Call +44 800 9755 164

Public tenders for architect, architecture in Bern...

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

(B16033) a general planning team Wanted in the project competition for architects (general management), civil engineers, technical (CVCRSE) on the Magglingen sports center (FOS)

Office fédéral des constructions et de la logistique (OFCL) | Published December 16, 2016  -  Deadline April 28, 2017
The Federal Office for Buildings and Logistics FBL organizing a project competition for corporate planning teams of architects (general management), civil engineers and technical planners (CVCRSE) to receive various proposals for the completion of the new hall training for the federal Office of sports in Magglingen FOSPO and award OTC contest winner the planning stages. 
The new training hall, including a triple sports hall and a hall of Swiss wrestling accompanied by ancillary, must complement the existing hall Sport-Toto-Halle and must be well integrated architecturally into the existing environment, ie in the ground and the clearing of the existing forest. Inside the training hall, architecture and internal circulations must respond optimally to the needs of education and exploitation.
The organizer expects the competition projects an assertive architecture, in harmony with the existing hall Sport-Toto-Halle and fits perfectly into the landscape.

(B16033) for the project competition in open procedures, a general planning team consisting of architects (producer), construction engineers and building services planners will (HLKKSE) sought for the sports center in Magglingen

Bundesamt für Bauten und Logistik (BBL) | Published December 16, 2016  -  Deadline April 28, 2017
The Federal Office for Buildings and Logistics is organizing a project competition for general planning of architects (producer), civil and building services planners (HLKKSE) to obtain proposals for the construction of a training hall for the Federal Office of Sport in Magglingen and the competition winner the design contract to freehand grant. 
The new training hall, consisting of a 3-fold gym and a resonant hall with adjoining rooms should expand the existing Sports Toto hall and fit architecturally well into the natural terrain and forest clearing. In the training hall the architecture and internal processes support the cause of education and the operation in an optimal manner.
Of the competition projects a strong character architecture is expected which is in good relationship with the existing Sports Toto hall and blends perfectly into the landscape.

Architectural, construction, engineering and inspection services

Bundesamt für Bauten und Logistik (BBL) Projektmanagement Inland II | Published January 11, 2017  -  Deadline February 24, 2017

Treiber der vorliegenden Generalplaner Ausschreibung ist die Einführung der beschleunigten Asylverfahren und die neue daraus resultierende Notwendigkeitfür bzw. restrukturierte Bundesasylzentren.

Diese Gebäude und das zweite Bereiche bilden Teilprojekt of Projekts "Bundesasylzentrum Basel", dessen Ziel die Sanierung of bestehenden Asylzentrums und die Erweiterung um zusätzliche Arbeitsplätze erwàhnten am Standort ist.

Die Generalplanerleistungen umfassen die gemäß Teilleistungen Ordnung SIA LM 112 die Phasen 21, 31, 32, 33, 41, 53 und 51,52.

Die folgende Generalplanerleistungen umfassen Fachgebiete:

- BKP 291 Architekt (Federführung mit Generalplanerfunktion)

- BKP 292 Bauingenieur,

- BKP 293 Elektroingenieur,

- BKP 294 HLKK Ingenieur,

- BKP 295 Sanitàringenieur,

- BKP 298 Gebàudeautomationsingenieur (MSRL).

Die genauen Leistungsbeschreibungen sind zu dem Teil E_Pflichtenheft entnehmen.

This tender for a general planning team follows the introduction of accelerated asylum procedures and the increased need to build or renovate asylum centers that follows.

These buildings and areas represent the second stage of the project "Basel Centre for asylum seekers", which includes the renovation of the existing center and its extension to create additional working places on the site.

The expected overall planning benefits include benefits under the phases 21, 31, 32, 33, 41, 51, 52 and 53 defined in the SIA standard 112.

general planning deliverables are in the following fields:

- CFC 291 Architect (assuming the general planner function);

- CFC 292 Civil Engineer;

- CFC 293 Electrical engineer;

- CFC 294 Engineer HVACR;

- CFC 295 Engineer sanitation;

- CFC 298 technical management engineer building (MCRG);

Detailed descriptions of the services are in Part E, "Pflichtenheft".

