Public tenders for fishing in Poland

Find all Agriculture tenders in the world.
Finding business opportunities has never been easier.

Results for agriculture. Make a new search!

Modernization of Fishing Port in Dziwnow.

Gmina Dziwnów | Published September 14, 2013  -  Deadline October 29, 2013
cpvs
45200000, 45248000, 45248400, 45300000, 45400000, 45241500, 45310000, 45233140, 71322000, 71220000

Object of the contract includes design and construction work to modernize the fishing port in the formula Dziwnow construction design and build and build according to the specifications of the order set out in Annex 9 to the construction projects listed in Annex 11 and the Functional Program - Utilitarian annexed No. 7 (hereinafter PFU). The project will be carried out in Stages III. The stages were separated by a range of documentation. Each step is independent and can be performed separately, but all the steps are necessary for the functioning of the whole project and the achievement of the goal of modernization Fishing Port in Dziwnow. A detailed description of the contract is by Annex No. 9 to the Terms of Reference.

Rent fishing boat to carry out exploratory fishing trips in the area of ​​Polish Maritime Areas for INSPIRE.

 | Published February 14, 2014  -  Deadline February 24, 2014
cpvs
63726700

The contract is to hire a fishing boat to conduct fisheries research in the area of ​​Polish Maritime Areas for INSPIRE project. Fishing will be conducted during the four series, in the areas of research set out in Appendix B to the Terms of Reference: 1) 1 Series covering seven days cruise - implementation in April 2014, 2) 2 series covering five days scheduled - implementation in November 2014, 3) 3rd series covering seven days cruise - implementation in April 2015, 4) 4 series covering five days scheduled - implementation in November 2015, the fishery will be conducted twenty-five sets of gillnets. Networks provide the Purchaser.

DELIVERY OF PRODUCTS Agricultural, farming, fishing, forestry and the like.

 | Published January 10, 2014  -  Deadline January 17, 2014
cpvs
03000000

The contract is for delivery to the registered office ordering the products of agriculture, farming, fishing, forestry and the like in 2014, in the period from the signing of the contract until 31.01.2015, the detailed scope and type of contract is presented in price form annexed hereto ..

Forestry services-rozgradzanie crop Przebrno Forestry, Fishing angles.

Skarb Państwa – Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Elbląg | Published July 30, 2013
Winner
PILAREX Zakład Usług Leśnych Mirosława SzycMątowska 5BRyjewo 82-420 +48 552774431
cpvs
77230000

Forestry services-rozgradzanie crop Przebrno Forestry, Fishing angles - the total length of the removable mesh salaries 1168mb

Modernization of the maritime fishing harbor in Ustronie.

 | Published February 7, 2014  -  Deadline February 24, 2014
cpvs
45000000, 34928430, 45611000, 71332000, 71315000, 71326000, 45442200, 71530000, 71400000, 71410000, 90520000

