Public tenders for architect, architecture in Brussels Belgium

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural and related services

CPAS de Schaerbeek | Published October 25, 2017  -  Deadline November 21, 2017
cpvs
71200000

Voir II.2.4.

Le marché porte sur l'attribution d'une mission complète d'architecture (architecture, techniques spéciales et stabilité) pour la rénovation d'un bâtiment et crèche de 60 places agréées.

If you are looking for a crèche, take care of the prostitute to take care of the crèche and the participant in the chemistry of social and professional careers.

Un relevé du bâtiment a récemment été effectué.

Les candidats sélectionnés pour remettre une offer seront donc invités à prendre connaissance de cette étude d'élaborer leur propre projet architectural.

Le projet sera au minimum «basse energie» et devra egalement shows, dance to the lesson you possible, one example of environmental and large (gestion de l'éau et des déchets, valorisation des toitures, choix des matériaux ...).

Parmi les contraintes qui constituent des enjeux importants du projet, la maîtrise des coûts et des délais et sur le plan architectural, les nécessités de surface des extérieures à destination des enfants et de trouve des solutions adéquates sur le plan des circulations (verticals and horizontals) and the lumière natural.

See II.2.4.

The assignment concerns the award of a complete architecture assignment (architecture, special techniques and stability) for the renovation of a building to a nursery with 60 recognized shelters.

It's about breaking the vicious circle of no crèche - no project - no crèche and working on an emancipation at the social and professional level.

A survey of the building was already being carried out.

Thus, candidates who are selected to submit a quote will be asked to take note of this study to develop their own architecture project.

The project must be at least "low energy" and will, as far as possible, have to perform a broader example function at environmental level (water and waste management, roof utilization, choice of materials, etc.).

Among the commitments that are important challenges for the project, we also notice the following: managing costs and time limits and the architectural level the need to create outer surfaces for the children and find suitable solutions for what the (vertical and horizontal) circulations and the application of natural light.

Design Mission architecture, stability and techniques for design and verification of performance of an expansion of the terminal for a baggage handling system at the Brussels National Airport.

Brussels Airport Company nv | Published December 11, 2015  -  Deadline February 1, 2016
cpvs
71200000, 71240000, 71314000, 71310000

Design Mission architecture, stability and techniques for designing and monitoring the implementation of an expansion of the terminal as part of a new baggage handling system at the Brussels National Airport. The contract comprises: These levels are mainly for the technical equipment of the baggage handling system of the airport. The study of these two additional levels refers to the realization of a hull construction. C. In addition, there must be in the order, from a structural point of view, be taken into account at a later stage possible activities in real estate development above the above-mentioned construction. Taking into account the nature and destination of the above described project is the study of the structure (stability) is an important element of this contract. These studies relate mainly to the first section (section II.1.5) point A) of the order described above. The techniques related to making the baggage handling system is not part of this assignment. The components of the contract: 1. Architecture Study taking into account by Brussels Airport Company established and functional programming requirements: o Sketch and preliminary dossier o Building application file - application for stedenbouwkundige- and environmental; o Detailed design study and drawing up the specifications architecture and stability; o Estimate of the entire project o Coordination and integration of technical installations; o Fire Safety Study; o Monitoring the work; o As built file. 2. Study stability: o Stability Technical soil investigation; o Calculation of structures - Stability Study of the building; o Stability Impact neighboring construction works; o Monitoring the work. 3. Study special techniques: o Design Dossier techniques; o Detailed design study, sizing and specifications are drawn up special techniques; o Monitoring the work; 4. EPB reporting. reference file: BAC / IRE / CON / PPR / 2015/080

Project TR 190 302 - Mission project author - architect to build the new Learning & Development Center Infrabel

Infrabel - Direction Build | Published December 15, 2015  -  Deadline January 14, 2016
cpvs
71221000

