CALL FOR APPLICATIONS FOR ARCHITECTURE ASSIGNMENTS

CVBA VOLKSWONINGBOUW met sociaal oogmerk | Published November 27, 2015  -  Deadline January 11, 2016
cpvs
71000000

architecture contracts for social housing, renovation and infill housing interventions focused on the technical regulations and pay scales in 2011 from the VMSW - place of performance: various projects in the area of ​​the housing company. The area includes the municipalities Herent - Herent - Winksele - Wijgmaal (Leuven) - Haacht - Tildonk - Wespelaar - Boutersem - Tremelo - Baal and Begijnendijk

Study architecture, techniques, stability, EPB and outside talent for setting a Welfare Campus Geel.

Centrum Algemeen Welzijnswerk De Kempen | Published June 30, 2015  -  Deadline September 3, 2015
cpvs
71000000

Study architecture, techniques, stability, EPB and outside talent for setting a Welfare Campus Geel.

Architectural, construction, engineering and inspection services

Sociaal Wonen arro Leuven CVBA-SO | Published March 12, 2015
Winner
TV Ar-Te Stabo
cpvs
71000000

Selection of a design for the architectural aspect of the social housing project Solveld located in Tielt. The design team is responsible for the study architecture, stability, technical and EPB reporting. The safety coordinator is not part of the design team and is appointed separately for both residential and infrastructure.

Invitation to submit a tender - Architecture Job new "multifunctional building Warot '- Simplified negotiated procedure with publication

Gemeente Herent | Published October 18, 2016  -  Deadline November 24, 2016
cpvs
71220000, 71221000

The subject of the contract is to draw up a design including the succession of works on the construction of a new multipurpose building. The contract includes a complete architecture command and includes:

- Architecture Study,

- Stability study, this includes the study's calculations, the preparation of plans and execution of all documents and the inspection of all structural elements of the building.

- The study of the climate and the special techniques,

o HVAC, plumbing, electricity, telephony, data, fire detection and security, intrusion and access control, acoustics and lifts.

o This includes the conceptual study, calculations, drawing up the plans and all execution documents and control of all technical systems and any terminal equipment appropriate for the use of the building.

o Mapping of existing utility lines and connections in the field. Research into existing sewers. Drawing up a plan on which the new connections (water, gas, electricity, telephony and data) are displayed.

o The study of the expansion of the utilities (gas, water, electricity, telephony, data, ...) in consultation with the utility companies.

- Working Environment: these are limited to the immediate area around the construction work.

- Safety coordination (design and implementation)

This will file preparation and follow-up in close consultation with the client happen.

Target date for the commissioning of the building is 31.12.2018.

Program Requirements (memorandum of principles) as Appendix C to the contract documents

  • 1