Architectural, engineering and surveying services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published January 17, 2017  -  Deadline February 21, 2017
Temporary bridges on the SBB railway embankment during the construction period (ca.> 36 months) Furthermore, the services include, inter alia, the deliberations of the client and the site managers, attending players selected meetings and preparing reports. 

The monitored objects are as follows:

- Excavation conclusion these constructions;

- Excavation final installation place East / West;

- Existing structures;

- These constructions and Central;

- Railway facilities and buildings in the track area;

- Temporary bridges SBB;

- Protective scaffold railway facilities;

- Temporary Bauhilfsmaßnahmen.

In particular, the following instruments are used in different measurement intervals apply:

- Inclinometer;

- Total station;

- Leveling;

- 3D scanning / profile shots;

- Anchor / Sprieskraftmessung.

Temporary bridges on the SBB railway embankment during the construction period (ca.> 36 months) Furthermore, the services include, inter alia, the deliberations of the client and the site managers, attending players selected meetings and preparing reports.

The monitored objects are as follows:

- Excavation conclusion these constructions;

- Excavation final installation place East / West;

- Existing structures;

- These constructions and Central;

- Railway facilities and buildings in the track area;

- Temporary bridges SBB;

- Protective scaffold railway facilities;

- Temporary Bauhilfsmassnahmen.

In particular, the following instruments are used in different measurement intervals apply:

- Inclinometer;

- Total station;

- Leveling;

- 3D scanning / profile shots;

- Anchor / Sprieskraftmessung.