Service contract for the appointment of a multidisciplinary team, acting project authorship for the design and construction of the new campus for the Learning & Development Center Infrabel Infrabel the Academy. The new Learning & Development Center Infrabel Infrabel the Academy aims to centralize in one place during the local Infrabel currently scattered throughout Belgium. Infrabel The Academy will offer all users the best teaching and learning conditions, both theoretical and practical, in a framework adapted to the latest technological developments. The site tipped to build this set is the site of the Western Train Station in Sint-Jans-Molenbeek. The site is currently in a state of fallow but should know more or less imminent new property developments (see attached document). In this context, the building that is the subject of this contract will constitute the beginning of a new district, excellent public transport links. The building to be constructed will also be implanted above the current metro line, which the designer must consider. The program includes (see Annex 3): - The creation of premises for lectures, audience, cafeteria, offices (± 6,000 m²); - Premises and a hall for practical courses (± 3,000 m²); - Facilities for external courses with two tracks of work and equipment (foundations, tracks, catenary, signaling ...); - Completions for plantations and the surrounding area, access roads and sidewalks.

Architectural and related services

Brussels Airport Company NV | Published November 12, 2016
cpvs
71200000, 71240000, 71314000, 71310000

Design Mission architecture, stability and techniques for design and verification of performance of an expansion of the terminal for a baggage handling system

Architectural, construction, engineering and inspection services

SC Le Foyer Bruxellois | Published November 14, 2015
Winner
Dewil Architecten & Architecten en studiebureau Denc!studio BVBA
cpvs
71000000

From opdracht is gericht op aanwijzing van een ontwerper die belast wordt puts volledige opdracht betreffende of studie into opvolging van werken voor de renovatie to isolatie van alle buitenomhulsels into installatie van een ventilatiesysteem in social woningen gelegen in de Krakeelstraat n 2 in No. 3, 1000 Brussel puts inachtneming van een duurzame in ecologische visie in aanpak. Van het budget werken beloopt 4089 € 270.39, exclusief studiekosten, btw in aansluitingskosten van andere governed by diverse kosten voorbehouden. Voor deze dienst opdracht wenst of aanbestedende een aan te stellen multidisciplinair team uit een bestaande architect engineer stabiliteit en een, een een engineer bijzondere technieken in EPB adviseur.

Architectural, construction, engineering and inspection services

Société du logement de la région de Bruxelles-Capitale | Published June 16, 2015  -  Deadline July 7, 2015
cpvs
71000000

From opdracht beoogt of aanstelling van een ontwerper belast puts volledige opdracht voor de studie into opvolging van werken voor een van de zware renovatie gebouw puts woningen 6, Willebrord Van Perckstraat 38 1140 Brussel you in het kader van een duurzame in ecologische aanpak. From opdracht heeft meer op bepaald betrekking: 1. aanpak van buitenschil; 2. vervanging van het verwarmingssysteem; 3. diverse werken voor het maken accordance; 4. renovatie into aanpak ins woningen into gemeenschappelijke delen; 5. regenwaterrecuperatie. Het budget van werken beloopt 555 555 EUR. Voor deze dienst opdracht wenst of aanbestedende een aan te stellen multidisciplinair team uit een bestaande en een architect engineer bijzondere technieken.

Construction work

VZW Centrum voor Algemeen Welzijnswerk Limburg, afgekort CAW Limburg, Stoffelsbergstraat 4, 3600 Genk / VZW Pleegzorg Limburg, Emiel Van Dorenlaan 30, bus 2, 3600 Genk / VZW Provinciaal Centrum voor Hulpverlening inzake kindermishandeling, afgekort VK-Limburg, Boerenkrijgsingel 30, 3500 Hasselt en met technische en financiële bijstand van Belfius Bank NV | Published June 21, 2016  -  Deadline August 3, 2016
cpvs
45000000, 71000000

The contract relates to the concept and realization of a common administrative office for the VZW CAW Limburg VZW Foster care Limburg VZW UK Limburg with underground parking and any appurtenances. Net construction cost is estimated at EUR 8 million.

It is a job in construction team (architect, engineering and contractor), the contractor will be responsible for the architectural design, the design brief for stability, acoustics and techniques including a feasibility study of alternative energies. The contractor will also be responsible for the safety coordination in design and execution, the EPB reporting and execution of the works.

