Call +44 800 9755 164

Public tenders for architect, architecture in Vienna...

Find all Architecture tenders in the world.
Finding business opportunities has never been easier.

Results for architecture. Make a new search!

Architectural, construction, engineering and inspection services

Wiener Krankenanstaltenverbund – Sozialmedizinisches Zentrum Ost – Donauspital und Pflegewohnhaus | Published December 17, 2016  -  Deadline January 17, 2017

Project planning (architecture) for the reconstruction of the pharmacy in the Danube Hospital.

Project planner for the renovation and restoration work at the pharmacy SZO

Wiener Krankenanstaltenverbund - Sozialmedizinisches Zentrum Ost - Donauspital und Pflegewohnhaus | Published December 16, 2016
Project planning (architecture) for the reconstruction of the pharmacy in Donauspital

Architectural, construction, engineering and inspection services

Bundesimmobiliengesellschaft m.b.H. | Published November 4, 2016  -  Deadline January 31, 2017
The aim of the competition is to gain preliminary concepts for the new Biology Centre University of Vienna St. Marx on Location 1030 Wien, Schlachthausgasse 43 (University Building of Life Sciences with approx. 19 000 m  2  Usable area [NF]).

Architectural, engineering and surveying services

Autobahnen- und Schnellstraßen-Finanzierungs-AG | Published December 2, 2016  -  Deadline January 17, 2017

Service survey for submission project.

Service survey for submission project.

Architectural, construction, engineering and inspection services

Asfinag Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft | Published December 8, 2016  -  Deadline January 24, 2017

According ASFINAG construction program are on the S36 Murtal expressway, the section Feistritz - Zeltweg Ost, km 12.603 - km 23,626, RFB Scheifling, conducted extensive road and bridge repairs in 2018/2019. The subject tender includes the implementation of site supervision. The construction project is divided into two execution periods. Between the two phases takes place interruption of construction (winter break). For the services of site supervision during this period is not interrupted. The required at this time personnel should be adjusted accordingly at its own discretion and need. The construction project is divided into 2 execution periods. Phase 1: Period 2018 (construction) phase 2: Period 2019 (construction).

S36 Murtal expressway, INSB Feistritz- Zeltweg Ost, 12.603 to 23.626 km, RFB Scheifling, site supervision.

Architectural and related services

Magistrat der Stadt Wien – Magistratsabteilung 19 | Published December 23, 2016  -  Deadline January 31, 2017

Subject of the negotiation process is the allocation of general planning services for the construction of a holistic, integrative educational institution (Campus) in Vienna 22, Seestadt Aspern North, Plot H3.

The institution consists of a 12-group nursery garden, a 17--class, full-day elementary school and a 16--class, full-day New Middle School and four special education education grant. The training rooms are in eight sectors of education ( "BEAVERS") divided. The campus includes a further treatment area, a wide range of creative spaces including library and lecture hall, two divisible standard gymnasiums and a gymnastics hall on the sports field and a youth center.

The Campus is to be realized with the use of an alternative energy technology concept and exhibit a high degree of autonomy in terms of total energy consumption in operation. thus planning teams are sought with experience in the implementation of alternative energy concepts for the implementation of the planning task in the 1st stage of the negotiation procedure. Candidates in particular to lead the criteria they qualify for the creation of the energy concept.

In the 2nd stage of the negotiation process detailed elaborations and proposals for the subject construction project in both urban / baukünstlerischer, as well as in functional / economic terms are expected.

Architectural, engineering and planning services

Wiener Krankenanstaltenverbund – Sozialmedizinisches Zentrum Ost – Donauspital und Pflegewohnhaus | Published December 24, 2016  -  Deadline January 23, 2017

GMP consulting and project support for the rehabilitation and reconstruction work in the pharmacy SZO.

Architectural, construction, engineering and inspection services

Wiener Krankenanstaltenverbund – Sozialmedizinisches Zentrum Ost – Donauspital und Pflegewohnhaus | Published January 7, 2017  -  Deadline January 17, 2017
Architectural, construction, engineering and inspection services

Architectural, engineering and planning services

Bundesimmobiliengesellschaft mbH | Published January 12, 2017  -  Deadline February 13, 2017

1210 Wien, Veterinärplatz 1, Department of Small Animal Veterinary Medicine, Vienna - General directions search.

Negotiated procedure with prior publication for the general planner Search.

Architectural, construction, engineering and inspection services

Wiener Krankenanstaltenverbund – Sozialmedizinisches Zentrum Ost – Donauspital und Pflegewohnhaus | Published December 17, 2016  -  Deadline January 17, 2017

TGA planning for the reconstruction of the pharmacy in the Danube Hospital.

  • 1