1.Przedmiotem contract is a comprehensive design and execution of works for the modernization of marine fishing harbor in Ustrori Marine in open sea conditions, as well as commitment to the use made of marine construction of hydraulic structures. 2.Zakres tangible object of the contract includes the execution of complete construction documentation tasks referred to in point. 3.1. Terms of Reference and execution of works, ie build-designed investments made in accordance with and accepted by the Purchaser construction documentation. 3.Szczegółowy description of the contract is contained in the Programme functional and operational, attached as Annex 9 to the ToR. The program is the concept of Pre, which will constitute the starting material for the Contractor's construction documentation, executive and obtain appropriate permits for obtaining a building permit. Based on the documentation approved by the Employer Contractor will implement the investment project. 4.Stan existing: Intended project is located in the Maritime Ustrori. Investment area is located on the 321 kilometer of the coast in the village Ustronie Sea, within the fishing harbor on plot 321/11 cadastral district 0029 Ustronie Marine. The marina includes dolphins exhaust, the beach to the boat harbor and akwatorium a width of 100 meters measured from the shore line. The marina has a slip (ramp) with an area of ​​967.33 sq ft and children cured of the area. 326 sq ft and the access road. The entire area covered by the fitting-size is 0.74 ha. Near the harbor is a massive lift for fishing boats, and on its western side of the pier. The construction of pier is a wooden superstructure founded on steel piles, between which runs a pipeline Ø 800 dump rainwater. The shore is diverse, it creates a beach with a width of 30-40 m and a height of 1.5-2 m to the base of the dunes educated in the form of a shaft. Extraction devices, due to their age and the errors of foundation lifting equipment require complete replacement. Existing dolphin hoods are no longer sufficient support for lifting equipment due to the higher load transferred due to the larger units Hitching than in the original assumptions. Further use of these devices may lead to their total destruction, as well as endanger the health and lives of people that support them and members of the public residing in the vicinity. The investment will be made in the framework of the statutory Maritime Office in Slupsk prepared as part of the investment carried out in the framework: Operational Programme Sustainable Development of the Fisheries Sector and Coastal Fishing Areas 2007-2013. All planned work on the modernization of the infrastructure of the marina used to improve working conditions and safety of sea fishermen whose fishing units stationed in the harbor. The investment will be carried out on the premises and the building (the engine), which is owned by the State Treasury in the permanent administration of the Maritime Office in Slupsk. The objectives of the planned investments are fully consistent with the objective pursued by operations in the framework of an investment in fishing ports, landing sites and shelters. Assistance under this measure shall be granted for improving safety, parking or maintenance of fishing vessels. 5.Technologia and the order of execution of works: As part of the planned investment will exchange all equipment exhaust: exhaust Dalba return with the equipment, wire rope hoist, wire rope lift the foundation and machine room. The project envisages the construction of a transformer station with connections to ensure adequate reserve power to connect all power equipment in the marina. In recent years there has been a tendency storage fishing by fishermen for later sale. This carries implications of increasing power consumption due to the connection of refrigeration equipment. In addition, as part of work related to the replacement of dolphins exhaust technology will be required dredging works. Indications bottom depth at the existing dalbie demonstrated a depth of less than 2.5 m Predicted technology of construction work presupposes the introduction to the area of ​​vessels (barges), from the deck of the work will be done pile drivers associated with punching new dolphin. Therefore, it will be necessary to carry out dredging work as a result of which it will be possible to introduce vessels with a draft of more than 2.5 m The investment provides for an anti-corrosion coating under the paint work (expected to be at least two layers of anti-corrosion coatings and paint reflective layer) in terms of security steel piles and pile mooring pier foundation handling and lift the rope. The project also includes the implementation of protective structures in the form of

The construction of storage building for fishing equipment in the Maritime Fishermen's Haven in Forge.

 | Published November 15, 2013  -  Deadline November 29, 2013
cpvs
45000000, 45100000, 45200000

The contract involves the construction of a warehouse building on fishing equipment in the Maritime Fishermen's Landing in the Forge developed by JM Architects Sp. z oo, Gdańsk 2013, has received funding from the European Fisheries Fund Operational Programme Sustainable Development of the Fisheries Sector and Coastal Fishing Areas 2007-2013, as part of Measure 3.3 Investments in fishing ports, landing sites and shelters. Object of the contract includes the construction of a warehouse building to gear along with land development. The building will be six separate boxes are accessible from outside through individual gates. The building will be designed for the storage of personal fishing equipment (poles, buoys, nets). NOTE! Due to the limited capacity and geometry of roads and traffic organization in the Forge Contractor shall plan transportation of materials to the building of Smithy vehicles with a maximum mass not exceeding 5 tonnes of supplies concrete for ordering a transport vehicles with a maximum pressure of 7.5 t per axle.

Delivery of products of agriculture, farming, fishing, forestry and the like ..

 | Published January 16, 2015  -  Deadline January 26, 2015
cpvs
03000000

The contract is for delivery to the registered office ordering products of agriculture, farming, fishing, forestry and the like in the year 2015, in the period from the signing of the contract until 31.01.2016 r. The detailed scope and type of contract is presented in the form of price, constituting Annex hereto ..