Design and construction of a joint headquarters for the VZW CAW Limburg VZW VZW Foster care Limburg and the UK Limburg

VZW Centrum voor Algemeen Welzijnswerk Limburg, afgekort CAW Limburg, Stoffelsbergstraat 4, 3600 Genk / VZW Pleegzorg Limburg, Emiel Van Dorenlaan 30 bus 2, 3600 Genk / VZW Provinciaal Centrum voor Hulpverlening inzake kindermishandeling, afgekort VK-Limburg, Boerenkrijgsingel 30, 3500 Hasselt en met technische en financiële bijstand van Belfius Bank NV | Published June 16, 2016  -  Deadline August 24, 2016
cpvs
45000000, 71000000

The contract relates to the concept and realization of a common administrative office for the VZW CAW Limburg VZW Foster care Limburg VZW UK Limburg with underground parking and any appurtenances. Net construction cost is estimated at € 8,000,000.00.

It is a job in construction team (architect, engineering and contractor), the contractor will be responsible for the architectural design, the design brief for stability, acoustics and techniques including a feasibility study of alternative energies. The contractor will also be responsible for the safety coordination in design and execution, the EPB reporting and execution of the works.

architectural services contract relating to the roofs of the buildings of the Senate

Sénat | Published July 12, 2016  -  Deadline September 30, 2016
cpvs
71200000

The market is a complete package for architecture, stability and security coordination. It includes all the operations required for the study, management and control of renovation works of several roofs of the Senate buildings.

Architectural and related services

Brussels Airport Company NV | Published January 17, 2015  -  Deadline February 20, 2015
cpvs
71200000, 71240000, 71314000, 71310000

Full study architecture, stability, and control techniques, throughout his mission, for the design and execution of two fire stations and appurtenances (warehouses, maintenance garage vehicles, staff parking etc ...) on the Brussels National Airport. 1. Architecture Architectural design taking into account the functional programming and requirements established by Brussels Airport Company: - sketch; - Preliminary design; - Planning application file (application for stedenbouwkundige- and environmental); - Estimate project; - Drafting specifications architecture - stability; - As built file; - Integration techniques - fire safety study; - Verification of the work. 2. Study stability - stability soil investigation; - Structural engineering building; - Stability impact neighboring construction works; - Verification of the work. 3. Study special techniques - plumbing; - HVAC; - Electricity; - Dates; 4. EPB reporting. 5. Study alternative energy Reference. file: BAC / IFC / CON / PPR / 2015/003.

BELGIQUE - Régie des bâtiments - Services d'architecture - Mesurage

Régie des Bâtiments | Published July 11, 2016  -  Deadline September 21, 2016
cpvs
71250000, 71251000, 71240000, 71315300, 71315400

BELGIUM - Belgian Buildings - Architectural services - Measurements

Architectural, engineering and planning services

Infrabel — Area Center | Published September 6, 2016  -  Deadline September 27, 2016
cpvs

- From schetsfase.

- From voorontwerpfase.

- From definitieve voorontwerpfase.

- Het aanvraagdossier voor stedenbouwkundige in milieuvergunningen.

- Het aanbestedingsdossier (tweetalig Frans / Nederlands) voor de werken van opdracht: bestek, plannen ....

- De ondersteuning aan de overheid aanbestedende voor het onderzoek van offered.

- From Technische opvolging van de uitvoering van werken (to administratieve opvolging puts vorderingsstaten, processen-verbaal, ..., wordt door de Infrabel beheerd).

- From voorlopige oplevering.

- From afsluiting van de missie puts eindafrekening, definitieve oplevering in beheersplan.

Architectural, construction, engineering and inspection services

Brussels Airport Company NV | Published December 7, 2016
cpvs
71000000, 71200000, 71230000, 71240000, 71250000, 71300000, 71310000, 71314000, 71315000, 71320000

Mission architecture, stability and techniques for design and control of implementation of the redevelopment of a warehouse building and associated offices at Brussels National Airport (cargo area)

Mission complète d'étude et de suivi des travaux de rénovation et d'isolation de l'ensemble des envelopes extérieures et pose d'un système de ventilation dans les logements sis rue de la Querelle No. 2 (block C) et n ° 3 (block B) at 1000 Bruxelles dans une vision durable et écologique.

