Architectural, construction, engineering and inspection services

Statutární město Brno | Published November 8, 2016  -  Deadline December 6, 2016
The subject of the tender is drawing up a separate project documentation street Stefanik for Zoning (DUR) and the elaboration of a separate project documentation for Building Permit (DSP) and documentation for the execution of the project (PDPs) including geodetic surveying, green inventory, geological survey and supervision. The contract will, inter alia Geological Survey, which will result in structural design of the road and any proposal to exchange subsoil. Part of the event is then also, in case of ambiguity store network, determine their actual position. Furthermore, ZD.

Architectural, engineering and surveying services

Správa a údržba silnic Jihomoravského kraje, příspěvková organizace kraje | Published November 15, 2016  -  Deadline December 1, 2016
The contract includes engineering (IR) required to secure the assent of the authorities. 

The total length of the reconstructed road is 7.22 km.

The aim is to unify width adjustment, respectively. the possibility of adjustments to the category with 7.5 in the rural area treatment.

Further includes a drainage solutions communication in that section.

Furthermore, part of the solution IZ is the assessment of the condition of bridges ev. No .: 386-001, 002, 002A including a repair design, respectively. reconstruction based on the conclusions of the major tours and bridge leaves.

The contract includes engineering (IR) required to secure the assent of the authorities.

IT must be processed to such an extent that it can be used as a preparatory tender documents for entering further stages of project documentation.

Existing asphalt wearing course, patching years ago, it is generally in poor condition and it is very difficult to sustain patching in working condition.

Further causes higher penetration of water into the base layers and thus to permanently reduce the life pavement structure.

Operating stationing derived from nodal points, due to the inconsistency of stationing and actual distances, it must be understood only as a reference databank according to the current date. The section below the castle Veveří - km: 0.000 to 1.320 IZ will be part of the solution.

The total length of the reconstructed road is 7.22 km.

The aim is to unify width adjustment, respectively. the possibility of adjustments to the category with 7.5 in the rural area treatment.

Further includes a drainage solutions communication in that section.

Furthermore, part of the solution IZ is the assessment of the condition of bridges ev. No .: 386-001, 002, 002A including a repair design, respectively. reconstruction based on the conclusions of the major tours and bridge leaves.

In that section, it is assumed complete replacement of pavement surfacing, restoration of damaged structural layers eventually total replacement structural layer according to the findings of a survey conducted diagnostic unification width configuration, as well as the total reconstruction of the auxiliary road body, including the rehabilitation of culverts under the road.

The contract before starting planning the design:

- Diagnostics road

- Verification of the existence and location of utilities,

- Survey utilities,

- Identification of parcels in the given period.

Architectural, engineering and surveying services

Správa a údržba silnic Jihomoravského kraje, příspěvková organizace kraje | Published November 16, 2016  -  Deadline December 2, 2016

The contract is the preparation of project documentation in the degree of DSP, PDPs, SP, including related surveys. The contract includes engineering (IR) needed to provide comments, opinions and documents necessary for filing an application for a building permit to the action; also it is included in the author's supervision (AD) during the implementation of the action.

The subject building is a total reconstruction of the bridge ev. no. 43341-3, which is in very poor condition. It is proposed demolition of the existing bridge and construction of a new (frame reinforced concrete structure) including a one-sided walkway and a makeshift bridge for one-way traffic for the duration of the work.

Architectural, engineering and surveying services

Správa a údržba silnic Jihomoravského kraje, příspěvková organizace kraje | Published November 18, 2016  -  Deadline December 6, 2016

The contract is the preparation of project documentation (DSP step, PDPs, SP) based on DÚR including related surveys. The contract includes engineering (IR) needed to provide comments, opinions and documents necessary for filing an application for a building permit to the action; also it is included in the author's supervision (AD) during the implementation of the action.

Project documentation will address the reconstruction of the road II / 422 in the rural area between the town and municipality Kyjov Svatobořice-Mistřín. The length of the reconstruction of roads II / 422 is 1,094 meters. The project includes demolition of the old and construction of a new bridge 422 to 019 and the repeal of the existing and construction of two new culverts. Because of property rights are not subject to the construction objects SO 151, 152, 211 and and those that deletion of those objects will no longer be necessary. Furthermore, for the same reasons will change the design category S 7.5.

Road II / 422 in the section Kyjov, Svatobořice, Mistřín.

Architectural, construction, engineering and inspection services

Statutární město Brno | Published November 23, 2016  -  Deadline December 8, 2016

The subject of the tender is drawing up a separate project documentation street Stefanik for Zoning (DUR) and the elaboration of a separate project documentation for Building Permit (DSP) and documentation for the execution of the project (PDPs) including geodetic surveying, green inventory, geological survey and supervision. The contract will, inter alia Geological Survey, which will result in structural design of the road and any proposal to exchange subsoil. Part of the event is then also, in case of ambiguity store network, determine their actual position. Furthermore, ZD.

Architectural, engineering and surveying services

Správa a údržba silnic Jihomoravského kraje, příspěvková organizace kraje | Published November 25, 2016  -  Deadline December 15, 2016

The contract is the preparation of project documentation for construction (PDPs), the job list (SP), engineering (IR) necessary to ensure the expression of opinions and documents necessary for filing an application for zoning and building permits for the action. The contract award is also the author's supervision (AD) during the implementation of the action.

Project documentation will address the reconstruction of the road III / 3983 and III / 39914 in the village Tavíkovice and all related buildings.

  • 1