Repair ul. Fishing in Stepnica - the construction of a parking lot.

 | Published June 16, 2014  -  Deadline July 1, 2014
cpvs
45100000, 45200000, 45233120

Repair ul. Fishing Stepnica - building parking lot subject of the project is: Reconstruction of road st. Fisheries involving the construction of parking lots for cars in a lane municipal road. The project includes execution of 10 parking spaces - parking perpendicular dimensions of 2.5 x 5.0 (5.0 x 3.6 for a disabled person). Drainage line at the edge of the carriageway surface of concrete blocks. Contractor is obliged to do under the subject of the contract as-built surveying inventory. Whenever the description of the object of the contract are the names of specific items, products or determine (technical parameters) suggesting products, components specific companies, manufacturers, the Contractor shall be considered that given sample products, and ordering a possibility of application of the elements of products, materials of equivalent properties, parameters technical not worse than assumed in the detailed description of the contract. 3.4. Detailed scope determined by the following annexes to the Terms of Reference: 1 Construction project - Repair ul. Fishing Stepnica - building parking lot - Appendix 1 to the Terms of Reference, 2nd Technical execution and delivery of the works - Repair ul. Fishing Stepnica - building parking lot - Annex 2 to the ToR, the third bill of quantities - Appendix 3 hereto, to the offer must be accompanied by an estimate prepared on the basis of work annexed przedmiarów 3 of the ToR, bill of quantities is a secondary element in the valuation, settlement performed works will be on a lump sum ..

Development of the concept and project documentation development of public space in the area Fish Market - Pobrzeże Fishing with Zieleńcem - ul. Rough ..

 | Published March 26, 2014  -  Deadline April 15, 2014
cpvs
71322000

Develop concepts and design documentation development of public space in the Fish Market - Seashore Fishing with Zieleńcem - ul. Wartka ..

Modernization of sea fishing harbor in Chłopy

 | Published April 16, 2014  -  Deadline May 5, 2014
cpvs
45000000, 34928430, 45311000, 71332000, 71315000, 71326000, 45442200, 71530000, 71400000, 90520000

