Call +44 800 9755 164

Public tenders for architect, architecture in Liestal Switzerland

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Redesign of downtown with renewal / replacement utility lines. Engineering Submission

Stadt Liestal Stadtbauamt, Abteilung Tiefbau | Published November 20, 2014  -  Deadline December 17, 2014
cpvs
71000000

Town Hall Street: New Clean water line approximately 240m Possibly Sewer rehabilitation / channel construction (HSK) approximately 240m replacement water line approximately 280m Completely new road construction road design as specified Architect Fish Market: New Clean Water line 180m sewer rehabilitation (HSK) where necessary replacement water line approximately 235m Completely new road construction road design to specification architect Amthausgasse: New Clean water line approximately 230m sewer rehabilitation (HSK) about 160m Completely new road construction road design as specified Architect

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published March 14, 2017  -  Deadline April 20, 2017
cpvs
71000000, 71300000, 71320000, 71322000, 71500000, 71520000

Engineering services:

There are benefits for the phases 32 to provide 41 and 51 to 53.

According to SIA standards 103 and 112 comprise the achievements summarized the following points:

- Creation of measures project with cost estimate and construction schedule;

- Drawing up the documents for execution, optimize costs, construction processes set (construction planning) and Schedules define;

- Coordination with neighboring construction sites;

create tender documents for the entrepreneur and perform procurement of works -;

- The building under contract / specification repair;

- Building into operation, fix defects, create final settlement and delivery of the plans of the executed work.

The coordination with all relevant stakeholders, also one of the ...

Engineering services:

There are benefits for the phases 32 to provide 41 and 51 to 53.

According to SIA standards 103 and 112 comprise the achievements summarized the following points:

- Creation of measures project with cost estimate and construction schedule;

- Drawing up the documents for execution, optimize costs, construction processes set (construction planning) and Schedules define;

- Coordination with neighboring construction sites;

create tender documents for the entrepreneur and perform procurement of works -;

- The building under contract / specification repair;

- Building into operation, fix defects, create final settlement and delivery of the plans of the executed work.

The coordination with all relevant stakeholders, also one of the ...

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published July 5, 2016
Winner
Rapp Infra AG
cpvs
71000000, 71300000, 71320000, 71322000, 71500000, 71520000

Aesch - expansion node Angenstein, Configuration.

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published October 31, 2015
Winner
Jauslin Stebler AG
cpvs
71000000, 71300000, 71320000, 71322000, 71500000, 71520000

Binningen, Doppelspurausbau der BLT-Linie 10/17 und Erneuerung der Kantonsstrasse, Abschnitt Spiesshöfli, Ingenieurauftrag.

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft, Zentrale Beschaffungsstelle | Published June 16, 2015  -  Deadline July 30, 2015
cpvs
71000000, 71300000, 71320000, 71322000, 71500000, 71520000

The tender includes the general planning, the construction and supporting project tendering and realization of: - Tram dual-track expansion in section Spiesshöfli (350 m length), - renewal Bottmingerstrasse, - lifting railway crossings, new superstructure Birsigbrücke, new access tracks property and discontinuations property. There are benefits for the phases 32, 33, 41 and provide 51 to 53.

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published October 1, 2016
Winner
IG Gruner AG / Jauslin Stebler AG
cpvs
71000000, 71300000, 71322000

Allschwil - Shuttle Bachgraben; - Nordtangente. Bypass Hésingue / Hégenheim preliminary project subjects "transport", "construction" and "environmental" including coordination.

Architectural, construction, engineering and inspection services

Bau- und Umweltschutzdirektion Kanton Basel-Landschaft Zentrale Beschaffungsstelle | Published July 5, 2016  -  Deadline August 18, 2016
cpvs
71000000, 71300000, 71322000

The shuttle is closely connected with other road construction projects in the area Allschwil. The preliminary study must take account of these relationships, in particular so that shortcuts and options for possible later additions are safeguarded. Therefore, the project includes the following sections (components):

- Shuttle Bachgraben - Nordtangente

- Contournement Hésingue / Hégenheim

- Tunnel Allschwil

Special boundary condition of the preliminary study is the bi-national framework. This generates the one hand, by the inclusion of the "Contournement Hésingue / Hégenheim" in phase 1 and on the other hand the possibility that the section "Shuttle Bachgraben - Nordtangente" could possibly also affect French territory.

With the preliminary versions are elaborated. Appropriateness and feasibility of options to analyze and prioritize a review. The preliminary study therefore includes the following phases:

- Phase 1: Analysis and development of rough variants (variant subjects and determining the options for Phase 2)

- Phase 2: Description and evaluation studies (effects, appropriateness and feasibility as well as review a basis for decisions to phase 3)

- Phase 3: prioritization and recommendation (total synthesis)

At the end of the work is for the shuttle Bachgraben - are fixed Nordtangente the input into the preliminary project (s) variant (s). For the tunnel Allschwil the variant (of the connection regions in space boots incl.) Is a spatial planning to back track to determine.

  • 1