Call +44 800 9755 164

Public tenders for agriculture in Oberstdorf Germany

Find all Agriculture tenders in the world.
Finding business opportunities has never been easier.

Results for agriculture. Make a new search!

Engineering design services for the construction of civil engineering works

Markt Oberstdorf, vertreten durch die Sportstätten Oberstdorf | Published November 19, 2015
Winner
Renn Architekten
cpvs
71322000

The following measures are planned for the repair of the Heini-Klopfer-ski jump HS 228: conversion of the starting structure for a new start-up geometry, reprofiling of the jump hill, transforming the lead-out area, reconstruction and extension of the judges' tower, as well as reorganization of the infrastructure. . The engineering services according to § 41 et seq HOAI concern here in particular the following areas: start building: The existing start building should be preserved because of its uniqueness. This is a back-anchored into the slope cantilevered concrete monoliths. The takeoff located outside this static structure is in this case 7.5 m back and repositioned 5.0 m upwards. On the existing geometry, a new start-up profile is set. Jumping hill: The new takeoff position an increase in the stem area is necessary. The landing area is remodeled to achieve shallower landing angle. Discontinued: The entire lead-out area will be extended eastwards. Hereby has to be a complete transformation of the spectator areas. Particular attention is given to the numerous interfaces and functions: sports, operation, maintenance, escape and rescue routes, agriculture. The above measures must be implemented in the 2016th In January 2017, the functioning of the conversions performed are tested under racing conditions with an already scheduled World Cup ski flying.

Engineering design services for the construction of civil engineering works

Markt Oberstdorf, vertreten durch die Sportstätten Oberstdorf | Published July 4, 2015  -  Deadline July 29, 2015
cpvs
71322000

The following measures are planned for the repair of Heini Klopfer ski jump HS 228: conversion of the building for a new start-up geometry, reprofiling of the jump hill, transforming the lead-out area, reconstruction and expansion of the judges' tower, as well as reorganization of the infrastructure. . The engineering services according to § 41 et seq HOAI concern here in particular the following areas: start building: The existing start building should be preserved because of its uniqueness. This is a tied-back into the hillside cantilevered concrete monoliths. The takeoff located outside this static structure is thereby 7.5m back and repositioned 5 m upwards. On the existing geometry, a new start-up profile is set. Jump hill: The new takeoff position to increase the stem area is necessary. The landing area is remodeled to achieve shallower landing angle. Discontinued: The total discharge area will be extended eastwards. This must be a complete transformation of the spectator areas. Particular attention is given to numerous interfaces and functions: sports, operation, maintenance, escape and rescue routes, agriculture. The above measures must be implemented in 2016. In January 2017, the functioning of the conversions performed are tested under racing conditions with an already scheduled World Cup ski flying.
  • 1