Call +44 800 9755 164

Public tenders for agriculture in Turku Finland

Find all Agriculture tenders in the world.
Finding business opportunities has never been easier.

Results for agriculture. Make a new search!

The project A13615 - Finnish Museum of Agriculture, Conventional, Construction Exhibition Hall

Senaatti-kiinteistöt | Published July 6, 2017  -  Deadline August 18, 2017
cpvs
45000000

Finnish Museum of Agriculture (Conventional) Loimaa construction of the exhibition hall object collection of a fixed-price turn-key contract, including design, HVAC and plumbing. The exhibition hall will be built exhibit space, teaching space, storage space, as well as public toilets. The building gross surface area of ​​about 1000 brm² and a capacity of about 4500 cubic meters. The project will be tendered as a whole in order to achieve the schedule management. Finnish Museum of Agriculture (Conventional) Loimaa construction of the exhibition hall object collection of a fixed-price turn-key contract, including design, HVAC and plumbing. The exhibition hall will be built exhibit space, teaching space, storage space, as well as public toilets. The building gross surface area of ​​about 1000 brm² and a capacity of about 4500 cubic meters. The project will be tendered as a whole in order to achieve the schedule management.

Works for complete or part construction and civil engineering work

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published February 3, 2016  -  Deadline February 12, 2016
cpvs
45200000

Agriculture, civil engineering works and other Works for complete or particular lot

Agricultural, forestry, horticultural, aquacultural and apicultural services

Varsinais-Suomen ELY-keskus | Published October 29, 2015  -  Deadline December 15, 2015
cpvs
03000000

Salmon Pup delivery of the contracting entity to demonstrate planting locations in Turku (Aurajoki), Eurajoki (Eurajoki) and Nakkila (Kokemäenjoki).

52 Kb Salon eastern by-pass, phase 1

Liikennevirasto | Published December 5, 2014  -  Deadline January 7, 2015
cpvs
45200000

The project improvement efforts include: - Stock Road 52 new road route between Toravuori - Mountain Hill - Road 186 and 110 of the transmission and connection arrangements regarding new connections to build ducted tasoliittyminä and current subscriptions improving the traffic light controlled junctions and kiertoliittymänä, - light traffic arrangements improvement - Environmental Handling and noise shielding - Yksityistie- and agriculture, road systems, - Road - Noise barriers - Crossing Bridges S1 and S2, pedestrian and bicycle underpass walkway S3 and S7 pipe bridge, as well as modifications to existing bridges, S4, S5 and S6 - Street plans K1.

52 Kb Salon eastern by-pass, phase 1 / CORRECTION NOTICE contract notice 05/12/2014

Liikennevirasto | Published December 10, 2014  -  Deadline January 12, 2015
cpvs
45200000

The correction applies to the following points: III.2.3 technical performance of the required minimum level: 3) The tenderer must have in the last five years, as well as in or running on at least one of over EUR 5 million. EUR road or street works. III.2.3 technical performance of presented documents: 4) The list of candidates in the last five years, the implementation of more than 5 million. EUR (VAT 0%), road or street construction projects. The list should include a description of the contract in addition to the information value of the contract, the delivery time and the delivery of the consignee. IV.3.4 requests to participate Time limit for receipt 12.01.2015 13:00 The project improvement efforts include: - Stock Road 52 new road route between Toravuori - Mountain Hill, - Roads 186 and 110 of the transmission and connection arrangements regarding new connections to build ducted tasoliittyminä and current subscriptions improving the traffic light controlled junctions and kiertoliittymänä - bicycle and pedestrian traffic arrangements in improving - Environmental Handling and noise protections - Yksityistie- and agriculture, road systems, - Road - Noise barriers - Crossing Bridges S1 and S2, pedestrian and bicycle underpass walkway S3 and pipe bridge S7, as well as modifications to existing bridges, S4, S5 and S6 - Street plans K1.

Friitala bridge

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published April 27, 2017  -  Deadline June 8, 2017
cpvs
45221110

Requirements for documents relating to the acquisition in accordance with the specified Friitala bridge is located on the highway Ulvilan in 2442 (Siltatie), which exceeds the Kokemäenjoki. Friitala Bridge is a vehicular bridge, on both edges of the pavements. The contract is the total-based turnkey contract, with the exception of a thief evening workarounds and temporary rotation interface 2440 mt / vt-11 intersection area, which is a form of contract to design and implement a ST. The new bridge is of the continuous steel girder (concrete-, a composite), with a total length of about 136 m and HL = 15m. The contract is the main work phases include .: - job-term traffic - construction work early roundabout ST - the detour and the thief tonight's construction of ST - the existing bridge demolition - the new bridge structural steel fabrication - the bridge of agriculture and the construction of intermediate supports - piles of tiles and tulopenkereiden construction - road construction - installation of a new bridge steel structure - reinforced concrete cover slab construction - the bridge surface structures, equipment and appliances, as well as steel structures surface treatment - the detour and the thief tonight's demolition - bridge place finish contract includes job-term traffic arrangements, the existing bridge demolition and construction of a new Friitala bridge to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment. Requirements for documents relating to the acquisition in accordance with the specified

Bridge construction work

Varsinais-Suomen elinkeino-, liikenne- ja ympäristökeskus | Published April 28, 2017  -  Deadline June 8, 2017
cpvs
45221110

The contract includes a job-term traffic, the demolition of the existing bridge and construction of a new bridge Friitala to the extent that it is building in planning documents is defined as all road arrangements, accessories and equipment.

Friitala bridge is located on the highway Ulvilan in 2442 (Siltatie), which exceeds the Kokemäenjoki. Friitala Bridge is a vehicular bridge, on both edges of the pavements.

The contract is the total-based turnkey contract, with the exception of a thief evening workarounds and temporary rotation interface 2440 mt / vt-11 intersection area, which is a form of contract to design and implement a ST.

The new bridge is of the continuous steel girder (concrete-, a composite), with a total length of about 136 m and HL = 15 m.

The contract is the main work phases include .:

- job-term traffic,

- construction work early roundabout ST,

- the detour and the thief tonight's construction ST,

- demolition of the existing bridge,

- the new bridge structural steel fabrication,

- Agriculture and bridge construction beams,

- piles of tiles and tulopenkereiden construction,

- road construction work,

- installation of a new bridge steel structure,

- construction of a reinforced concrete deck slab,

- the bridge surface structures, equipment and devices, and surface treatment of steel structures,

- the detour and the thief tonight's demolition,

- Bridge place finish.

  • 1