Call +44 800 9755 164

Public tenders for architect, architecture in Dobrich...

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

Община град Добрич | Published February 17, 2017  -  Deadline March 23, 2017
cpvs
71000000, 71312000, 71500000, 71521000

178 TDA. Construction supervision is carried out in the statutory scope, rec. LSP; Decree № 3 of 2003 on drawing up acts and protocols during construction; Ordinance on the essential requirements for construction and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria. The site has a total floor area 252,69 m 2  2  , Area of ​​basement-6 082,04 m  2  , Total 4 272,20 m  2  . 

6 of LSP in 3 hard copies, each of which is accompanied by electronically in "pdf" and "doc", corresponding to the paper.

6 of the SPA, in three copies, each of which is accompanied by electronically in "pdf" and "doc", corresponding to the paper; Checks performed works in quantities and prices and signing of protocols for acceptance of completed works; Ensuring compliance with safety conditions at work, according to OHS and its regulations; Outturn. control environmental protection during the execution of construction works in accordance with the Law on Environmental / EPA / s LSP and regulations thereto; control of the conformity of materials and products according to the requirements of the Ordinance on the essential requirements and conformity assessment of construction products; Prevents damage to third persons and property due to construction; Checks for / certify the presence of the supervision of the relevant parts of the technical projects on site during execution of works; Certified executive documentation together with the other participants in construction; Brings executive documentation for indefinite storage of the body that issued the building permit and the necessary amount AGCC; Draw conclusive acts after completion of the works, together with the client and contractor design and construction works, which certifies that the construction is performed according to approved projects certified executive documentation requirements for construction and conditions of the contract; Assist the developer after the completion of works and completion of admission tests to make (registered) request for the introduction of the facility into operation, presenting final reports and others, according to the TDA; Control the quality of the works and disturbance of their technological sequence by issuing instructions and orders that fits in the order book of the construction; Attend all the meetings between the participants in the construction process; Take decisions to stop and start construction in coordination with the contracting authority; Report to the contracting authority for problems and measures for their removal.

  • 1