This tender for a general planning team follows the introduction of accelerated asylum procedures and the increased need to build or renovate asylum centers that follows.

These buildings and areas represent the second stage of the project "Basel Centre for asylum seekers", which includes the renovation of the existing center and its extension to create additional working places on the site.

The expected overall planning benefits include benefits under the phases 21, 31, 32, 33, 41, 51, 52 and 53 defined in the SIA standard 112.

general planning deliverables are in the following fields:

- CFC 291 Architect (assuming the general planner function);

- CFC 292 Civil Engineer;

- CFC 293 Electrical engineer;

- CFC 294 Engineer HVACR;

- CFC 295 Engineer sanitation;

- CFC 298 technical management engineer building (MCRG);

Detailed descriptions of the services are in Part E, "Pflichtenheft".

(B16025) for the project competition in open procedures for architects (producer), civil engineers, HeaVAC-planning and landscape architectural for the National Aquatic Centre in Tenero (CST), a general planning team is wanted

Bundesamt für Bauten und Logistik (BBL) Projektmanagement Inland III | Published August 26, 2016  -  Deadline January 20, 2017
The Federal Office for Buildings and Logistics (BBL) organized on the premises of Centro Sportivo Tenero (CST) a single-stage project competition in open procedures to solutions for a national swimming center and a concept for the site-planning meaningful placing additional construction phases as accommodation for athletes, a new sports hall and to obtain a material headquarters. 
For the challenging task, the Contracting Authority is seeking a competent general planner with planning teams - architects (producer), civil engineers, HeaVAC planners and landscape architects.

(B16025) The design competition for architects (general management), civil engineers, designers and landscape architects RVCSE concerning the national swimming sports center in Tenero (CST) is aimed at a general planners team

Ufficio federale delle costruzioni e della logistica UFCL Gestione dei progetti Svizzera III | Published August 26, 2016  -  Deadline January 20, 2017
The Federal Office for Buildings and Logistics (BBL) is organizing for the area of ​​the Sports Centre Tenero (CST), a project competition in one phase and in free procedure with the aim of acquiring an architectural proposals side to a sports center swimming, the other a concept plan to enter additional construction phases such as housing for sports, a new gym and a central material in a manner appropriate to the local context. 
For this challenging task the customer looking for a competent general planner with the design team (architects [Directorate-General], civil engineers, RVCSE planners and landscape architects).

(B16025) a general planning team Wanted in the project competition for architects (general management), civil engineers, planners and CVCSE arch. Landscape on the national swimming center in Tenero (CST)

Office fédéral des constructions et de la logistique (OFCL) Gestion de projets Suisse III | Published August 26, 2016  -  Deadline January 20, 2017
The Federal Office for Buildings and Logistics (FBL) is organizing, as part of an open procedure, a project competition to a degree in the field of Tenero Sports Centre, to be submitting proposals for solutions National swimming center and a project for the realization of other stages of construction work, such as accommodation for athletes, a new gym and a central equipment. 
For this demanding task, the research contracting competent general designer at the head of a planning team - architects (general management), civil engineers, planners and landscape architects CVCSE.

Architectural, engineering and planning services

Schweizerische Bundesbahnen SBB Personenverkehr P-OP-FSE-PTF-SEF | Published January 7, 2017  -  Deadline February 14, 2017
Allgemeines 

Die WUVB befindet sich auf dem der SBB-Gleisfeld unterhalb Duttweilerbrücke.

Neubau der wird notwendig, weil in der in der bestehenden Unterflurdrehanlage Serviceanlage G (G SA) in Zürich Triebzüge mit einer Länge von über 100 m nicht bearbeitet werden können.

Wird ebenfalls im Rahmen of Projektes eine für die Anlage Unterflurreinigung (UFR) von Drehgestellen year Triebzügen bis 200 m Länge erstellt, welche nach beispielsweise Personenunfällen erforderlich ist.

Der Standort WUVB hat sich in der Studie "Schliessung SA G und Entwicklung Ersatzstandorte" ideal für den Betrieb als derartiger Anlagen erwiesen, da die beidseitige Einbindung der Gleise die Bearbeitung von bis 202 m Länge Triebzügen ermöglicht. ...

General.

The WUVB from CFF sidings downstream of Duttweilerbrücke bridge.

