Public tenders for architect, architecture in Binche Belgium

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

COMPLETE MISSION ARCHITECTURE TO BUILD A HOUSE FOR REST AND CARE

CPAS de Binche | Published January 6, 2016
cpvs
71000000, 71210000, 71240000, 71250000, 71251000, 71317200, 71317210, 71420000, 71421000, 79932000

This contract relates to a complete architectural work (study and monitoring of the execution of the works) that includes all the common benefits to be paid to the architect, including benefits in the field of stability, infrastructure ( sewers, etc.), acoustics, special techniques (heating, air conditioning, ventilation, electrical, lighting, fire safety and intrusion), the EPB (Energy Performance of Buildings), the interior and exterior signage design, design furniture and outdoor surroundings. The mission of health-safety coordination (CSS) is also part of the services to be provided under this contract. This contract must be performed by a multidisciplinary team (architecture, special technique in engineering, environmental consulting in PEB and coordinating safety and health (CSS). The successful tenderer will also attend the CPAS of Binche, the contracting authority, in . its efforts to obtaining subsidies Thus, a complete application must be made to submit an application to the Walloon Region in order to obtain subsidies essential provision. 'attention is drawn to the fact that a sketch is required for one of the award criteria (see point I.9 of the Special Administrative).

Architectural, construction, engineering and inspection services

CPAS de Binche | Published January 9, 2016
Winner
Association Altiplan, Creative Architecture, Bureau d'études Lemaire
cpvs
71000000, 71210000, 71240000, 71250000, 71251000, 71317200, 71317210, 71420000, 71421000, 79932000

This contract relates to a complete architectural work (study and monitoring of the execution of the works) that includes all the common benefits to be paid to the architect, including benefits in the field of stability, infrastructure ( sewers, etc.), acoustics, special techniques (heating, air conditioning, ventilation, electrical, lighting, fire safety and intrusion), the EPB (Energy Performance of Buildings), the interior and exterior signage design, design furniture and outdoor surroundings. The mission of health-safety coordination (CSS) is also part of the services to be provided under this contract. This contract must be performed by a multidisciplinary team (architecture, special technique in engineering, environmental consulting in PEB and coordinating safety and health (CSS)). The successful tenderer will also attend the CPAS of Binche, Contracting Authority, in its efforts to obtaining subsidies. Thus, a complete application must be made to submit an application to the Walloon region to obtain subsidies. Key provision: the attention is drawn to the fact that a sketch is required for one of the award criteria (see point I.9 of the special specifications).

Architectural, construction, engineering and inspection services

CPAS de Binche | Published September 2, 2015  -  Deadline October 15, 2015
cpvs
71000000, 71210000, 71240000, 71250000, 71251000, 71317200, 71317210, 71420000, 71421000, 79932000

This contract relates to a complete architectural work (study and monitoring of the execution of the works) that includes all the common benefits to be paid to the architect, including benefits in the field of stability, infrastructure ( sewers, etc.), acoustics, special techniques (heating, air conditioning, ventilation, electrical, lighting, fire safety and intrusion), the EPB (Energy Performance of Buildings), the interior and exterior signage design, design furniture and outdoor surroundings. The mission of health-safety coordination (CSS) is also part of the services to be provided under this contract. This contract must be performed by a multidisciplinary team (architecture, special technique in engineering, environmental consulting in PEB and coordinating safety and health (CSS). The successful tenderer will also attend the CPAS of Binche, the contracting authority, in . its efforts to obtaining subsidies Thus, a complete application must be made to submit an application to the Walloon Region in order to obtain subsidies essential provision. 'attention is drawn to the fact that a sketch is required for one of the award criteria (see point I.9 of the special specifications).

New nursing home - Financing a complete mission architecture in order to build a house of rest and care.

CPAS de Binche | Published February 23, 2016
Winner
Belfius Banque
cpvs
66151000

New nursing home - Financing a complete mission architecture in order to build a house of rest and care.

New nursing home "Financing a full mission architecture in order to build a house of rest and care

CPAS de Binche | Published November 9, 2015  -  Deadline December 22, 2015
cpvs
66151000

New nursing home "Financing a full mission architecture in order to build a house of rest and care

Financial market operational services

CPAS de Binche | Published November 12, 2015  -  Deadline December 22, 2015
cpvs
66151000

New nursing home - Financing a full mission architecture in order to build a house of rest and care.

Architectural, construction, engineering and inspection services

Ville de Binche | Published October 25, 2016  -  Deadline December 6, 2016
cpvs
71000000

A complete application must be made to submit an application to the Walloon Region Infrasports.

The tenderer's attention is drawn to the following:

- The project owner will pay particular attention to obtaining a tool with an excellent price / quality, quality being understood both in terms of functionality, durability and versatility but also in terms of control operating costs particularly in terms of energy costs).

Presumably on the plot cadastral survey section D 11D3P0000 number.

Architectural, construction, engineering and inspection services

Ville de Binche | Published December 3, 2016  -  Deadline December 6, 2016
cpvs
71000000

Services d'architecture, services de construction, services d'ingénierie et services d'inspection

Architectural, construction, engineering and inspection services

CPAS de Binche | Published September 11, 2015  -  Deadline October 15, 2015
cpvs
71000000, 71210000, 71240000, 71250000, 71251000, 71317200, 71317210, 71420000, 71421000, 79932000

Services d'architecture, services de construction, services d'ingénierie et services d'inspection

Architectural, construction, engineering and inspection services

Ville de Binche | Published October 26, 2016  -  Deadline December 6, 2016
cpvs
71000000

During extreme weather conditions, the river may overflow and flood part of the site (walks, driveways, the backyard Paternotte castle, ...)

- A brewery (The Binchoise) is implanted in the Faubourg Saint-Paul, and operates a terrace in the park, near the current dance hall.

Architectural, engineering and planning services

CPAS de Binche | Published January 27, 2017
Winner
COSEP SA
cpvs
71240000, 71250000, 71300000, 71330000, 71336000

Derogation: Article 20 of the Royal Decree of 15.7.2011

The price revisions are not applied to the fees of the assistance mission "construction in progress", in derogation of Article 6 § 1 of the Act of 15.6.2006 and Article 20 of Royal decree of 15.7.2011. This is explained on the basis that the amount of these fees is determined by applying a percentage to the final statement of work and therefore will adapt based on the amount of work, which will themselves be subject to clause price-revision.

Architectural, engineering and planning services

CPAS de Binche | Published October 29, 2016  -  Deadline December 6, 2016
cpvs
71240000, 71250000, 71300000, 71330000, 71336000

Derogation: Article 20 of the Royal Decree of 15.7.2011.

The price revisions are not applied to the fees of the assistance mission "construction in progress", by derogation from Article 6, paragraph 1 of the Act of 15.6.2006 and Article 20 of Royal decree of 15.7.2011. This is explained on the basis that the amount of these fees is determined by applying a percentage to the final statement of work and therefore will adapt based on the amount of work, which will themselves be subject to clause price-revision.

  • 1