HIGHER BROD, fountains - WWTP
Město Vyšší Brod | Published November 19, 2015
The main objective of the implementation of the WWTP is the replacement of outdated and inappropriate for the Šumava biodisk activation technology for wastewater treatment plant, which will allow to perform seamlessly limits required by current legislation. Will be increased treatment capacity in terms of substance and hydraulic about 50%, plus the increased stability of cleaning, including the addition of inlet shaft + bypass sewage treatment plant, which will help to reduce the environmental impact both organic substances and nutrients that significantly impair the quality of surface water Vltava River and the Vltava cascade. The condition of the water permit shutdown WTP only for 3 months (from October 1, 2016 to December 31, 2016). Reason effectiveness of public procurement: a) description of needs: The project addresses the WWTP, WTP increase operational reliability and ensure the stability of the cleaning process during the entire calendar year, b) a description of the subject: The subject of the tender is intenzifikacee WWTP Studánky. During the implementation of the project will be replaced with current technology wastewater treatment plant for a new technology, using a building existing WWTP. Mechanical-biological wastewater treatment plant is designed for a prospective state of EO 180. Hydraulic load WWTP will be 25.9 m3 / day. WWTP will consist of individually positioned aeration tanks, as well as two secondary settling tanks. Activation and secondary settling tanks will be located in the service building wastewater treatment plants, where it will be in addition to these tanks and mechanical pre-treatment (fine screen), blowers and sludge treatment. Sludge consists of lagoons, which adjoins to the activation tank. c) a description of the relationship and needs: Implementation of the project will be resolved outstanding problems and meet needs in the field of wastewater treatment. d) the envisaged deadline: August 1, 2016 launch, 01/08/2016 - WTP shutdown from 10.01.2016 to 31.12.2016 - completion of sewage treatment plant by the end of May 2017, this project will be co-financed by the Ministry of Agriculture.