Public tenders for architect, architecture in Namur Belgium

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Academy of Fine Arts: Phase 3b - interior restoration of the building Cobergher - Architecture

Ville de Namur | Published October 21, 2016  -  Deadline November 29, 2016
cpvs
45214220

Academy of Fine Arts: Phase 3b - interior restoration of the building Cobergher - Architecture

Architecture for the construction of an additional floor on part of the wing B and C wing of the Namur CPAS Central Administration Building

CPAS de NAMUR | Published March 30, 2016  -  Deadline May 24, 2016
cpvs
71000000

Architecture for the construction of an additional floor on part of the wing B and C wing of the Central Administration Building CPAS of Namur.

Call for applications - MISSION ARCHITECTURE AND / OR ENGINEERING FOR THE CONSTRUCTION OF A BUS REPAIR SHOP

TEC Namur-Luxembourg | Published May 22, 2015  -  Deadline June 10, 2015
cpvs
71000000

MISSION ARCHITECTURE AND / OR ENGINEERING FOR THE CONSTRUCTION OF A BUS REPAIR SHOP

Call for applications - MISSION OF ARCHITECTURE AND / OR ENGINEERING FOR BUILDING WORKSHOP REPAIR BUS

TEC Namur-Luxembourg | Published December 12, 2014  -  Deadline January 15, 2015
cpvs
71000000

MISSION ARCHITECTURE AND / OR ENGINEERING FOR BUILDING WORKSHOP REPAIR BUS

CALL FOR APPLICATIONS: Charleroi Airport - Complete Mission Copyright architecture project, stability, special techniques and safety coordination on the renovation of the air traffic control tower

SA Société wallonne des Aéroports | Published December 14, 2015  -  Deadline February 8, 2016
cpvs
71000000

This public service contract is the appointment of a Project Author for a full mission architecture, engineering (stability, special techniques, heating, air conditioning, electricity, fire detection, acoustic, ...) and coordination Security on the renovation of the air traffic control tower for the Charleroi regional airport and construction of a temporary tower from which the air traffic control will be implemented during the renovation of the main tower. The estimation of the proposed work is a maximum of € 3 million.

Design (architecture, interior architecture, Design Hub, think "smart building" and engineering supervision for the stability and special techniques (HVAC, electricity, lighting with light design), and Mission PEB) for renovation , processing, and specific equipment of a former sports hall, as well as the development of its surroundings in Hub Creative, called Trakk

BEP EXPANSION ECONOMIQUE | Published March 22, 2016  -  Deadline June 17, 2016
cpvs
71000000

Successful bidders of the two markets will however work together to allow perfect realization and symbiosis of work and studies.

The amenities are designed to rethink and redevelop the building to:

 modernize and adapt to current technical and legal requirements in security matters, accessibility and energy and environmental performance;

 gather in the same space, different functions that allow companies to go through the different stages of the innovation process (problematization, ideation, prototyping, testing), and therefore innovation through rapid process simple, interactive.

The design of this Hub aims to build the new creative ecosystem by promoting transdisciplinary hybridization and collaborative intelligence

The objective is to design an inviting environment for creativity, participation and involvement of different stakeholders.

Architectural, construction, engineering and inspection services

Université de Namur | Published February 11, 2015  -  Deadline March 31, 2015
cpvs
71000000

Multi-year procurement contract services relating to the appointment of a specialized consulting firm associated with an architect to build a pet in favor of the University of Namur.

Mission Complete architecture including the study and control of the realization of the energetics renovation, healthiness and safety of 21 public housing. (PIVERT II)

La Joie du Foyer, s.c.r.l | Published October 13, 2014  -  Deadline November 19, 2014
cpvs
71200000

Mission Complete architecture including the study and control of the realization of the energetics renovation, healthiness and safety of 21 public housing situated a 5002 Saint-Servais, Montagne Saint-Marc. (PIVERT II)

Mission Complete architecture including the study and control of the realization of the energetics renovation, healthiness and safety of 19 public housing. (PIVERT II)

La Joie du Foyer, s.c.r.l | Published October 13, 2014  -  Deadline November 19, 2014
cpvs
71200000

Mission Complete architecture including the study and control of the realization of the energetics renovation, healthiness and safety of 19 public housing is situated Flawinne 5020, Rue Alfred Denis. (PIVERT II)

Mission Complete architecture including the study and control of the realization of the energetics renovation, healthiness and safety of 52 public housing. (PIVERT II)

La Joie du Foyer, s.c.r.l | Published October 13, 2014  -  Deadline November 19, 2014
cpvs
71200000

Mission Complete architecture including the study and control of the realization of the energetics renovation, healthiness and safety of 52 public housing is situated Eghezee 5310, Rue du Bocage. (PIVERT II)

Mission Complete architecture including the study and control of the realization of the energetics renovation, healthiness and safety of 13 public housing. (PIVERT II)

La Joie du Foyer, s.c.r.l | Published October 13, 2014  -  Deadline November 19, 2014
cpvs
71200000

Mission Complete architecture including the study and control of the realization of the energetics renovation, healthiness and safety of 13 public housing is situated Malonne 5020, Rue des Robins. (PIVERT II)

Global Mission architecture for the construction of 13 dwellings (two and four bedrooms) situated Rue de la Grande Campaign 5002 Namur-Saint-Servais

La Joie du Foyer, scrl | Published January 29, 2015  -  Deadline March 9, 2015
cpvs
71000000

Global Mission architecture for the construction of 13 dwellings (two and four bedrooms) situated Rue de la Grande Campaign 5002 Namur-Saint-Servais including Layouts and equipment of surroundings, including PEB health and safety coordination.