The new construction is necessary because the current rotating pit installation of SBB Cargo maintenance center (SA G) in Zurich can not deal with multiple units with a length exceeding 100 m.

The project also includes a cleaning installation in bogies pit for multiple units with a maximum length of 200 m; this operation is required eg after accidental injury.

The study "closure G SA and alternative sites for development" concluded that the WUVB site is ideal for the operation of this ...

Waffenplatz St. Luzisteig 7306 Fläsch, total renovation Multipurpose Hall

armasuisse Immobilien Baumanagement | Published December 16, 2016  -  Deadline February 10, 2017
CPV: 71000000 - Architectural, construction, engineering and inspection services
Construction costs plan number (BKP): 291 - Architect

Architectural, construction, engineering and inspection services

Röm.-kath. Gesamtkirchgemeinde Bern und Umgebung, Verwaltung | Published December 8, 2016  -  Deadline February 13, 2017

The Roman Catholic parish total Bern Area would like to realize a new building a MFH with an average expansion rates on plot 743 in Jegenstorf. The building will serve both as an apartment building, as may be used on the ground floor also for sacred use (common rooms). The building should comply with the principles of the recommendation SIA 112/1 2004 "Sustainable Building Construction". The GEAK AA standard to be met.

For this task a Planergemeinschaft is wanted with general planning function.

Architectural, construction, engineering and inspection services

armasuisse Immobilien Baumanagement | Published December 20, 2016  -  Deadline February 10, 2017

Background:

In addition to military assignments the MZH is to off-peak hours for civilian assignments (use by teams) available.

Because of the outdated building and technical substance, the building does not meet the present structural and energy requirements and should therefore be restored.

project Description

The building consists of ...

starting position

In addition to military assignments the MZH is to off-peak hours for civilian assignments (use by teams) available.

Because of the outdated building and technical substance, the building does not meet the present structural and energy requirements and should therefore be restored.

project Description

The building consists of ...

Architectural, construction, engineering and inspection services

armasuisse Einkauf und Kooperationen CC WTO | Published January 6, 2017  -  Deadline February 13, 2017
Dazu auch zählen mitunter Zugehörige Infrastruktur- und Flächenobjekte (Straßen und Plätze, Wald, Flussbau, Felssicherungen, Werkleitungen, Sicherheitsinstallationen Safety-Security). 

Der Auftrag ist in drei aufgeteilt Regionen:

BE)

Region 2: Ticino (TI)

Region 3: (. Aufgrund der Größe of deutschsprachigen Teils der Schweiz, wird die mindestens drei Region 3 in Subregionen aufgeteilt) deutschsprachiger Teil der Schweiz.

Wind: 3000 Stunden pro Jahr.

Works include infrastructure items and related area type objects (roads and squares, forests, water projects, secure rock walls, pipes and underground pipes, safety equipment Safety / Security).

The mandate is subdivided in the following three areas:

Region 1: Western Switzerland (French-speaking Switzerland VS, VD, GE, NE, French BE).

Region 2: Ticino (TI).

Region 3: German speaking part of Switzerland (given the size of the German-speaking part of Switzerland, the region will be divided into three sub-regions at least.)

Volume: 3,000 hours per year.

Works include infrastructure items and related area type objects (roads and squares, forests, water projects, secure rock walls, pipes and underground pipes, safety equipment Safety / Security).

The mandate is subdivided in the following three areas:

Region 1: Western Switzerland (French-speaking Switzerland VS, VD, GE, NE, French BE)

Region 2: Ticino (TI)

Region 3: German speaking part of Switzerland (given the size of the German-speaking part of Switzerland, the region will be divided into three sub-regions at least.)

Volume: 3,000 hours per year.

