Architectural, construction, engineering and inspection services

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling Oost-Vlaanderen | Published November 8, 2016
R43 Eeklo - technical study for the impregnation of the southern ring around Eeklo.

Architectural, construction, engineering and inspection services

Directie Gebouwen en Facilitair Beheer | Published December 3, 2016  -  Deadline January 9, 2017

PQQ.

Architectural, construction, engineering and inspection services

TMVW servicelijnen | Published December 6, 2016  -  Deadline January 13, 2017

The city of Ghent wishes to build a sports hall under the viaduct from the B401 to Ledeberg.

Ghent and Farys | TMVW wish themselves to be assisted under this project by an engineering office for receiving the draft contract, which is divided into two phases.

Stage 1 - layout concept study:

The contractor is expected to work out a conceptual study, including a rough estimate and a (phased) schedule in the first phase.

This part of the assignment is carried out at a fixed flat fee.

Phase 2 - preparation of preliminary and design:

After deciding to continue the project, the contractor then asked to carry out the second phase of the contract, viz. The actual design assignment where the conceptual study will be converted into a final draft with final technical specifications and a detailed estimate.

This phase of the contract is carried out based on a percentage fee.

Only if the implementation of the project, based on the concept study of the first phase is approved will be implemented the second phase.

Timing (indicative)

The award of this contract is provided in summer 2017. The period of performance for this contract starts on the day of the launch meeting, as will be notified in the allocation letter.

No later than 10 weeks after the start meeting the designer must then prepare a conceptual study within the first phase of this assignment and submit.

  • 1