The contract is a comprehensive design and execution of works for the modernization of marine fishing harbor in Peasants in open sea conditions, as well as the commitment to use marine structures made of hydraulic structures. Scope of the subject of the contract includes the execution of full construction documentation tasks referred to in point. 3.1. Terms of Reference and execution of works, ie build-designed investments made in accordance with and accepted by the Purchaser construction documentation. A detailed description of the contract is contained in the Programme functional and operational, attached as Annex 9 to the Terms of Reference and the Decision of the Minister of Infrastructure and the Environment and the Decision on the environmental conditions, which are attached as Attachments 11 and 12 hereto, and in Annexes 13 and 14 to Terms of Reference, which are respectively a copy of the basic map of the fishing harbor in the Peasants and technical conditions for connection to the power grid. The program is the concept of Pre, which will constitute the starting material for the Contractor's construction documentation, executive and obtain appropriate permits for obtaining a building permit. Based on the documentation approved by the Employer Contractor will implement the investment project. Status quo: Intended project is located in the town of Peasants. Investment area is located in the village of Peasants, within the fishing harbor on plot 305/5 0124 Chlopy cadastral district. The marina includes dolphins exhaust, the beach to the boat harbor and akwatorium. Extraction devices, due to their age and the errors of foundation lifting equipment require complete replacement. Existing dolphin hoods are no longer sufficient support for lifting equipment due to the higher load transferred due to the larger units Hitching than in the original assumptions. Further use of these devices may lead to their total destruction, as well as endanger the health and lives of people that support them and members of the public residing in the vicinity. The investment will be made in the framework of the statutory Maritime Office in Slupsk prepared as part of the investment carried out in the framework: Operational Programme Sustainable Development of the Fisheries Sector and Coastal Fishing Areas 2007-2013. All planned work on the modernization of the infrastructure of the marina used to improve working conditions and safety of sea fishermen whose fishing units stationed in the harbor. The investment will be carried out on land owned by the State Treasury in the permanent administration of the Maritime Office in Slupsk. Technology and the order of execution of works: As part of the planned investment will exchange all equipment exhaust: exhaust Dalba return with the equipment, wire rope hoist, wire rope lift the foundation and machine room. The investment project envisages the construction of a transformer station with connections to ensure adequate reserve power to connect all energy facilities in the marina. In recent years there has been a tendency storage fishing by fishermen for later sale. This carries implications of increasing power consumption due to the connection of refrigeration equipment. It also assumes implementation of the pier handling double-deck, the deck is higher pedestrian communication, the lower deck is the work of the loading and transport facilities of fishing on the dock. Classic design object, communication and transport layers supported on reinforced concrete spans embedded on the grill with steel piles, the width of the deck communication 6m, 4m width of the discharge deck, lower deck equipped with a mooring line of devices odbojowymi and mooring in the head portion mol breaker waves and ice floes . Pier equipped with the necessary lighting system, LED lighting upper deck deck pedestrian communication at the level of the deck, the deck discharge lighting illuminated the upper installed on-board communication, both decks communicatively connected by stairs, the design of the lower deck must be protected against damage from waves and ice cover. On the whole object personal flotation devices arranged in accordance with the regulations. At the junction decks moles of beach or dune naziomem assumed execution abutment with paved thoroughfare dowiązującym object to the existing transport network marina. In addition, as part of work related to the replacement of dolphins exhaust technology will be required dredging works. Indications bottom depth at the existing dalbie demonstrated a depth of less than 2.5 m Predicted technology of construction work presupposes the introduction to the area of ​​vessels (barges), from the deck which

Buying a motor vehicle in order to retrofit the National Guard Fishing - II proceedings

 | Published November 25, 2013  -  Deadline December 3, 2013
cpvs
34113000

The contract is for the purchase of a brand new car powered 4 x 4, in black, for the purposes of the National Guard Fishing - a detailed description of the contract in the appendix hereto.

services incidental to fishing

Ministerstwo Rolnictwa i Rozwoju Wsi | Published June 1, 2012
Winner
Instytut Rybactwa Śródlądowego im. Stanisława Sakowicza ul. Oczapowskiego 10 10-719 Olsztyn POLAND Telephone: +48 895210171 Fax: +48 895240505
cpvs
77700000

Przedmiotem zamówienia jest: wykonanie zadania pn. „Zarybianie polskich obszarów morskich w roku 2012”, polegającego na następujących działaniach: 1) zakupie materiału zarybieniowego bezpośrednio od hodowców ryb albo na dostarczeniu materiału zarybieniowego z własnej produkcji; 2) zakupie znaczków do znakowania materiału zarybieniowego; 3) znakowaniu uzgodnionych partii materiału zarybieniowego; 4) transporcie materiału zarybieniowego; 5) zarybianiu wód zakupionym lub dostarczonym materiałem zarybieniowym; 6) wypłacie premii pieniężnych za zwrócone znaczki do znakowania materiału zarybieniowego oraz za zorganizowanie konkursu dla młodzieży szkolnej, którego uczestnikom przyznawane będą nagrody rzeczowe; 7) obsłudze administracyjnej i technicznej związanej z wykonywanym zadaniem, — odpowiednio zgodnie z planem zarybiania lub planem znakowania.

Modernisation of the Fishing Port in Dziwnow.