Architectural, construction, engineering and inspection services

BEP Expansion Économique | Published December 16, 2016
Winner
AM Atelier l'Arbre d'Or SA — Level Studio — RM architectes + B Solutions + NC & Hham
cpvs
71000000

However, the contractors of the 2 markets will collaborate to allow perfect realization and symbiosis of work and studies.

The amenities are designed to rethink and redevelop the building to:

- Modernize and adapt to current technical and legal requirements in security matters, accessibility and energy and environmental performance,

- To bring together in the same space, different functions that allow companies to go through the different stages of the innovation process (problematization, ideation, prototyping, testing), and therefore innovation through rapid process simple, interactive.

The design of this Hub aims to build the new creative ecosystem by promoting transdisciplinary hybridization and collaborative intelligence.

The objective is to design an inviting environment for creativity, participation and involvement of different stakeholders.

Architectural, construction, engineering and inspection services

BEP Expansion économique | Published March 25, 2016  -  Deadline June 17, 2016
cpvs
71000000

Successful bidders of the two markets will however work together to allow perfect realization and symbiosis of work and studies.

The amenities are designed to rethink and redevelop the building to:

- Modernize and adapt to current technical and legal requirements in security matters, accessibility and energy and environmental performance;

- To bring together in the same space, different functions that allow companies to go through the different stages of the innovation process (problematization, ideation, prototyping, testing), and therefore innovation through rapid process simple, interactive.

The design of this Hub aims to build the new creative ecosystem by promoting transdisciplinary hybridization and collaborative intelligence

The objective is to design an inviting environment for creativity, participation and involvement of different stakeholders.

CORRIGENDUM No. 1 Renovation of sanitary blocks of the Hotel School of the Province of Namur

Province de Namur | Published April 25, 2016  -  Deadline June 7, 2016
cpvs
45000000

Renovation of sanitary blocks of the Hotel School of the Province of Namur (sanitary, HVAC, electricity and Architecture Award in tranches. Tranche ferme: € 447,003 excluding VAT conditional phase: € 163,128 excluding VAT conditional phase Motivation: For reasons budgetary and organizational, work will be carried out in two tranches. This object per motivated by technical reasons leaving the choice to the Provincial College or not to continue the conditional tranche that would carry out this work completely and evenly.

Rogier space - Conservatory and CAV & MA - Grand Carousel

Ville de Namur | Published December 18, 2015  -  Deadline April 25, 2016
cpvs
45000000

Purpose of work: design (architecture, engineering), renovation, conversion, extension and construction of theaters, offices, a conservatory and a catering area, as well as the development of their surroundings. The contract also includes all services in the field of set design, town planning, acoustics, stability, special techniques (HVAC, electricity, lighting with lighting design and sound system), energy and environmental performance ( Mission PEB), internal and external signage design, and security coordination.

Renovation of sanitary blocks of the Hotel School of the Province of Namur

Province de Namur | Published March 15, 2016  -  Deadline May 18, 2016
cpvs
45000000

Renovation of sanitary blocks of the Hotel School of the Province of Namur (sanitary, HVAC, electricity and Architecture Award in tranches. Tranche ferme: € 447,003 excluding VAT conditional phase: € 163,128 excluding VAT conditional phase Motivation: For reasons budgetary and organizational, work will be carried out in two tranches. This object per motivated by technical reasons leaving the choice to the Provincial College or not to continue the conditional tranche that would carry out this work completely and evenly.

Design and development of the heritage lighting of the Citadel of Namur.

VILLE DE NAMUR - Service Citadelle | Published September 14, 2015  -  Deadline November 18, 2015
cpvs
31000000

Purpose of work: Design and implementation of a heritage lighting for the Citadel of Namur which mainly its walls. This market design and implementation, is to study the overall urban planning and landscape architecture, stability, special techniques and energy performance and the completion of development work. By design, the Contracting authority hears all the benefits of a full mission copyright light project - architecture, heritage conservation, stability, special techniques and energy performance, and development of public spaces. For implementation, the Contracting Authority intends to complete the implementation of all the work and the delivery and installation of all equipment necessary to achieve the lighting of the work of the Citadelle, in accordance with the requirements provided by the designer. The realization will include the training of staff of the City of Namur, which will manage it.

Construction work

Bureau économique de la province de Namur | Published February 22, 2017
Winner
Wust-Cobelba
cpvs
45000000

Purpose of work: design (architecture, engineering), renovation, conversion, extension and construction of theaters, offices, a conservatory and a catering area, as well as the development of their surroundings. The contract also includes all services in the field of set design, urban planning, acoustics, stability, special techniques (HVAC, electricity, lighting design with light and sound), the energy and environmental performance ( Mission PEB), the interior and exterior signage design, and security coordination.

Construction work

Ville de Namur | Published December 24, 2015  -  Deadline April 25, 2016
cpvs
45000000

Purpose of work: design (architecture, engineering), renovation, conversion, extension and construction of theaters, offices, a conservatory and a catering area, as well as the development of their surroundings. The contract also includes all services in the field of set design, town planning, acoustics, stability, special techniques (HVAC, electricity, lighting with lighting design and sound system), energy and environmental performance ( Mission PEB), internal and external signage design, and security coordination.