Call +44 800 9755 164

Public tenders for agriculture in Chomutov Czech Republic

Find all Agriculture tenders in the world.
Finding business opportunities has never been easier.

Results for agriculture. Make a new search!

Agricultural, forestry, horticultural, and services in the field of aquaculture and beekeeping

Severočeské doly a.s. | Published October 24, 2014  -  Deadline November 3, 2014
cpvs
77000000, 77211600

Zemědělské, lesnické, zahradnické služby a služby v oblasti akvakultury a včelařství

RIP 06/2013 - Velkošenovský p. In the Big Šenov (0.930 to 1.730)

Povodí Ohře, státní podnik | Published November 27, 2014  -  Deadline June 30, 2016
cpvs
45246000

This is a reconstruction of the flow based on damage from flood flows June 2013. Originally it was fortified in the riverbed dry walling at an average height of 1m. The aim is the reconstruction and capacity streambed taking into account the local situation and fortifications proposal so that it respects the current requirements for fortification channels. The purpose of the building is flood damage and associated protection of surrounding properties and land. In the case of leaving the structure without the intervention threatens to increase the extent of damage retaining walls. As a result of the increasing threat to the surrounding structures also threatens to increase financial cost adjustments. The offer will be financed by the Ministry of Agriculture: 129270 "Removing the effects of floods on state water management assets II"

VD Nechranice - reconstruction of extreme emergency spillway fields - PD and PD DSP DPS

Povodí Ohře, státní podnik | Published July 3, 2015
cpvs

The subject of the public contract is the preparation of project documentation for the application for a building permit and for building construction and all in accordance with Decree 499/2006 Coll., (On construction documentation). The project has resolved to ensure the reconstruction of both extreme emergency spillway Nechranice fields, so as to increase the safety of the water work with the current increase in the retention of 10% compared to the situation before reconstruction. The new barrier construction must be designed for safe handling in the whole range of levels between the upper level of the fixed part and the maximum level of the tank. Reconstruction must be limited capacities of individual spillways. There must be a significant change in the load status of the foundation base. The offer will be financed by the Ministry of Agriculture: "Support for Flood Prevention III" from a subroutine 129 263 - "Project documentation for building management and implementation documentation.

RIP 06/2013 - Okrouhlický p. Skalici in (0.360 to 1.250)

Povodí Ohře, státní podnik | Published November 27, 2014  -  Deadline June 30, 2016
cpvs
45246000

It is a stretch in the urban village vitriol, when during a flood in 2013 (promulgated 2.SPA) damage to the trough (gullies, landslides banks), as well as construction of walls and bottom, thus worsening techn. state fortification that can be assessed in many places, such as emergency - collapse, potholes, damage DNA bases. The aim is to reconstruct the damaged walls, bottom and stabilizing elements (sills, steps) and of the slope (stoves. Rockfill, stone backfill, ensuring the foot of the slope) within a given period. Taking into account the local situation is a technical solution to the construction of fortifications designed to respect the current requirements for fortification channels. The purpose of the building is flood damage and associated protection of surrounding properties and land. In the case of leaving the structure without the intervention threatens to increase the extent of damage retaining walls. As a result of the increasing threat to the surrounding structures also threatens to increase financial cost adjustments. The offer will be financed by the Ministry of Agriculture: 129270 "Removing the effects of floods on state water management assets II"

RIP 06/2013 - Libchavský p. Volfartice in (3.500 to 6.300)

Povodí Ohře, státní podnik | Published November 27, 2014  -  Deadline June 30, 2016
cpvs
45246000

VZ is the subject of the reconstruction of the flow in the urban village Volfartice when during a flood 06/2013 (declared 3.SPA) damage to the riverbed especially construction of walls and bottom, thus worsening techn. state fortification that can be assessed in many places, such as emergency - collapse, potholes, damage DNA bases. . Originally, it was fortified in the riverbed dry walling at an average height of 1m. Taking into account the local situation is a technical solution to the construction of fortifications designed to respect the current requirements for fortification channels. The purpose of the building is flood damage and associated protection of surrounding properties and land. In the case of leaving the structure without the intervention threatens to increase the extent of damage retaining walls. As a result of the increasing threat to the surrounding structures also threatens to increase financial cost adjustments. The offer will be financed by the Ministry of Agriculture: 129270 "Removing the effects of floods on state water management assets II"

VD Nechranice - reconstruction of extreme emergency spillway fields - PD and PD DSP DPS

Povodí Ohře, státní podnik | Published April 9, 2015
cpvs
71300000

The subject of the public contract is the preparation of project documentation for the application for a building permit and construction, and all in accordance with Decree 499/2006 Coll., (On construction documentation). The project has resolved to ensure the reconstruction of both extreme emergency spillway Nechranice fields, so as to increase the safety of the water work with the current increase in the retention of 10% compared to the situation before reconstruction. The new barrier construction must be designed for safe handling in the whole range of levels between the upper level of the fixed part and the maximum level of the tank. Reconstruction must not be limited capacities of individual spillways. There must be a significant change in the load condition at the foundation base. Reason effectiveness VZ: Increase the protective effect of the reservoir and increase the safety and serviceability of the waterworks especially in terms of ensuring the safety of the water work I. category, ie. From the perspective of special flood prevention. The offer will be financed by the Ministry of Agriculture: "Support for Flood Prevention III" from subroutine 129 263 - "project documentation for building management and implementation documentation.

RIP 06/2013 - Kamenice in Czech Kamenici (21.840 to 22.350)

Povodí Ohře, státní podnik | Published November 27, 2014  -  Deadline June 30, 2016
cpvs
45246000

The contract is for the reconstruction of masonry Kamenici in the conservation area town Czech Kamenice damaged by flood flows 06/2013. In the pet section was violated statics of the supporting walls. Masonry is now in disrepair - fault obkladního walls, bulging walls, sometimes occurring depressions behind the wall. In the section No.1 is a sandstone masonry damaged after the flood, section # 2 is a basaltic masonry disturbed in the base. Division No.3 disturbed statics masonry length of 360 m double sided. The section no. 4 lacks stabilization bottom. Due to the age structure of the supporting walls, which are close to 100 years, we expect a growing range of individual failures in the near future. The aim is to reconstruct the streambed taking into account the local situation and fortifications proposal so that it respects the current requirements for fortification channels. The purpose of the building is flood damage and associated protection of surrounding properties and land. In the case of leaving the structure without the intervention threatens to increase the extent of damage retaining walls. As a result of the increasing threat to the surrounding structures also threatens to increase financial cost adjustments. The offer will be financed by the Ministry of Agriculture: 129270 "Removing the effects of floods on state water management assets II"
  • 1