Gmina Dziwnów | Published December 19, 2013
Winner
Energopol - Szczecin S.A.ul. św. Floriana 9/13Szczecin 70-464
cpvs
45200000

Object of the contract includes design and construction work to modernize the Port of Fisheries Dziwnow formula construction design and build and build according to the specifications of the order set out in Annex No. 9 on the basis of the construction projects listed in Annex 11 and the Programme Functional Utility annexed No. 7 (hereinafter PFU). The project will be carried out in Stages III. The stages were separated by a range record. Each of the steps is autonomous and can be performed separately, but all the steps are necessary for the functioning of the project and achieve the objective of Modernization of Fishing Port in Dziwnow. A detailed description of the contract is by Annex 9 to the Terms of Reference. Note! - The task is partly to be performed on the system design and build, - the client requires the contractor to assume the rights and obligations arising from the agreement concluded with the successful contractor project documentation - Contractor shall perform as-built inventory.

Reconstruction of the Fishing Port in New Pasłęka - berth.

Dyrektor Urzędu Morskiego w Gdyni | Published November 6, 2013  -  Deadline December 16, 2013
cpvs
45241500

The subject of the contract is the execution of works under the project "Reconstruction of Fishery Port of New Pasłęka - berth" in June 2012 on two parts of the wharves I and II. Area Fishing Port in New Pasłęka is administratively belonging to the municipality of Braniewo, province of Warmia and Mazury. The construction of the quay wall of the parking is tight Brusow length of 10 to 12 m, with a reinforced concrete cap with dimensions of 0.8 x 1.5 m, anchored by ground anchors. Pavement width waterfront (including the cap) is for the section 1 - 6.95 m for section No. 2 - 5.95 m Surface is made of reinforced concrete, laid on a layer of lean concrete and backfill with gravel sand on the geotextile. Elevation of the crown top plate is 1.30 m. The depth of the waterfront section 1 is 2.5 m, the waterfront section 2 is 2.0 m Quay will be equipped with fenders, mooring bollards, ladders and rescue. Due to the short term of the contract, which is 11 months from the signing of the agreement and severe weather conditions prevailing in the region performer for the price should wear appropriate work organization that is bringing to the construction of an adequate amount of equipment and personnel. Berth consists of two parts: - Part No. I is 117.97 m - Part No. II is 105.15 m Contractor in their offer must also take into account the costs associated with the implementation and installation of two tables - information and souvenirs, and in accordance with the bill of quantities and disposal costs storage charges specified materials. Object of the contract must be in accordance with the order specification which is part III of tender documents and the principles set out in the model contract forms part of the second tender documents. Employer provides the opportunity to make significant changes to the agreement in relation to the content of the offer pursuant to Art. Paragraph 144. 1 of the PPA to the extent and under the conditions specified in the model contract forms part II Specification (§ 15 of the standard contract). This contract will be co-financed by the European Union under the Operational Programme "Sustainable Development of Fishery and coastal fishing areas 2007-2013". Project Title: "Reconstruction of the Fishing Port in New Pasłęka - berth."

The study of alternative fishing gear to protect against accidental catch porpoises and seals and birds, in Polish marine areas.

Ministerstwo Środowiska | Published July 17, 2013  -  Deadline August 26, 2013
cpvs
73112000

The study of alternative fishing gear to protect against accidental catch porpoises and seals and birds, in Polish marine areas. The contract is for scientific research in the field of testing under the Polish sea fishing effectiveness of alternative fishing gear such as cod cages, nets in the fibers containing barium sulphate (or other metal used) causing them greater visibility, also using echolocation, and, at least two different types of deterrents pounding - pingers. The aforementioned gear should lead to a reduction of accidental catch of porpoises, seals and birds. Research on the use of pingers should focus on convenience of use from the point of view of the user, who is a fisherman, and the efficiency and the possibility of replacing the batteries. Term of the contract - 30.10.2014 The

Expansion of the fishing harbor in Gdynia Oksywie - Phase II.

 | Published August 26, 2013  -  Deadline September 6, 2013
cpvs
71240000, 71244000, 71246000