(B17000) for the planning and implementation of the rehabilitation of the existing Federal Asylum center VZ at Freiburger Strasse 50, in Basel, a general planning team is wanted

Bundesamt für Bauten und Logistik (BBL) Projektmanagement Inland II | Published January 9, 2017  -  Deadline February 24, 2017
CPV: 71000000 - Architectural, construction, engineering and inspection services
Construction costs plan number (BKP): 291 - architect,
292 - Civil,
293 - Electrical Engineer,
294 - HVAC Engineer,
295 - Sanitary Engineer,
298 - Building Automation Engineer

(B17000) Wanted a team headed by a chief planner for the design and implementation of the renovation of the existing federal residential and procedure for asylum seekers, the Freiburgerstrasse 50 in Basel

Office fédéral des constructions et de la logistique (OFCL) Gestion de projets Suisse II | Published January 9, 2017  -  Deadline February 24, 2017
CPV: 71000000 - Architectural, construction, engineering and inspection services
Code of construction costs (CFCs) 291 - Architect
292 - Civil Engineer,
293 - Electrical Engineer,
294 - HVAC Engineer,
295 - Engineer sanitation,
298 - Management Engineer techniquedu building

Transport equipment and auxiliary products to transportation

Schweizerische Bundesbahnen SBB Division Personenverkehr, P-OP-FSE-SE | Published December 10, 2016  -  Deadline January 30, 2017
Allgemeines: 

Neu wird die Architektur APFZ 2.0 umgesetzt, wodurch die aktuellen System (Teil-) ersetzt erneuert oder werden.

A1) und Projektziele -Schwerpunkte:

- Produktersatz und wegen Obsoleszenz "End of Life" von APFZ-Komponenten;

- Umsetzung von zur Massnahmen Sicherstellung der ICT Security;

- Systemerhalt Instandhaltung und der APFZ Komponenten im Fahrzeug sicherstellen;

KIS-Erweiterung) und Fahrzeugplattform (FZPF), die auf allen Regionalverkehr Flotten eingesetzt werden kann;

Qualitätssteigerung der APFZ-Komponenten.

Beschaffungsgegenstand:

B1) Allgemein:

Mit diesen HMI kann unter anderem das Kundeninformationssystem bedient ...

Overview

Now the APFZ 2.0 architecture is implemented, making possible the replacement or renewal (partial) systems in force.

A1) Project Objectives and Priorities

- Replace APFZ components end-of-life or deemed obsolete

- Implementation of measures to ensure the safety ICT (ICT Security)

- Ensure the maintenance of the systems and maintenance of components in the vehicle APFZ

- Harmonize the software for the customer information (incl KIS extension.) And the platform of the vehicle (FZPF) that can be used on all TR fleets

- Strengthening the reliability or quality of components APFZ

Object of the contract

B1) General

SBB emit a tender (public market) on HMI systems (Human Maschine interfaces, touch panel) for the cab ...

GENERAL

Now the APFZ 2.0 architecture is implemented, making possible the replacement or renewal (partial) systems in force.

A1) Project Objectives and Priorities

- Replace APFZ components end-of-life or deemed obsolete

- Implementation of measures to ensure the safety ICT (ICT Security)

- Ensure the maintenance of the systems and maintenance of components in the vehicle APFZ

- Harmonize the software for the customer information (incl KIS extension.) And the platform of the vehicle (FZPF) that can be used on all TR fleets

- Strengthening the reliability or quality of components APFZ

Object of the contract

B1) General

SBB emit a tender (public market) on HMI systems (Human Maschine interfaces, touch panel) for the cab ...

Transport equipment and auxiliary products to transportation

Schweizerische Bundesbahnen SBB, Personenverkehr, P-OP-FSE-SE | Published November 26, 2016  -  Deadline February 6, 2017
Allgemeines 

Neu wird die Architektur APFZ 2.0 umgesetzt, wodurch die aktuellen System (Teil-) ersetzt erneuert oder werden.

A1) und Projektziele -Schwerpunkte

- Produktersatz und wegen Obsoleszenz "End of Life" von APFZ-Komponenten;

- Umsetzung von der Maßnahmen zur Sicherstellung ICT Security;

- Systemerhalt Instandhaltung und der APFZ Komponenten im Fahrzeug sicherstellen;

KIS-Erweiterung) und Fahrzeugplattform (FZPF), die auf allen Regionalverkehr Flotten eingesetzt werden kann;

Qualitätssteigerung der APFZ-Komponenten.