De Brusselse Haard CV | Published January 23, 2015  -  Deadline March 2, 2015
cpvs
71000000

The mission is focused on the identification of a designer in charge of the entire contract for the study and monitoring of the works for the renovation, the insulation of all outer casings and the installation of a ventilation system in the social housing located Krakeelstraat n No. 2 and No. 3, Brussels 1000, subject to a sustainable and ecological vision and approach. The budget for the work amounts 4.089.270,39Euro Euro, excluding study costs, VAT and cost of connection control and other miscellaneous expenses reserved. For this contract, the contracting authority wishes to appoint a multidisciplinary team consisting of an architect and an engineer stability, an engineer special techniques and EPB advisor.

Architectural, construction, engineering and inspection services

Foyer du Sud | Published January 7, 2016
Winner
FHW architectes SCPRL — Ecorce SPRL — Stabili D SPRL
cpvs
71000000

From aanbesteding beoogt of aanstelling van een van een indiener project belast die wordt puts volledige onderzoeks- in opvolgingsopdracht voor de werken voor de volledige renovatie van eengezinswoningen in 11 of Kersbeeklaan 143-145, 151, 155-169 in 1190 Brussel, binnen een duurzame in ecologische visie. Het project beoogt bepaald meer op om verschillende huiskwalen lossen you, ze te maken in accordance energieprestaties om van te woningen verbeteren op optimal meest in economische wijze. In het kader van deze opdracht, binnen of budgettaire grenzen, mag indiener van het project of van de verschillende ontwikkelingsmogelijkheden oppervlakten thans van niet om bewoonde dakruimten ontwikkelen mogelijkerwijs Bijkomende woonruimten creëren you. Hij kan eveneens mogelijke uitbreidingen bestuderen in voorstellen voor een zover said betere bewoonbaarheid ten gunste komt. Van het budget werken bedraagt ​​€ 2,215,000. Voor deze wil aanbestedende opdracht overheid multidisciplinair team aanstellen dat een uit een bestaat architect, engineer technieken een speciale en een stabiliteitsingenieur. Er wordt in een Verplichte voorzien optie betreffende of opdracht als EPB-adviseur.

Architectural, construction, engineering and inspection services

Foyer du Sud | Published July 22, 2015  -  Deadline August 31, 2015
cpvs
71000000

From aanbesteding beoogt of aanstelling indiener van een van een project belast die wordt puts volledige onderzoeks- in opvolgingsopdracht voor de werken voor de volledige renovatie van eengezinswoningen in 11 of Kersbeeklaan 143-145, 151, 155-169 in 1190 Brussel, binnen een duurzame in ecologische visie. Het project beoogt om meer verschillende bepaald huiskwalen op lossen you, ze te maken in accordance om energieprestaties van woningen you verbeteren op optimal meest in economische wijze. In het kader van deze opdracht, binnen of budgettaire grenzen, mag indiener van het project of van de verschillende ontwikkelingsmogelijkheden oppervlakten thans van niet om bewoonde dakruimten ontwikkelen mogelijkerwijs Bijkomende woonruimten creëren you. Hij kan eveneens mogelijke uitbreidingen bestuderen in voorstellen voor een zover said betere bewoonbaarheid ten gunste komt. Van het budget werken bedraagt ​​€ 2,215,000. Voor deze wil opdracht aanbestedende overheid multidisciplinair team aanstellen dat een uit een bestaat architect, engineer technieken een speciale en een stabiliteitsingenieur. Er wordt in een voorzien Verplichte optie betreffende of opdracht als EPB-adviseur.

Architectural, construction, engineering and inspection services

Cliniques universitaires Saint-Luc | Published April 20, 2016  -  Deadline May 16, 2016
cpvs
71000000

The Saint-Luc University Clinics want to build a new building to house their activities related to cancer. The new building to be constructed will be located in Woluwe-Saint-Lambert, near the main building of the Saint-Luc University Clinics. This is a facility designed to accommodate conventional hospital activities (about 120 beds), day hospital, consultation and research as well as all administrative services. The center welcomes both adults and children and will enable the multidisciplinary care of patients.