Object of the contract includes the development of a multi-sector project-estimate documentation and obtaining all the necessary decisions required by law for the construction of the following facilities in the fishing harbor of Gdynia Oksywie: 1) Slip the mooring and berthing for up to 5 pieces of fishing vessels, 2) 2 winch boat with lifting capacity of approximately 50 kN each, 3) two treadmills to pull the emergency boats, 4) Dalba, 5) Stocks with the positions of the boats, 6) Strengthening of coastline harbor - breakwater, 7) Winch transport and communication route with a length of about 70 m to the transport of the fish - transport of wheeled carts and execution: 1) Plan survey the seabed in the area of ​​dolphin, 2) geological research in the area of ​​the land and the fishing harbor seabed geological studies and the opinion geotechnical foundation conditions in the region of dolphin and sea-bed surveys in the area of ​​dolphin. The detailed scope of the contract includes the execution of: 1) the current map for design purposes, 2) land development projects and construction projects and regulations concerning: a) the construction of harbor facilities and equipment Gdynia - Oksywie, b) construction of the dolphin, c) building to strengthen the line shoreline, 3) technological project marina, 4) a plan seabed survey in the region of dolphin, 5) setting out the investment scheme, 6) an inventory of green trees along with the economy, 7) sampling water management. 8) Temporary traffic organization, 9) investment cost estimates, 10) bill of quantities, 11) technical specifications for execution and acceptance of works, 12) geological surveys of land and geotechnical opinion specifying the category of objects of build-ing and ground conditions and, if necessary to , The documen-tation of ground tests in accordance with the Regulation of the Minister of Transport, Construction and Maritime Economy dated. 25.04.2012 laying down the geotechnical conditions of foundation of buildings (OJ dated. April 27, 2012, item. 463), 13) seabed geological research along with the opinion of geotechnical foundation conditions in the region of dolphin and bottom surveys the sea in the vicinity of dolphins ie geophysical surveys to determine the fate of explosives in the bottom of the sea. The Contractor will be required to obtain: 1) the technical conditions of the network administrators of the areas covered by the investment, 2) extracts and outline of the land registry and to check the legal status of the land in the project area 3) Opinion of the Office of the City Gardener's presence on the project site of trees and shrubs valuable, 4) a set of arrangements, required permits, opinions and decisions necessary to obtain a building permit including but not limited to: a) the decision on environmental conditions, b) a water permit, c) the authorization of the Minister of Infrastructure for construction and use of artificial islands, installations and equipment in the Polish maritime areas, d) allowing the proper local Director of Maritime Office to conduct dredging, e) a reconciliation of temporary traffic organization ..

Expansion of the fishing harbor in Gdynia Oksywie - Phase II.

 | Published September 13, 2013  -  Deadline September 27, 2013
cpvs
71240000, 71244000, 71246000

Object of the contract includes the development of multi-branch of the design-koszto-drawn and obtaining all the necessary required by law, the decision to build the follow-ing objects in the fishing harbor of Gdynia Oksywie: 1) Slip the mooring and berthing for up to 5 pieces of fishing vessels, 2) 2 winch boat with lifting capacity of 50 kN each, 3) two treadmills to pull the emergency boats, 4) Dalba, 5) Stocks with the positions of the boats, 6) Strengthening of coastline harbor - breakwater, 7) Winch transport and communication route with a length of about 70 m the tanker - transport wheeled carts, and execution of: 1) the plan of survey the seabed in the vicinity of dolphins, 2) the geological survey of land in the area and the fishing harbor seabed geological studies, together with the opinion of geotechnical foundation conditions in the region of dolphin and sea-bed surveys dolphins in the area. The detailed scope of the contract includes the execution of: 1) the current map for design purposes, 2) land development projects and construction projects and regulations concerning: a) the construction of harbor facilities and equipment Gdynia - Oksywie, b) construction of the dolphin, c) building to strengthen the line shoreline, 3) technological project marina, 4) a plan seabed survey in the region of dolphin, 5) setting out the investment scheme, 6) an inventory of green trees along with the economy, 7) sampling water management. 8) Temporary traffic organization, 9) investment cost estimates, 10) bill of quantities, 11) technical specifications for execution and acceptance of works, 12) geological surveys of land and geotechnical opinion specifying the category of buildings and the land and, in the event of necessary documentation study of the ground, according to the Minister of Transport, Construction and Maritime Economy dated. 25.04.2012 laying down the geotechnical conditions of foundation of buildings (OJ dated. April 27, 2012, item. 463), 13) seabed geological research along with the opinion of geotechnical foundation conditions in the region of dolphin and bottom surveys the sea in the vicinity of dolphins ie geophysical surveys to determine the fate of explosives in the bottom of the sea. The Contractor will be required to obtain: 1) the technical conditions of the network administrators of the areas covered by the investment, 2) extracts and outline of the land registry and to check the legal status of land in the project area, 3) the opinion of the Office of the City Gardener on the presence of trees on the project site and shrubs valuable, 4) a set of arrangements, required permits, opinions and decisions necessary to obtain a building permit including but not limited to: a) the decision on environmental conditions, b) a water permit, c) the authorization of the Minister of Infrastructure for construction and use of artificial islands , structures and devices in the Polish maritime areas, d) allowing the proper local Director of Maritime Office to conduct dredging, e) a reconciliation of temporary traffic organization ..

