept, which has already taken place.

Architectural, construction, engineering and inspection services

Baunataler Diakonie Kassel e. V. | Published December 5, 2015  -  Deadline January 25, 2016
cpvs
71000000, 71242000, 71244000, 71245000, 71247000, 71313200, 71315000, 71324000, 71521000

In about 25-30 years old dining room of Baunataler Diakonie Kassel, is provided at ground level where people with disabilities, the acoustic ceilings with integrated ventilation system, heating, acoustic walls and floor are to be modernized. The main objective is to create a barrier-free acoustics and a color concept. It adhere to 200 to 250 people in the dining room. The walls have a lie about 150 mm thick interior insulation on a wooden battens and staggered set planks. This ancient wall covering must be removed and upgraded by a new acoustic wall. The ceilings are to be executed as acoustic ceilings, the old floor must be designed with dry screed and a new lining. Lighting and fire detection systems are corresponding to adapt the existing systems. The air outlets should only be dismantled and reassembled. In this course of this modernization measure, it is also necessary to adjust the seating and table situation to today's standards. It also includes half-height partitions mobile to people after the disability to give retreats. The partitions should also improve the acoustics. There are opportunities to be created to take advantage of the dining room also has a canteen business, and so developing to meet the new requirements. The hygiene rules for dining rooms are to be observed and it is conceptually prove that a subsequent cleaning and maintenance should be performed at low cost. The construction work must be carried out until about 7 m in height.
  • 1