This market is a market of studies and services to the appointment of a multidisciplinary team to study the design and monitoring of the implementation of a cancer center. Besides the medical aspects, the cancer center could include parking and a radiotherapy center (bunkers). The potential development of roads and pedestrian also part of the mission.

The amount of work is estimated between 30 and 40 million euros excluding VAT.

Architectural, construction, engineering and inspection services

Direction infrastructure de transport | Published March 1, 2017  -  Deadline April 4, 2017
cpvs
71000000

This contract is the appointment of an author of the project, responsible for the complete mission of study and monitoring of redevelopment of the area around the old station Laeken including among others the realization of a cycle-pedestrian path and the realization of a collective vegetable garden, in a sustainable and environmental vision.

The contract is part of the core program folder Durable Quarter Contract entitled "Bockstael", approved on 12.23.2013.

The candidate will be responsible for various tasks such as architect, urban planner, landscape architect, specialist in stability and an expert in soil pollution.

In addition, the project owner wishes to inform the citizens in the design of this project through the establishment of a participatory process from the start of the study (from the base set until receipt of project ) to promote the future ownership of the new development by potential users, residents, etc.

For more information, please see the contract notice ( "April 1, 58 1_Avis of marché_Bericht aankondiging.pdf tot") freely available online on the website https://enot.publicprocurement.be in the Annex to this publication.

Huidige of opdracht betreft of aanstelling van een ontwerper, die wordt belast puts volledige studieopdracht into opvolging van herinrichting van de omgeving van het oude station van Laken, puts inbegrip van onder meer een van realisatie voetgangers- in fietsverbinding in van een Gezamenlijke Moestuin, in een duurzame in Milieuvriendelijke benadering.

Opdracht of kadert binnen het programma van het basisdossier van het Duurzaam Wijkcontract "Bockstael", dat werd op 23/12/2013 goedgekeurd.

Zal worden of kandidaat belast puts verschillende opdracht uit een volledige bestaande opdracht als architect, stedenbouwkundige, landschapsarchitect specialist in inzake stabiliteit in bodemverontreiniging.

Bovendien wenst of opdrachtgever burg ...

Architectural, construction, engineering and inspection services

Institut bruxellois pour la gestion de l'environnement | Published September 7, 2016  -  Deadline October 17, 2016
cpvs

Het zal daar rekening multidisciplinair team mee houden van zijn bij de opstelling offered in eveneens moet veel Hechten waarde aan de opwaardering elementen van die.

2400 Vandeuren III

BinHôme cvba | Published May 12, 2016  -  Deadline June 20, 2016
cpvs
71000000

The contract is the appointment of a multidisciplinary team (architect, engineer stability, special techniques engineer), responsible for the complete study mission and monitoring work for the rehabilitation of 49 homes at rue Jean Vandeuren 3, 5, 7, Ground Boondael 583, 585, 587, rue Delbove 2 sis and collective equipment Street Delbove 2A (conditional tranche) in the city VANDEUREN in Ixelles.

Several phases have been scheduled for the renovation of the City Vandeuren (see description in the appendix). This contract relates to Phase III.

The execution of the works contract takes place in one phase.

Financial datas:

• The available budget amounts to a maximum of € 6,290,000 excluding VAT for the renovation of 49 housing (basement and surroundings including, without fees, connection fees and other miscellaneous fees) + € 470,000 excluding VAT sliced conditional, for renovation and / or expansion (basement and surroundings including, without fees, connection fees and other miscellaneous expenses) of community facilities whose function will be determined by the Adjudicator Power.

The conditional phase also includes a mission services (Full Service Study and monitoring architecture and engineering) for the renovation and expansion or the collective sis equipment Street Delbove 2A (basement and surroundings including, without fees, impétrants and miscellaneous).

The conditional phase will be commissioned at the condition to obtain financing for the studies and the above work.

• The fees are set by the scales deviation of BGHM (category B1).

• Amount of the premium given to bidders (at the second stage of the procedure) had not won the contract, having filed a regular and comprehensive supply and have obtained at least 50% of the following items of the opinion of the committee notice: € 2,500 excluding VAT.