Beschaffungsgegenstand

B1) Allgemein

Die SBB schreiben Fahrgastsprechstellen (Passenger Communication Unit) zum Einsatz als Teil auf den Einstiegsplattformen of Fahrgastalarms sowie als Technische Alternative zum Einsatz bei den Hilferufsprechstellen Plätzen PRM (Passengers with Reduced Mobility, Rollstuhlplätze) Beschaffung aus als öffentlich rechtliche.

C) Beschreibung Hauptangebot

Die SBB erwartet ein Angebot zur Lieferung von:

- 1570 Stück fixed Liefermenge Fahrgastsprechstellen (FGSS);

- 1292 Stück optionale Liefermenge Fahrgastsprechstellen (FGSS);

- 314 Stück optionale Liefermenge der technischen Variant Hilferufsprechstelle (HRSS).

Die exakten Angebotsinhalte sind im Teil 4_Technische Unterlagen übergeordneten im Dokument und dem Anforderungskatalog ersichtlich.

Weitere Details sind zu den Ausschreibungsunterlagen entnehmen.

Allgemeines

Neu wird die Architektur APFZ 2.0 umgesetzt, wodurch die aktuellen System (Teil-) ersetzt erneuert oder werden.

A1) und Projektziele -Schwerpunkte

- Produktersatz und wegen Obsoleszenz "End of Life" von APFZ-Komponenten;

- Umsetzung von der Maßnahmen zur Sicherstellung ICT Security;

- Systemerhalt Instandhaltung und der APFZ Komponenten im Fahrzeug sicherstellen;

KIS-Erweiterung) und Fahrzeugplattform (FZPF), die auf allen Regionalverkehr Flotten eingesetzt werden kann;

Qualitätssteigerung der APFZ-Komponenten.

Beschaffungsgegenstand

B1) Allgemein

Die SBB schreiben Fahrgastsprechstellen (Passenger Communication Unit) zum Einsatz als Teil auf den Einstiegsplattformen of Fahrgastalarms sowie als Technische Alternative zum Einsatz bei den Hilferufsprechstellen Plätzen PRM (Passengers with Reduced Mobility, Rollstuhlplätze) Beschaffung aus als öffentlich rechtliche.

C) Beschreibung Hauptangebot

Die SBB erwartet ein Angebot zur Lieferung von:

- 1570 Stück fixed Liefermenge Fahrgastsprechstellen (FGSS);

- 1292 Stück optionale Liefermenge Fahrgastsprechstellen (FGSS);

- 314 Stück optionale Liefermenge der technischen Variant Hilferufsprechstelle (HRSS).

Die exakten Angebotsinhalte sind im Teil 4_Technische Unterlagen übergeordneten im Dokument und dem Anforderungskatalog ersichtlich.

Weitere Details sind zu den Ausschreibungsunterlagen entnehmen.

Overview

Now the APFZ 2.0 architecture is implemented, making possible the replacement or renewal (partial) systems in force.

A1) Project Objectives and Priorities

- Replace the components arrived APFZ "end of life" or deemed obsolete.

- Implementation of measures to ensure the safety ICT (ICT Security).

- Ensure the maintenance of the systems and maintenance of APFZ components in the vehicle.

- Harmonize the software for the customer information (incl KIS extension.) And vehicle platform (FZPF) that can be used on all TR fleets.

- Strengthening the reliability or quality of APFZ components.

Object of the contract

B1) General

SBB emit a tender (public market) on micro-phones travelers (Passenger Communication Unit) for use on access platforms as part of the alarm travelers, as well as micro-phones Assistance request located at places PRM (Passengers with Reduced Mobility, wheelchair locations) as a technical alternative.

C) Stocked

SBB expect a major tender for the delivery of:

- 1570 units - fixed amount of micro-phones travelers

- 1292 units - Optional amount of micro-phones travelers

- 314 units - Optional amount of technical variant on the request for assistance of micro-phones

The exact contents of the offer is in the upper folder (4_Documents technical part) and the specifications.

D) Rightsholders

Are entitled to apply the above benefits and other divisions of SBB AG holding companies and national transport companies (ETC).

E) Standards, regulations and laws

"The requirements, standards and rules of SBB and UIC in force at the time of submission of bids or contract signature (or signature of

Software-related services

Bundesamt für Bauten und Logistik BBL | Published January 17, 2017  -  Deadline February 21, 2017

(17036) 317 Version 3.0 Revision SSCin

Damit können die nötigen statistischen Informationen für die Analysis Filmmarktes und die namentlich Verteilung der erfolgsabhängigen Filmförderung (Cinema Succes) generiert werden.