Acting as inspectors (with partial tender) for the project Construction of a warehouse building on fishing equipment in the Maritime Fishermen's Landing in the Forge

 | Published November 15, 2013  -  Deadline November 22, 2013
cpvs
71520000

The contract is for Acting as inspectors for the project Construction of a warehouse building on fishing equipment in the Maritime Fishermen's Landing in the Forge developed by JM Architects Sp. z oo, Gdańsk 2013, has received funding from the European Fisheries Fund Operational Programme Sustainable Development of the Fisheries Sector and Coastal Fishing Areas 2007-2013, as part of Measure 3.3 Investments in fishing ports, landing sites and shelters. Object of the contract includes the construction of a warehouse building to gear along with land development. The building will be six separate boxes are accessible from outside through individual gates. The building will be designed for the storage of personal fishing equipment (poles, buoys, nets). Construction documentation and regulatory and technical specifications for the project are available for contractors to inspect the premises of the Employer (room 304) or visit the website www.bip.jastarnia.pl tab Procurement as an attachment to the tender No. 271.15.2013 Mon. Construction of a warehouse building on fishing equipment in the Maritime Fishermen's Landing in the Forge. The implementation of the construction works in the warehouse construction project on fishing equipment in the Maritime Fishermen's Landing in the Forge will be carried out under a contract that Contracting Party shall conclude with the Contractor works emerged from separate proceedings in the open tender of less than 5 000 000 Euro ..

The construction operation of maritime fishing harbor and sieciarni with the necessary technical infrastructure and land development in Dębki.

 | Published September 2, 2014  -  Deadline September 17, 2014
cpvs
45210000

The contract construction works are carried out within the framework of the project entitled. The construction manual sea fishing harbors and sieciarni with the necessary technical infrastructure and land development in Debki. The Contractor will be required to perform all work associated with bringing to obtain and obtaining a use permit in accordance with building regulations. The project will be implemented on the basis of the Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer, the fourth edition of English - Polish 2008 (translation of the first edition in English was published in 1999 by the International Federation of Consulting Engineers and (Fédération Internationale Des Ingénieurs-Conseils - FIDIC) , so-called. FIDIC red. Expenditures Contracting Authority is planning to build m.in .: - Object handling sea fishing harbor with the necessary technical infrastructure - Tower of signaling point; - Four boxes fishing - Sieciarnia with the necessary technical infrastructure ..

Fishing, emergency and other special vessels

Regionalny Zarząd Gospodarki Wodnej w Gdańsku | Published January 26, 2013
Winner
Przedsiębiorstwo Budownictwa Wodnego w Tczewie Sp. z o.o. w likwidacji ul. Czatkowska 2 83-110 Tczew POLAND
cpvs
34513000

Zakup trzech lodołamaczy Rekin, Tygrys, Orka od likwidowanego Przedsiębiorstwa Budownictwa Wodnego w Tczewie.