Implementation of energy saving measures - secondary technical and agricultural Mohelnice

Olomoucký kraj | Published August 30, 2016
cpvs
45454100

It will also be performed drainage around buildings download rainwater gutter and a new sidewalk around objects, which will be separated from the surrounding terrain cement curb. Reason effectiveness of public procurement: The description needs to be the fulfillment of public contracts fulfilled: In addition to a drainage around buildings download rainwater gutter and a new sidewalk around objects, which will be separated from the surrounding terrain cement curb. Description of the subject of the tender: 60 J. 120mm lambda = 0.036 W / m K. The recommended values ​​of heat transfer coefficient of 1.2 W / m2K. - Insulation of the ceiling - the main school building - above the highest floor plates of mineral wool with a total thickness of 300 mm lambda = 0.039 W / mK 1x140 mm and 1x160 mm with a translation of the boards) and a new diffusion coating foils. In this space the floor will be made of OSB 300. The overlap of the insulator diffusion foil. In this space will be made walkway width 1.2 m of OSB. In connection with insulation facades will adapt existing conductors and existing drains rainwater. Within the insulation will cover the exchange of air throughout the building according to the existing hygiene regulations. Description of the relationship between the subject contract and the client's needs: This project will contribute to further reduce the energy performance of buildings in the region Olomouc region. Expected date of fulfillment of public contracts:

"Implementation of energy efficiency measures - secondary agricultural Prerov - Home of Youth" - additional works no. 2

Olomoucký kraj | Published November 26, 2014
cpvs

The subject of the public contract the execution of works under the additional construction work for the successful completion of construction

Dirt road C2 and C9 in the cadastral Babice u Šternberka

Česká republika-Státní pozemkový úřad | Published May 25, 2015  -  Deadline November 30, 2015
cpvs
45233123

The subject of this research project is the realization Dirt Track C 2 and C 9, both in the category of P4 / 30, and planting of accompanying greenery along these routes - local biocorridor LBK 28 and the element of interaction IP 9 including 3-year follow-up care in the cadastral Babice u Sternberg. VZ is included planting of greenery, which will be completed no later than April 30, 2016 and subsequent care of the greenery will be completed in 2019. Reason effectiveness of public procurement: a) the description needs to be the fulfillment of public contracts achieved: Implementation of rural roads C2 and C9 to exclude agriculture from the center of the village. Realization of interaction element IP9 and local biocorridor LBK28 increases biodiversity areas, ecological stability and retention capacity of the landscape. b) a description of the subject of the contract: The subject of the tender is the implementation of rural roads C2 and C9 and planting of accompanying greenery along these routes - local biocorridor LBK28 and Interaction element IP9, including a 3-year follow-up care. The construction of rural roads will be completed by the end of November 2015, accompanying greenery planting in late April 2016 and subsequent 3-year care will be completed in October 2019. c) a description of the relationship between the subject contract and the client's needs: Implementation of the measures based on the approved plan of common facilities comprehensive zoning adjustments in k.ú. Babice u Sternberg and is consistent with the priorities of the implementation process SZ designed and approved by the municipal council. d) the envisaged deadline for fulfilling the public contract in October 2019 e) a description of the risks associated with the performance of public contracts which the contracting authority took into account when determining the terms and conditions: If a public contract risks may arise to delay the public order due to possible unforeseen adverse weather conditions in construction, which in turn may cause prolonged time necessary for completion of the work.