Handelt es sich um eine Web-Applikation, die auf folgende to time Technologien basiert:

- Windows Server 2003 und SUN Solaris;

- IIS 6.0;

- Oracle 11g;

- .Net 4.5, ASP.Net.

Die Verantwortung über die Applikation liegt bei der Sektion POKU of BFS in Neuchatel; die Nutzung der Verwaltungs- und von Berechnungsmodule Succes Cinema liegt in der Kompetenz BAK in Bern.

BFS erhält das seine Grunddaten vom externen Partner ProCinema.

In den Arbeitsplatzsystemen wird der User to time standardmässig Internet Explorer 11 verwendet.

Request additional information zur Architektur finden sich in den Dokumenten im Anhang der Offertanfrage.

Die Applikation ist Zweisprachig deutsch-französisch.

Diese Offertanfrage hat zum Ziel, einen kompetenten, zuverlässigen dienstleistungsorientierten und Partner zu finden, der kann folgende Bedürfnisse erfüllen:

• Modernisierung der bestehenden SSCin-Applikation: Allgemeine Auffrischung, bessere Ergonomics, Einbezug Erfahrungen der der Benutzer, Anpassung an neue Bedürfnisse betreffend Schnittstellen statistische und Prozesse, Verbesserung und der Qualitätskontrolle of trackings der Daten.

• Integrierung Revision der der der Berechnung Förderung der gemäß der Schweizer Filme am 01.07.2016 in Kraft getretenen Ordonnanz IFFIm, welche ab 2018 wird werden müssen angewendet auf die Daten 2017 dh spätestens Ende 2017.

• Übernahme der Wartung der Applikation: diese Offertanfrage soll garantieren, dass die gewählte Firma in der Lage ist eine kontinuierliche Dienstleistung, eine Anhäufung of Know-Hows und eine Begleitung während 5 Jahren (mit einer Option auf 5 weitere Jahre) für Wartung, Beratung und Entwicklung neuer Bedürfnisse zu erfüllen.

Dies kann sowohl in der Applikation Veränderungen wie auch im Material betreffen.

• Entwicklung und neuer Implementierung Funktionalitäten im Hinblick auf das Management der Förderprogramme Sektion der im Film BAK.

(17036) 317 Revision SSCin version 3.0.

To apply the Federal Law of 14.12.2001 on culture and film production (LCin) and its Order of 3.7.2002 on film (OCin), the Federal Statistical Office (FSO) and the Federal Office culture (OFC) have set up from 2003 a computer system in the Swiss film area to provide the statistical information needed to analyze the film market and distribute such aid success-related cinema (Cinema success).

This is a web application currently based on the following technologies:

- Windows Server 2003 and SUN Solaris

- IIS 6.0

- Oracle 11g

- .Net 4.5, ASP.Net

The responsibility for implementation lies with the POKU section of the SFO in Neuchatel; the control of management modules and computing Success Cinema is the responsibility of the OFC in Bern.

The SFO gets its database by ProCinema external speaker.

The client stations currently use standard Internet Explorer 11.

Further information on the architecture described in the documents annexed to the tender.

French-German The application is bilingual.

The tender aims to find a competent partner, reliable and service oriented that will meet the following general requirements:

• Upgrade the existing application SSCin: general refreshment, better ergonomics, taking into account the feedback from the users experience, adaptation to new requirements regarding interfaces and statistical processes, improving quality control and monitoring of data.

• Consider revising the calculation of aid to Swiss films of the IFFIm ordinance came into force on 01.07.2016 and which should be taken into account from 2018 in the calculations on the data of 2017, c that is to say by the end of 2017.

• Ensure application maintenance period: this tender should guarantee that the selected company has the resources to provide ongoing service, a capitalization of knowledge and guidance during the 5 years of service (with an option for 5 years extra) to provide support, advice and the development of new needs.

This can involve both changes at the application level and equipment.

• Develop and implement new features for managing incentive programs of the cinema section of the OFC.

  • 1